Tdg Gold Corp · TSXV:TDG
Tdg Gold — Investor Presentation (October 2025)
24 slides from Tdg Gold's investor presentation, October 2025
Slide 1: TDG Gold Corp Corporate Presentation October 2025
GSN Gold-Copper Project ANYOX Copper Project TDG Gold Corp Discovering New and Revitalizing Former High-Grade Gold-Copper Deposits in BC Corporate Presentation October 2025 tdggold.com | TSX.V:TDG | OTCQX:TDGGF TDG 1
Slide 2: Forward Looking Statement
Forward Looking Statement Forward-looking statements are made as of the date hereof and, accordingly, are subject to change after such date. Forward-looking statements are provided for the purpose of providing information about management’s current expectations and plans and allowing investors and o
Slide 3: Why TDG Gold?
Why TDG Gold? “ • Copper-gold focused exploration with district-scale, tier one potential • Initial discovery at GSN-AuRORA1 grading 100 m of 2.24 g/t Au & 0.38 % Cu (TDG25-001) NEW MINES ARE • Management team with history of creating shareholder value from DISCOVERED IN THE SHADOWS OF exploration e
Slide 4: A Toodoggone Renaissance
AuRORA1 Au-Ag-Cu Zone (modelled from AMARC public disclosuresa,b,c) A Toodoggone Renaissance With a Renewed Narrative Surface Phase I drilling underway expanding Canada’s newest and highest-grade copper-gold-silver discovery ~$40M treasury with an exclusive, supportive, long- Conceptual Pit term sha
Slide 5: Aurora West Vertical Section Looking East
Aurora West Sees Vertical Section Looking East Seales etnetvs Envelope Width - 200 metres Untested Expansion Potential Tenure Boundary projects along ————ee Topographic Surface _— the plane of Topographic Surface ——_ St TDG25-005: 0.76 g/t Au, 2.0 g/t Ag, 0.23% Cu over 92.85 metres TDG25-005: 0.95 g
Slide 6: Execution and Delivery
Execution and Delivery Michael Kosowan, Chair – former Placer Dome & Sprott Global, mining engineer, owns 7% of TDG Fletcher Morgan, CEO/Director – founder of TDG, qualified management consultant, experienced mining executive Dan O’Brien, CFO – 10+ years as chief financial officer of mineral explora
Slide 7: Share Structure Ownership
Share Structure Ownership Common Shares 275,992,898 Directors & Management 9% Warrants 10,013,919 Skeena Gold & Silver 11% Options 20,021,250 Franklin Templeton 7% Fully Diluted 306,028,067 Merk Investments 5% 52 week High $1.88 CQS Asset Management 5% Daily Trading Average (last 20 trading days) ~$
Slide 8: A District
TDG GOLD CORP TDG FREEPORT-AMARC FREEPORT SUN SUMMIT THESIS A District THESIS THESIS SUN SUMMIT CENTERRA Revitalized Ranch TDG OTHER OTHER TDG SUN SUMMIT • TDG is central to unlocking the Toodoggone District • 100% ownership with low royalties (GSN = 1.5% NSR) Lawyers F R E E P O R T TDG OTHER • Dis
Slide 9: Active Community Engagement
TDG is proud to have the Active Community Engagement opportunity to undertake mineral exploration in the TDG commits to working Strive traditional territories of with Indigenous Strive for minimal ecological disturbance so as to the Nisga’a, Metlakatlaa, not adversely impact traditional access to us
Slide 10: Infrastructure
GSN PROJECT B R I T I S H C O L U M B I A A L A S K A STEWART ANYOX PROJECT Infrastructure TRANSMISSION CORRIDORS TERRACE SMITHERS PRINCE RUPERT PRINCE GEORGE DEEP WATER ACCESS COMMERCIAL AIRPORT TDG 10
Slide 11: Regional Magnetics Data
REGIONAL MAGNETICS DATA BZZ FILTER NEWBERRY ANOMALY NEWLY DEFINED SURFACE CHARGEABILITY ANOMALIES >23 MV/V SHASTA AU-AG N PITTABLE RESOURCE3 TDG PROPERTY OUTLINE ROADS DRILL DEFINED AU-AG-CU MINERALIZATION 1,a,b,c FREEPORT-AMARC AuRORA1 DISCOVERY 2025 IP CHARGEABILITY ANOMALIES >23 MV/V 2,000 METRES
Slide 12: Phase I Drill Hole Location Map
Section Line A Aurora West Property Boundary 300 metres N Phase I Drill Hole Location Map TDG25-007 AuRORA1 Au-Ag-Cu Zone (modelled from AMARC public disclosuresa,b,c) TDG25-003 TDG25-005 TDG25-004 TDG25-001 (vertical) TDG25-002 Drill Hole Legend FREEPORT AMARC 70-30% Section Line A’ Downhole Au His
