Tdg Gold Corp · TSXV:TDG
Tdg Gold — Investor Presentation (June 2021)
33 slides from Tdg Gold's investor presentation, Jun 15, 2021
Slide 1: Redefining Shasta-Baker-Mets In 2021
Redefining Shasta-Baker-Mets In 2021 TSX.V: TDG HIGH GRADE & BULK TONNAGE POTENTIAL AT PAST PRODUCING GOLD-SILVER MINES IN THE ROAD ACCESSIBLE TOODOGGONE PRODUCTION CORRIDOR Corporate Deck – Jun 15th 2021 www.tdggold.com
Slide 2: Reader Advisory: Forward Looking & Cautionary Statements
Reader Advisory TSX.V: TDG Forward Looking & Cautionary Statements Both these slides and the accompanying oral presentation (if any) contain certain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information wit
Slide 3: Shasta-Baker: The Gateway To The Toodoggone Production Corridor
Shasta-Baker: TSX.V: TDG The Gateway To The Toodoggone Production Corridor 0.90-1.47 Moz AuEq Target* Road Accessible Brownfield Exploration Drill Ready & Well Funded Attractive Valuation * An exploration target is not NI 43-101 compliant and is conceptual in nature. Insufficient exploration has bee
Slide 4: Mining Leases & Permitted Mine Area
Mining Leases & Permitted Mine Area TSX.V: TDG Mining Leases • Baker Mining Lease (243451) expires Sep 10th 2051. • Shasta Mining Lease (243454) expires Jun 13th 2050. Permitted Mine Area • 175 hectares including historical mine workings at Baker A and B veins, Baker mill and camp, tailings storage
Slide 5: Meet The Team: Leadership
Meet The Team: Leadership TSX.V: TDG Andrew G. French, MSc, P.Geo., Chair & Director Matt Filgate, BSc, Director Andrew is a Geologist and Senior Mining Fund Analyst with 26 years of Matt is Regional Project Geologist for Talisker Resources Ltd. with a focus on international mining resource fund exp
Slide 6: Current Share & Capital Structure
Current Share & Capital Structure TSX.V: TDG Share Structure Ownership • 64,423,459 common shares • 3,510,729 C$0.45 warrants (expire Sep 19th 2023) • 5,525,021 C$0.45 warrants (expire Dec 11th 2023) • 66,668 C$0.20 options (CPC, expire Sep 19th 2023) • 3,487,500 C$0.35 options (expire Feb 1st 2026)
Slide 7: Active Community Engagement
Active Community Engagement TSX.V: TDG TDG commits to working Strive TDG is proud to have with Indigenous Strive for minimal ecological disturbance so as to not adversely impact traditional access to use the opportunity to communities to: of the land. undertake mineral Recognise Build Capacity explo
Slide 8: Corporate Strategy
Corporate Strategy TSX.V: TDG A Clear Path To Creating Summer 2021: Minesite Drilling Shareholder Value Detailed analysis of geological, geophysical and geochemical data Winter-Spring 2021: has prioritized minesite drill targets in 2021 as well as new exploration Target Definition ✓ opportunities. S
Slide 9: The Toodoggone Production Corridor
The Toodoggone Production Corridor TSX.V: TDG A road accessible 60 km long corridor with multiple former producing high-grade Au-Ag mines and several prospective bulk tonnage Au-Ag vein and Cu-Au porphyry mines and exploration targets. High-grade gold-silver Gold-rich copper vein systems porphyry de
Slide 10: Shasta-Baker Target Areas & Infrastructure
Shasta-Baker Target Areas & Infrastructure TSX.V: TDG ~23km Existing Key Infrastructure Mets • Road Accessible with potential for year- round exploration. • Permitted 200 tpd mill site, 2 tailings storage facilities, camp, fuel storage, workshop. • Sturdee Airstrip ~15 km south from project. Baker M
Slide 11: Drill-Ready Past Producing Mines
