Slide 1: Rathdowney Resources Ltd. - An Exciting Zinc Development Opportunity
Rathdowney Resources Ltd. An Exciting Zinc Development Opportunity Corporate Presentation February 2016 TSXV: RTH
Slide 2: Cautionary & Forward Looking Information
Cautionary & Forward Looking Information This presentation includes certain statements that may be deemed "forward-looking statements". All information contained in this presentation relating to the contents of the Preliminary Economic Assessment (PEA) of the Olza zinc-lead project (Project Olza) in
Slide 3: Rathdowney Strengths: Investment Highlights
Rathdowney Strengths An Exciting Zinc Development Opportunity Investment Highlights: Rathdowney owns 100% of Project Olza in the Silesian MVT District, Poland Exciting Zinc-Lead project with considerable resource expansion potential Poland – stable jurisdiction – well-codified mining tradition
Slide 4: Poland – A Great Place to Be
Rathdowney Strengths Poland – A Great Place to Be 8th largest economy in the European Union (EU) Industrial base – coal, textile, chemical, machinery, iron and steel sectors Well established mining industry with a long history of operating mines Mining the Silesian District since the 12th Ce
Slide 5: Poland – A Great Place to Be (Continued)
Rathdowney Strengths Poland – A Great Place to Be (Continued) Zn-Pb mining in Poland since the 12th century Clear, concise and legislated process to obtain a mining extraction license Highly skilled mining workforce in Poland Keen interest for clean concentrate from off- take groups and smel
Slide 6: Geologic Setting – An Ability to Deliver
Rathdowney Strengths Geologic Setting – An Ability to Deliver 100% ownership of three exploration concessions in the world’s most prolific Zinc-Lead district Upper Silesia Mining District, area of world-class Mississippi Valley Type Zinc- Lead deposits1 Under-explored for 30 years prior to Rat
Slide 7: An Ability to Deliver
Rathdowney Strengths An Ability to Deliver 100% ownership of three exploration concessions in the world’s most prolific Zinc-Lead district Resource – 24.4 MT at 5.53% Zn, 1.49% Pb – 7.02% Combined1 Project Olza has excellent potential for resource expansion World class Pomorzany Mine (20 km
Slide 8: Olza Opportunity
Rathdowney Strengths Olza Opportunity Long Life Mines with Excellent Operating Characteristics (e.g. Pomorzany Mine, located 20 km south of Project Olza has operated for 40 years and produced 90+MT Well-Developed Mining Infrastructure Extensive Project Database: 180,000 m historical drilling i
Slide 9: Project Olza – Expandable Resource Base
Rathdowney Strengths Project Olza – Expandable Resource Base Rathdowney drilling confirms exceptional upside in Project Olza resource potential Legend Rathdowney 2014 Inferred Resource 24.4 Mt @ 7.02% Zn+Pb (2.0% Zn COG)1 Polish State Geological Institute (PSGI)2 2008 Historical Estimate Outline 2
Slide 10: 43-101 Mineral Resource
Rathdowney Strengths 43-101 Mineral Resource Inferred mineral resource at 2% Zn cut-off 24.4 MT at 5.53% Zn, 1.49% Pb – 7.02% Combined Important Ag content yet to be quantified Rathdowney Project Olza Inferred Mineral Resources1 Cutoff Tonnes Zn Pb Zn+Pb Contained Zn Contained Pb Zn% (millions
Slide 11: Excellent Infrastructure Optionality
Rathdowney Strengths Excellent Infrastructure Optionality Quality infrastructure – power, water, roads, rail lines and ports to target markets Dramatic positive effect on CAPEX and OPEX February 2016 February 2016 | TSXV: RTH Page 11
Slide 12: European Zinc Smelters at Project Olza's Doorstep
Rathdowney Strengths European Zinc Smelters at Project Olza’s Doorstep Significant interest from smelters for Olza concentrate Clean concentrate characterized by very low iron Project timeline coincides with under supplied smelters February 2016 Page 12
Slide 13: Preliminary Economic Assessment
Rathdowney Strengths Preliminary Economic Assessment Key Results1 (US dollars and metric units) Robust returns and low production costs $227M initial capital cost $51M sustaining capital $47.42/t on-site operating cost Conventional 6,000 tpd bulk room & pillar mine with decline access St
Slide 14: PEA – Annual Production Summary
Rathdowney Strengths PEA – Annual Production Summary Based on a 24.4 million tonne resource ANNUAL (Avg)1 Total Mineralized Material Mined 2,013,000 t Total Mineralized Material Processed 2,013,000 t Zinc Grade, Processed 4.98 % Lead Grade, Processed 1.50 % Average Recovery, Zinc 89.0 % Average Reco
Slide 15: PEA – Projected Operating Costs
Rathdowney Strengths PEA – Projected Operating Costs Operating Cost1 ($/t) Mining 26.88 Milling 11.46 Environmental/Tailings Storage Total cost to produce metal1 5.15 Facility Site General & Administration 3.93 $0.63/lb Zn TOTAL ON-SITE COSTS 47.42 or Refining & Smelting Cost1 TC / RC ($/t) 22.01 $6
Slide 16: PEA – Projected Capital Costs
Rathdowney Strengths PEA – Projected Capital Costs Post-tax payback 2.4 years (8% discount rate) Initial Sustaining Total LOM Capital Cost ($M) ($M) ($M) Mining 82.3 36.6 118.9 Processing 59.7 - 59.7 Tailings Management & Water 33.1 14.5 47.6 Treatment Facilities Surface Facilities 15.7 - 15.7 Con