Slide 13: Aurora West Vertical Section Looking East
Aurora West Sees Vertical Section Looking East Seales etnetvs Envelope Width - 200 metres Untested Expansion Potential Tenure Boundary projects along ————ee Topographic Surface _— the plane of Topographic Surface ——_ St TDG25-005: 0.76 g/t Au, 2.0 g/t Ag, 0.23% Cu over 92.85 metres TDG25-005: 0.95 g
Slide 14: A Toodoggone Renaissance
AuRORA1 Au-Ag-Cu Zone (modelled from AMARC public disclosuresa,b,c) A Toodoggone Renaissance With a Renewed Narrative Surface Phase I drilling underway expanding Canada’s newest and highest-grade copper-gold-silver discovery ~$40M treasury with an exclusive, supportive, long- Conceptual Pit term sha
Slide 15: The Anyox Project
GSN PROJECT ANYOX PROJECT The Anyox Project Revitalizing Former High-Grade Copper Deposits TDG 15
Slide 16: Infrastructure
GSN PROJECT B R I T I S H C O L U M B I A A L A S K A STEWART ANYOX PROJECT Infrastructure TRANSMISSION CORRIDORS TERRACE SMITHERS PRINCE RUPERT PRINCE GEORGE DEEP WATER ACCESS COMMERCIAL AIRPORT TDG 16
Slide 17: The Anyox Project: A Very Unique Opportunity
The Anyox Project A Very Unique Opportunity The History • Past producer of high-grade copper (1914-1935)2 • Historical production ended due to the onset of the Great Depression and lower commodity prices • Developed and drilled only to -300 metres • Former operators lacked modern exploration technol
Slide 18: The VMS Advantage
The VMS Advantage Bousquet – Laronde4 1978 - Present >47 Years Find One - Find Many 92MT 5.0 g/t Au >14.8 Moz Au SURFACE High Grade Critical and Precious Metals Multi-generational Deposits -1,000 metres Extremely Predictable -2,000 metres Proven Geophysical Techniques Accelerate Discovery And Deline
Slide 19: Historical Indications That Support a VMS District
COPPER PENDANT EDEN KITSAULT GHOST TOWN HIDDEN CREEK MINE (ANYOX) KNOB HILL Historical Indications2 That Support a DOUBLE ED VMS District AREA TONNAGE (M) CU GRADE (%) CU (M LBS) BONANZA HIDDEN CREEK (production) 21.8 1.57 754 REDWING DOUBLE ED 2.2 1.30 62.3 BONANZA 0.2 1.00 5.0 REDWING 0.2 2.00 8.0
Slide 20: Anyox vs Bousquet-Laronde vs Kidd Creek
Anyox2 Bousquet – Laronde4 Kidd Creek4 1914 - 1935 1978 - Present 1963 - Present 21 Years >47 Years >50 Years 22 MT 92MT >150MT 1.57% Cu 5.0 g/t Au 3.24 % CuEQ 754 MLBS Cu >14.8 Moz Au 10.7 BLBS CuEQ SURFACE SURFACE U N E X P L O R E D B E L O W T H I S L E V E L -1,000 metres -1,000 metres -2,000 m
Slide 21: 2025 Next Steps
Bousquet – Laronde4 (For Illustrative Purposes) 2025 Next Steps CURRENT TARGET DETECTION LIMITS ~200 METRES 2025 TARGET DETECTION LIMITS ~800 METRES SURFACE SURFACE • Deep penetrating geophysical survey • Source and model historical data -1,000 metres -1,000 metres • Drill test new targets -2,000 me
Slide 22: Accelerated Delivery
Accelerated Delivery Consistent News Flow Q2 2025 Q3 2025 Q4 2025 Q1 2026 GSN-AuRORA1 $15-17M MAPPING, PROSPECTING, SAMPLING COMPLETED GEOPHYSICS (IP) COMPLETED PHASE I DIAMOND DRILLING 7,500M UNDERWAY PHASE II DIAMOND DRILLING 5,000M* ASSAY RESULTS UNDERWAY ANYOX $5M+ DEEP AIRBORNE GEOPHYSICS COMPL
Slide 23: Why TDG Gold?
Why TDG Gold? “ • Copper-gold focused exploration with district-scale, tier one potential • Initial discovery at GSN-AuRORA1 grading 100 m of 2.24 g/t Au & 0.38 % Cu (TDG25-001) NEW MINES ARE • Management team with history of creating shareholder value from DISCOVERED IN THE SHADOWS OF exploration e
Slide 24: Cautionary Language
Cautionary Language Qualified Persons (QP): The scientific and technical information in this presentation has been reviewed, verified and approved by i) Paul Geddes, P.Geo, CEO of Anyox Copper, ii) Steven Kramar, MSc., P.Geo, both who serves as the Anyox Copper Corps. and TDG Gold Corps., qualified