3 Drill-Ready Past Producing Mines TSX.V: TDG 01 Shasta Mine 02 Baker Mine 03 Mets Mine Target resource Drill ready Drill ready Historical exploration including >28,000 m Historical exploration including >30,000 m Historical exploration including >7,900 m of of drilling demonstrates bulk tonnage Au-
Slide 12: Shasta Mine, BC – Brownfield Project
Shasta Mine, BC – Brownfield Project TSX.V: TDG Shasta mining lease has been extended with FN support to 2050. TDG has published an exploration target Shasta is located within the Shasta-Baker permitted mine area and covers range for Shasta of 0.90-1.47 Moz an exploration target area of 1500 metres
Slide 13: Shasta – Mineralized Zones & Grade Shells
Shasta – Mineralized Zones & Grade Shells TSX.V: TDG 200 m 1 km 13 www.tdggold.com
Slide 14: Shasta – 2021 Drill Program Overview
Shasta – 2021 Drill Program Overview TSX.V: TDG Phase 1: 3855 m, 29 holes – all located within the Permitted Mine Area (PMA). Three objectives: 1. Confirm historical drill assays. 2. Drill test known extensions around the historical mine workings. 3. Drill test for continuity of mineralization betwe
Slide 15: Baker Mine, BC – Brownfield Project
Baker Mine, BC – Brownfield Project TSX.V: TDG Baker mining lease has been extended with FN support to 2051. TDG has recompiled >30,000 metres of historical diamond drilling at Baker. Baker is also located within the Shasta-Baker permitted mine area and covers an exploration target area of 5.1 km by
Slide 16: Baker – Exploration Target Area
Baker – Exploration Target Area TSX.V: TDG The Baker Mine past production was underground extraction from the "A" and "B" Veins, plus associated small open pit. Historical drilling and surface work focused on the high-grade quartz veins within the Baker Project, and to a lesser extent, the wide area
Slide 17: Baker Mineralized Zones & Historic Drilling
Baker Mineralized Zones & Historic Drilling TSX.V: TDG Drilling on Baker Zones Holes Drilled Meterage A - Vein 156 11,595 B - Vein 85 8,460 North Quartz 28 2,930 Black Gossan 24 2,665 Ridge / D-Vein 14 1,436 Perry Mason 8 1,123 C-Vein 5 624 Knob 9 415 West Chappelle 4 159 Other 9 692 TOTAL 342 30,09
Slide 18: Baker – "A" Vein Example Historic Drill Results
Baker – "A" Vein Example Historic Drill Results TSX.V: TDG DD74-01 (A-Vein, within historic open pit workings) 9.14 m @ 13.07 gpt 53.34 – 58.06 metres 4.72 m @ 1.78 gpt Au & 13.89 gpt Ag. Au & 105.23 gpt Ag 69.49 – 74.68 metres 5.19 m @ 0.28 gpt Au & 7.13 gpt Ag. 7.62 m @ 31.95 gpt DD74-10 (A-Vein,
Slide 19: Baker – "B" Vein Example Historic Drill Results
Baker – "B" Vein Example Historic Drill Results TSX.V: TDG DD86-01 (B-Vein, within historic workings) 41.80 – 45.11 metres 3.31 m @ 0.91 gpt Au & 2.33 gpt Ag. 46.79 – 50.62 metres 3.83 m @ 0.66 gpt Au & 0.31 gpt Ag. 3.08 m @ 2.24 gpt 65.52 – 68.60 metres 3.08 m @ 2.24 gpt Au & 174.81 gpt Ag (incl. 6
Slide 20: Mets Mine, BC – Brownfield Project
Mets Mine, BC – Brownfield Project TSX.V: TDG The Mets mining lease covers 200 hectares and is road accessible from Baker ~23 km to the northwest. Systematic exploration between 1980-1992 included 8,784 m of drilling and 2,622 m of trenching. It identified 3 separate but genetically related zones co
Slide 21: Mets Mine, BC – Brownfield Project
Mets Mine, BC – Brownfield Project TSX.V: TDG MT87-50: 25.00 m @ 0.60 gpt Au and The A-Zone was developed at Mets between 1985 and 2.27 gpt Ag. Including 2.30 m @ 5.92 1988. From historical data, TDG has recognised the gpt Au and 3.23 gpt Ag. potential for a southern extension, and deeper target, di
