Ardea Resources Ltd. · ASX:ARL

Ardea Resources — Noosa Mining Investor Conference 2026

23 slides from Ardea Resources's conference presentation, Jul 22, 2026

  1. Slide 1: Noosa Mining Investor Conference

    (ASX: ARL) 22 - 24 July 2026 A Strategic, Independent Nickel-Cobalt Noosa Mining Investor Conference Supply Chain for Global Markets

  2. Slide 2: Disclaimer

    Disclaimer Important notice This presentation contains general information only and is, or is based upon, information which has been released to ASX: Kalgoorlie Nickel Project Mineral Resource Estimate Exceeds 6 Million Tonne Contained Nickel (30 June 2023), KNP Goongarrie Hub Ore Reserve and Feasib

  3. Slide 3: Australia's Largest Nickel-Cobalt Resource

    Australia's Largest Nickel-Cobalt Resource  KNP Mineral Resource Estimate 854Mt at 0.71% Ni & 0.045% Co for 6.1Mt contained Ni and 386kt contained Co1  Goongarrie Hub: 584Mt at 0.69% Ni & 0.043% Co for 4Mt contained Ni & 250kt contained Co1  KNP Kalpini Hub (100% ARL): 270Mt at 0.76% Ni & 0.05% C

  4. Slide 4: Critical Minerals Project of International Significance

    Critical Minerals Project of International Significance Positioned to support secure and diversified critical minerals supply chains  Strategic ex-Indonesia nickel-cobalt Australia's Largest Ni- One of the Largest in supply for allied markets Co Resource3 the Developed World  Backed by Japanese pa

  5. Slide 5: Multi-Jurisdiction Government Support

    Multi-Jurisdiction Government Support Western Australia Australia Japan United States  Lead Agency Status1  Major Project Status2  METI & JOGMEC  US EXIM Support4  Strong Local Government  Investor Front Door3 Support56  Japan-US Critical support:  EFA Support4  Australia-Japan Critical Min

  6. Slide 6: Highly Experienced International Partners

    Highly Experienced International Partners Japanese partners validate Goongarrie Hub and fully fund the DFS with $98.5 million budget  400+ years mining history  Global industrial and financing capability  Proven laterite / HPAL operator  Long history operating in Australia  Downstream nickel pr

  7. Slide 7: 2026 Strategic & Development Milestones

    2026 Strategic & Development Milestones 2026 milestones have materially strengthened Goongarrie Hub’s pathway to development through increased strategic recognition, government facilitation and funding support. 1 2 3 4 5 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026  Strategic recognition EFA / EXIM

  8. Slide 8: Pathway to Development – Funding Support up to A$1B

    Pathway to Development – Funding Support up to A$1B Ardea has secured co-ordinated, conditional non-binding support from Export Finance Australia (EFA) and the Export-Import Bank of the United States (EXIM) for the Goongarrie Hub project1 3. EXIM Support 4. Co-ordinated 1. Strategic Critical 2. EFA

  9. Slide 9: +40 year project, significant growth potential

    +40 year project, significant growth potential Nationally strategic KNP Goongarrie Hub to strengthen battery minerals supply chain for decades 2023 PFS1  Average 30ktpa Ni and 2ktpa Co2  +40 years forecast operation Growth opportunities  Only 6 of 9 deposits, hosting ~76% of the Goongarrie Hub Ni

  10. Slide 10: DFS Progressing with pre-FEED enhancements

    DFS Progressing with pre-FEED enhancements  $98.5M DFS remains fully funded by SMM / Mitsubishi1 Resource modelling, mine planning and Ore Reserve updates  Major workstreams advanced1 Process design and MSP flowsheet optimisation  Updated timetable reflects completion of optimisation, engineering

  11. Slide 11: Fundamentals Support Long-Term Competitiveness

    Fundamentals Support Long-Term Competitiveness Scale and mine life1 Potential fiscal support Cost and process advantages Large, long-life resource base with Australia’s Critical Minerals Laterite ore characteristics and potential to operate through Production Tax Incentive could scale support compet

