    ABN: 30 614 289 342 Registered and Business Office Suite 2, 45 Ord Street West Perth WA 6005 Australia Tel: +61 8 6244 5136 Email: ardea@ardearesources.com.au 6 August 2024 Company Announcements Australian Securities Exchange Level 40 Central Park 152 - 158 St Georges Terrace Perth WA 6000 By Electr

  2. Slide 2: Kalgoorlie Nickel Project - Goongarrie Hub

    Kalgoorlie Nickel Project - Goongarrie Hub A multi decade, large scale, low cost nickel-cobalt operation Andrew Penkethman Managing Director & CEO Diggers and Dealers Mining Forum 5 – 7 August 2024 ASX:ARL ASX:ARL

  3. Slide 3: Disclaimer

    Disclaimer Important notice This presentation contains general information only and is, or is based upon, information which has been released to ASX or is contained in the Ardea Resources Limited (Ardea or the Company) prospectus dated 9 November 2016 (including supplementary prospectuses dated 18 N

  4. Slide 4: Experienced Board, Supportive Shareholders & Tight Capital Structure

    Experienced Board, Supportive Shareholders & Tight Capital Structure Mat Longworth Non-Executive Chair ASX:ARL Experienced across exploration, project evaluation / Shares on Issue 199,682,915 Cash (30 Jun 2024) A$14.8M development including KNP and corporate management Performance Rights 3,316,400 B

  5. Slide 5: Kalgoorlie Nickel Project – Globally Significant Nickel-Cobalt Resource

    Kalgoorlie Nickel Project – Globally Significant Nickel-Cobalt Resource KNP KNP Goongarrie Hub hosts ~4Mt contained nickel 2 KNPL managing JV. SMM & MC earning 50%1 Rest of KNP – 100% ARL ~2Mt contained nickel 2 plus exploration pipeline incl Ni Sulphide discovery at Kalpini 1. See 29 April 2024 ARL

  6. Slide 6: KNP Goongarrie Hub

    Cross Section 669 9364mN Highway KNP Goongarrie Hub KNP Goongarrie Hill Cross Section 666 9600mN Goongarrie South Siberia North Big Four / Scotia Dam Page 5 1. See full tables in Appendix and 5 July 2023 ARL PFS ASX Announcement. 70km to Kalgoorlie-Boulder ASX:ARL

  7. Slide 7: All Nickel Supply Chains are NOT Equal

    All Nickel Supply Chains are NOT Equal Sanctions affect Nornickel Kalgoorlie 6 ✓ Nickel Project Goongarrie Hub ✓ Low Risk/Low Concern 4 jurisdiction1 ✓ Large resource, multi-decade operation, robust financial metrics, low Opex - strategic asset attractive to OEMs2 4 New ✓ Complies with IRA, FEOC, EU

  8. Slide 8: Significant Critical Minerals Collaboration

    Significant Critical Minerals Collaboration The Goongarrie Hub DFS is the first Critical Minerals collaboration between Australia and Japan, with the project expected to be a multi decade nickel-cobalt operation that provides supply chain diversity, security and meets the high ESG standards expected

  9. Slide 9: What the Partners are Bringing to the Joint Venture

    What the Partners are Bringing to the Joint Venture Ardea’s Globally Significant Asset SMM and MC will fully fund the KNP Goongarrie Hub DFS Goongarrie Hub – MRE 4Mt contained Ni & 250Kt contained Co. Ore Reserve of 1.36Mt Will provide technical and commercial input and of contained Ni & 99Kt contai

  10. Slide 10: KNP Goongarrie Hub – Multi Decade, Large Scale Operation

    KNP Goongarrie Hub – Multi Decade, Large Scale Operation The KNP Goongarrie Hub will contribute significantly to local, state and national economy and will be an important part of the Australian Nickel sector 40 year 3,000 Jobs Project to Long term supply mine life during Construction support local,

  11. Slide 11: KNP Goongarrie Hub – Large scale, long-life, low-cost Ni-Co operation

    KNP Goongarrie Hub – Large scale, long-life, low-cost Ni-Co operation • Goongarrie Hub Ore Reserve2 194.1Mt at 0.70% Ni and 0.05% Co for 1.36Mt of nickel and 99,000t of cobalt to sustain production of approximately 30,000t of nickel and 2,000t of cobalt per year for > 40 years A B • Strong financial