Slide 22: Mets Mine, BC – Long Section
Mets Mine, BC – Long Section TSX.V: TDG Compilation of historical data has found a total of 64 drill holes at Mets, with 45 focusing on the A- Zone. The total meterage drilled in these holes was 7,944 m, with 29% of the core having assay results. The northern gossans remain largely untested with ear
Slide 23: Mets Mine, BC – Cross Sections
Mets Mine, BC – Cross Sections TSX.V: TDG N75 Section (other sections available at www.tdggold.com). A-Zone Mid-Section (other sections available at www.tdggold.com). 23 www.tdggold.com
Slide 24: Timeline: 2021
Timeline:2021 TSX.V: TDG May/Jun 2021: Mobilization Jun 2021: Core relogging Jul 2021: Survey work Expecting to mobilize to the Baker Completion of relogging of historical Completion of mapping and Camp and complete Stage 2 of core and potentially reassaying. sampling work. Baker site cleanup. Sep 2
Slide 25: Timeline: 2022
Timeline:2022 TSX.V: TDG Oct 2021: Camp closure Nov-Dec 2021: Results Jan-Feb 2022: Shasta review and release Resource Modelling Winterizing camp. Potential to continue exploration (subject to funding and permits/approvals). May 2022: Field program Mar-Apr 2022: Shasta Inaugural Resource Estimate 25
Slide 26: Summary
Summary TSX.V: TDG TDG has consolidated a DRILL READY strategic land position of SHASTA Well documented historical drill data has demonstrated the bulk tonnage potential at Shasta with an exploration target range of 0.90-1.47 Moz brownfield and greenfield AuEq contained in high grade gold-silver vei
Slide 27: Contacts
TSX.V: TDG Contacts Please follow us: in PHONE: ADDRESS: EMAIL: WEBSITE: Landline: +1 604 536 2177 1-15782 Marine Drive, info@tdggold.com www.tdggold.com White Rock, BC, V4B 1E6 www.tdggold.com
Slide 28: APPENDICES
APPENDICES TSX.V: TDG 28 www.tdggold.com
Slide 29: Meet The Team: Technical & Advisors
Meet The Team: Technical & Advisors TSX.V: TDG Andy Randell, P.Geo., Christy Smith, B.NS, MBA, Interim VP Exploration, Consultant (SGDS Hive) VP Indigenous Engagement, Falkirk Environmental Consultants Ltd. Andy has over 15 years experience working across BC, Yukon and South America on a Christy is
Slide 30: Royalties
Royalties TSX.V: TDG Oxide Peak • Certain of the Oxide Peak claims have a 2% NSR underlying royalty to Seven Devils Exploration Ltd. • Upon TDG owning 80% of Oxide Peak, Arcwest may convert its remaining interest into a capped 2% NSR of which 1% may be acquired for $2,000,000. • Oxide Peak has 1 km
Slide 31: Baker - Other Example Historic Drill Results
Baker- Other Example Historic Drill Results TSX.V: TDG DD04-32 (North Quartz – exploration target) 13.58 – 15.75 metres 2.17 m @ 1.79 gpt Au & 58.28 gpt Ag. 4.58 m @ 0.76 gpt 65.56 – 67.75 metres 2.19 m @ 0.66 gpt Au & 6.34 gpt Ag. Au & 4.98 gpt Ag 76.22 – 79.90 metres 3.68 m @ 0.46 gpt Au & 18.25 g
Slide 32: Asset Acquisition: Oxide Peak Earn-In
Asset Acquisition: Oxide Peak Earn-In TSX.V: TDG Earn-In Terms Agreed with ArcWest Exploration December 2019 YEAR 3 YEAR 1 $25,000 CASH $400,000 SPENDING JOINT VENTURE $1,500,000 SPENDING OR NSR* COMMITMENT 60% m drilling) (including 1,000 JV or ✓ ✓ 2 60% 80% 2% NSR YEAR 2 PEA DEC 2019 $15,000 CASH
Slide 33: Oxide Peak Project Target Areas
Oxide Peak Project TSX.V: TDG Target Areas Oxide Creek Gordonia • Oxide Creek: Transition from ridgetop epithermal alteration to porphyry Cu-Au alteration and (Cu-Au) (Au-Ag, Cu-Au) Alberts mineralization in the creek. Hump Porphyr y Pearl • Gordonia: Potential for shallow epithermal Au-Ag and burie