  12. Slide 12: Multi-commodity exploration potential

    Multi-commodity exploration potential Ardea controls ~3,200km2 of tenure in the Eastern Goldfields of WA with unrivalled exploration potential1  Kalpini Project: Emu Lake Ni Sulphide2  Additional precious and critical minerals upside: Gold, scandium and rare earth element (REE) potential identifie

  13. Slide 13: Indonesia Driving Change in Global Nickel Markets

    Indonesia Driving Change in Global Nickel Markets1 Supply discipline and market rebalancing support a stronger long-term outlook for nickel and strategic Western supply projects. Structural Supply Discipline Lower ore quotas and tighter oversight signal a long-term shift toward active supply managem

  14. Slide 14: Investment Case – Why Ardea?

    Investment Case – Why Ardea? Strategic project with Recognised across Australian, Australia’s largest nickel- Japanese partners and 75% WA, Japanese and US critical cobalt resource offtake secured minerals frameworks 100%-owned exploration & Potential funding support DFS progressing with update deve

  15. Slide 15: Contact

    Contact: Andrew Penkethman Managing Director & CEO ardea@ardearesources.com.au ARL:ASX Suite 2, 45 Ord Street West Perth WA 6005 David Tasker . Chapter One Advisors Ph: +61 8 6244 5136 dtasker@chapteroneadvisors.com.au www.ardearesources.com.au 15

  16. Slide 16: Appendices

    Appendices PSY Ardea Resources Limited 16

  17. Slide 17: Ardea Resources Board and Management

    Ardea Resources Board and Management A highly skilled Board and Senior Management team with experience across the resources sector Mathew Andrew Maree Michael Longworth Penkethman Arnason Rodriguez Non-Executive Managing Director & Non-Executive Executive Director Chairman Chief Executive Officer Di

  18. Slide 18: Ardea Resources – Corporate Snapshot

    Ardea Resources – Corporate Snapshot Experienced Leadership. Respected Partners. Supportive Shareholders & Stakeholders. Tight Capital Structure. 219,714,106 Top 40 Shareholders Cash Shares on Issue ~62% equity $19.7M2 4,500,000 Performance Rights Board & Management No Debt 3,000,000 Options ~7% equ

  19. Slide 19: Appendix 1 - Competent Persons

    Appendix 1 - Competent Persons Information in this presentation has been summarised from ARL ASX MRE Ardea wishes to clarify that its current Kalgoorlie Nickel Project (KNP) Mineral Resource Estimate (MRE) Announcement 30 June 2023, ARL ASX PFS Announcement 5 July 2023 and ARL following JORC Code (2

  20. Slide 20: Appendix - Competent Persons cont.

    Appendix 1 - Competent Persons cont. Ore Reserves KNP Goongarrie Hub Ore Reserve Summary Information in this presentation that relates to Ore Reserves at the Kalgoorlie Nickel Project Goongarrie Hub is based on and fairly represents information Contained Contained and supporting documentation compil

  21. Slide 21: KNP Global MRE

    KNP Global MRE The Competent Persons (CP) for the Mineral Resources, are KNP Global nickel and cobalt Mineral Resources based on a 0.5% Ni cut-off grade Mr Ian Buchhorn and Mr Andrew Penkethman, both are full-time employees of Ardea and consider the resource classification Contained Contained applie

  22. Slide 22: Goongarrie Hub MRE

    Goongarrie Hub MRE KNP Goongarrie Hub nickel and cobalt Mineral Resources1 based on a 0.5% Ni cut-off grade The Competent Persons (CP) for the Mineral Resources, are Resource Size Ni Co Contained Metal Estimation Details Mr Ian Buchhorn and Mr Andrew Penkethman, both are full- Prospect time employee

  23. Slide 23: KNP Goongarrie Hub Ore Reserve Summary

    KNP Goongarrie Hub Ore Reserve Summary Ore >= 0.5% Ni Ore > 0.25% Ni and LOI > 25% Total Ore KNP Goongarrie Hub Ore Reserve Summary Ni Co Ni Co Ni Co Ni Co Ni Co Ni Co consisting of ore above 0.5% Ni as the feed stock Deposit Mt % % kt kt Mt % % kt kt Mt % % kt kt for the processing facility, and or

Ardea Resources — Noosa Mining Investor Conference 2026 on 6ix