  12. Slide 12: Premium Goethite Nickel-Cobalt Ore - Low Cost Characteristics

    Premium Goethite Nickel-Cobalt Ore - Low Cost Characteristics Highway Deposit 17km Goongarrie Hill Typical premium high grade Goethite at Goongarrie South Goongarrie South Big Four / Scotia Dam To Siberia North To Kalgoorlie - Boulder • 25km continuous strike of soft, mainly free-digging premium Goe

  13. Slide 13: KNP Goongarrie Hub – Shallow, Thick, High-Grade Nickel

    KNP Goongarrie Hub – Shallow, Thick, High-Grade Nickel Goongarrie South - Pamela Jean Deeps Section 666 9600mN AGSD0001* 100.80m @ 1.00% Ni, 0.08% Co from 34m 24.84m @ 1.10% Ni, 0.08%Co from 140.2m 10.00m @ 96g/t Sc from 24m AGSR0418* 42m @ 0.67% Ni, 0.04% Co from 30m 56m @ 1.29% Ni, 0.14%Co from 10

  14. Slide 14: KNP Goongarrie Hub – Mineralised Neutraliser within Highway Ore

    KNP Goongarrie Hub – Mineralised Neutraliser within Highway Ore Highway Section 669 9364mN AHID0012* AHID0012* 20m @ 1.14% AGSR0418 Ni, 0.037% Co & 4g/t Sc from 4m inc 4m @ 2.31% Ni, 0.132% Co & 8g/t Sc from 4m – HPAL feed & inc 8m @ 1.30% Ni, 0.015% Co & 3g/t Sc from 16m – Brown Typical white magne

  15. Slide 15: ESG Credentials Strengthened During PFS

    ESG Credentials Strengthened During PFS In-pit tailings disposal1 minimises environmental footprint and enables mine site rehabilitation, concurrent with steady-state mine operation. KNP – Goongarrie Hub LCA Climate Change Contribution Analysis Life Cycle Assessment (LCA) is expected to be 11.9 kg C

  16. Slide 16: KNP Goongarrie Hub DFS has commenced

    KNP Goongarrie Hub DFS has commenced Andrew Penkethman and Matt Read with Sumitomo Metal • KNPL is a 100% subsidiary of Ardea with the Consortium Mining and Mitsubishi Corporation representatives - Niihama Nickel Refinery, Japan June 2024 progressively earning a 50% interest. KNPL holds the Goongarr

  17. Slide 17: Current Nickel output cuts to pressure near term surpluses lower

    Current Nickel output cuts to pressure near term surpluses lower • 2023 large nickel surplus led to a drop in the LME nickel price • Higher cost producers have responded Expected by cutting / ceasing production which in Goongarrie Hub production turn has put pressure on supply • Security and continu

  18. Slide 18: Ardea Exploration Pipeline Upside

    Ardea Exploration Pipeline Upside Ardea controls ~3,500km2 of tenure in the Eastern Goldfields of WA with unrivalled Critical Mineral exploration potential • Kalpini Project - Massive nickel-copper-PGE sulphides discovered at Emu Lake (AELD0003: 2.72m at 5.42% Ni & 0.85% Cu from 391.04m) within larg

  19. Slide 19: Key Investment Considerations – For the stand-out Nickel-Cobalt Stock

    Key Investment Considerations – For the stand-out Nickel-Cobalt Stock Ardea, Sumitomo Metal Mining (SMM) and KNP is a strategic asset which includes the Mitsubishi Corporation (MC) to form a JV to Goongarrie Hub, (part of JV with SMM & MC), and develop the KNP Goongarrie Hub2. The DFS, remaining KNP

  20. Slide 20: Andrew Penkethman

    Keep up to date with news, videos and more at our website: www.ardearesources.com.au or follow our socials For further information Andrew Penkethman Managing Director & CEO +61 8 6244 5136 Our team welcome your questions ardea@ardearesources.com.au ASX:ARL Youtube - Free social media icons A black b

  21. Slide 21: A multi decade, large scale, low cost nickel-cobalt operation: Appendices

    Kalgoorlie Nickel Project - Goongarrie Hub A multi decade, large scale, low cost nickel-cobalt operation ASX:ARL Appendices: Full tables and supporting references ASX:ARL

  22. Slide 22: Competent Persons

    Competent Persons Information in this presentation has been summarised from ARL ASX MRE Announcement 30 June 2023, ARL ASX PFS Announcement 5 July 2023 Ore Reserves and ARL ASX MOU Announcements 5 July 2023, 29 September 2023, 21 December 2023 and 31 January 2024. Information in this presentation th

  23. Slide 23: KNP Global MRE

    KNP Global MRE KNP Global nickel and cobalt Mineral Resources based on a 0.5% Ni cut-off grade The Competent Persons (CP) for the Mineral Resources, are Contained Contained Mr Ian Buchhorn and Mr Andrew Penkethman, both are full-time KNP Hub Resource Category Size (Tonnes) Ni (%) Co (%) Ni (kt) Co (

  24. Slide 24: KNP Goongarrie Hub MRE

    KNP Goongarrie Hub MRE KNP Goongarrie Hub nickel and cobalt Mineral Resources based on a 0.5% Ni cut-off grade Resource Size Ni Co Contained Metal Estimation Details Prospect Category (Mt) (%) (%) Ni (kt) Co (kt) Method Source Year Measured 18 0.94 0.085 171 15 LUC Ardea 2021 Goongarrie The Competen

  25. Slide 25: KNP Goongarrie Hub Ore Reserve Summary

    KNP Goongarrie Hub Ore Reserve Summary Ore >= 0.5% Ni Ore > 0.5% NiEq and LOI > 25% Total Ore Ni Co Ni Co Ni Co Ni Co Ni Co Ni Co KNP Goongarrie Hub Ore Reserve Summary consisting of Deposit Mt % % kt kt Mt % % kt kt Mt % % kt kt ore above 0.5% Ni as the feed stock for the processing Proven facility

  26. Slide 26: PFS Key Financial Metrics

    PFS Key Financial Metrics Financials PFS defines > 40-year Nickel Revenue A$ M 44,429 operation with strong Cobalt Revenue A$ M 7,880 Revenue - combined A$ M 52,309 financial metrics1: EBITDA LOM A$ M 34,217 EBITDA Annual (average) A$ M 800 • Pre-tax NPV7 of A$7,625M (IRR 30%) EBITDA margin % 65% •

  27. Slide 27: PFS 2023 – Capital Cost Estimate

    PFS 2023 – Capital Cost Estimate KNP – Goongarrie Hub Preproduction Cost Category Costs (A$) • Contingency considered appropriate to the level of the capital cost estimate has been included Mining – overheads, mobilisation, 98M • Base date March 2023 pre-strip and other • Refer to 5 July 2023 ARL PF

  28. Slide 28: DFS Key Budget Items

    DFS Key Budget Items The Consortium (SMM and MC) will DFS Cost Centre Costs (A$) Drilling 13.4M fund 100% of the KNP Goongarrie Hub DFS costs, up to the agreed Metallurgical Test Work 2.3M Mine Design 15.0M budget of A$98.5 million (incl dewatering & geotechnical) Process Plant Design 28.3M Building

  29. Slide 29: KNP – Goongarrie Hub Superior HPAL Intensity

    KNP – Goongarrie Hub Superior HPAL Intensity ✓ Good ore grade + good slurry density = Lower Capex & Opex $$ ✓ Atmospheric leach = stable operation, utilizes saprolite resource ✓ MHP & MSP Product = known technology & good market acceptance Operating data from Australian HPAL Producers Performance Dr

  30. Slide 30: EV Sales Grow – High Nickel Batteries hold increasing share of market

    EV Sales Grow – High Nickel Batteries hold increasing share of market • Nickel batteries, which have nearly twice the energy • Nickel batteries hold a large share of the EV density of other materials, are leading EV applications landscape. High Ni cathodes favoured, with in Domestic, Commercial and

  31. Slide 31: Leveraging Material Types

    Leveraging KNP Goongarrie Hub Material Types The KNP Goongarrie Hub nickel-cobalt laterite deposits have developed from intense tropical weathering of the Walter Williams Formation Premium Goethite grind (WWF), an olivine cumulate ultramafic volcanic rock, and preferential and beneficiation ore as w

  32. Slide 32: Ardea Receives Improved ESG Certification Score 2024

    Ardea Receives Improved ESG Certification Score 2024 2024 ESG Scores for Ardea Ardea’s work practices are aimed at meeting or exceeding the high ESG standards expected by modern society with continuous improvement shown in the two Digbee ESGTM surveys completed Page 31 ASX:ARL

  33. Slide 33: Realising Value from the Kalgoorlie Nickel Project

    Realising Value from the Kalgoorlie Nickel Project For MRE see 30 June 2023 ARL MRE announcement. See Appendices in this presentation. Page 32 * See 29 April 2024 ARL, SMM and MC to form a JV to develop KNP Goongarrie Hub ASX Announcement. ASX:ARL