Slide 17: De-risking Project Advancement
Rathdowney Strengths De-risking Project Advancement Advancing Engineering and Environmental Studies to Support Mine Development Engineering data collection progressing Preliminary Economic Assessment returns positive results Engineering drilling and additional deposit drilling ongoing – initia
Slide 18: Proactive Stakeholder Engagement
Rathdowney Strengths Proactive Stakeholder Engagement Active engagement with all governments Community outreach: Door to door visits Local events Open houses Community meetings Site visits Early meetings with local officials Project Olza enjoys positive relations with local communi
Slide 19: Milestones – Completed & Projected
Rathdowney Strengths Milestones – Completed & Projected ACQUISITION & PLANNING 2010 to 2015 RESOURCE EVALUATION ENGINEERING & ENVIRONMENTAL DATA GEOLOGICAL DOCUMENTATION & PEA Completed MINE PLANNING & PERMITTING Complete Project Description 2015 Integrate modern mine plan with Land Use Plan t
Slide 20: Successfully Managing the Opportunity
Rathdowney Strengths Successfully Managing the Opportunity Political Social Environmental Project Cost Infrastructure Market Good rapport Over 2,000 Well Experienced Low CAPEX High quality Mine closures & working town hall documented development US$234M infrastructure tightening zinc r
Slide 21: Strategically Positioned in a Tightening Zinc Market
Rathdowney Strengths Strategically Positioned in a Tightening Zinc Market Projected Zinc market deficit Substantial mine closures and production cuts Century (500,000 t) Lisheen (175,000 tpy) Glencore (500,000 t) Upward trend in Zinc pricing1 2018 – US$1.04/lb, 2019 – US$1.00/lb, 2020
Slide 22: Executive & Professional Team
Rathdowney Strengths Executive & Professional Team MANAGEMENT David J. Copeland Chairman Robert Konski President & CEO Dave Copeland is a professional engineer and mining executive with over Robert Konski has over 25 years’ experience as an executive and strategic advisor 30 years' experience in adv
Slide 23: Investment Conclusions
Rathdowney Strengths Investment Conclusions Key Points: Substantial economic resource Proven mining jurisdiction Structured permitting process with legislated timelines Project opportunity delivered by experienced team Importantly positioned in a tightening Zinc market Significant projec
Slide 24: Contact Information
Contact Information Rathdowney Resources Ltd. 15th Floor 1040 W. Georgia St. Vancouver, BC Canada V6E 4H1 Investor Relations TF: 800.667.2114 Ph: 1.604.684.6365 Email: info@hdimining.com February 2016 Page 24
Slide 25: Appendices
Appendices February 2016 Page 25
Slide 26: Share Capital
Share Capital Listed March 2011 on TSX:V ticker RTH C$34 million initial public offering 118.08 million common shares outstanding 4.58 million options outstanding 1.97 million warrants February 2016 Page 26
Slide 27: Preliminary Economic Assessment (PEA) Qualified Persons
Preliminary Economic Assessment (PEA) Qualified Persons Qualified Person Company Professional Designation Sections of the Report Project Management and Christopher Bray BEng, MAusIMM(CP) Mining BSc (Hons), MSc, PhD, MAusIMM Dr Lucy Roberts Mineral Resource (CP) Dr Christopher Bonson PhD EurGeol, P.G
Slide 28: PEA Conceptual UG Mine Layout & Stope Access
PEA Conceptual UG Mine Layout & Stope Access February 2016 Page 28
Slide 29: PEA Metallurgy & Process Design
PEA Metallurgy & Process Design Standard flotation results in marketable zinc and lead concentrates, recoveries of 89% LOM zinc recovery producing 56% zinc concentrate 88.5% LOM lead recovery producing 70% lead concentrate February 2016 Page 29
Slide 30: Expandable Resource Base
Expandable Resource Base February 2016 Page 30
Slide 31: Drilling 2015 – Highlights
Rathdowney Drilling 2015 – Highlights Results from new drilling is adding key engineering data and confirming potential to increase resources Highlights include: Hole OLZ-241: 3.3 m of 16.0% Zn+Pb incl 1.3 m of 36.9% Zn+Pb Hole OLZ-232: 8.5 m of 4.77% Zn+Pb, 12.8 g/t Ag incl 2.1 m of 17.9% Zn+
Slide 32: Drilling 2015 – Highlights
Rathdowney Drilling 2015 – Highlights Drill Hole From (m) To (m) Length (m) Zn+Pb* (%) Zn (%) Pb (%) Ag (g/t) Number 99.00 99.50 0.50 1.32 0.61 0.71 3.4 OLZ-226 102.70 106.30 3.60 1.76 0.95 0.81 2.4 incl 102.70 104.00 1.30 2.71 1.12 1.59 4.0 97.90 103.90 6.00 2.77 2.56 0.21 9.0 OLZ-228 incl 97.90 10
Slide 33: Historical Estimates for Zawiercie Property
Historical Estimates for Zawiercie Property Zawiercie Historical Estimates by PGI Year of Number of Metres Period of Deposit Category Mt % Zn % Pb Estimate Holes Drilled Drilling 2008 C-1 + C-2 17.0 5.80 2.32 1994 C-1 16.3 6.00 2.50 Most Zawiercie I 1990 510 Unknown C-1 34.5 4.92 1.98 pre-1975 1977
Slide 34: Environmental Data Collection
Environmental Data Collection Designed to advance mine planning and permitting Extensive hydrology & hydrogeology studies (600 km2 area) Comprehensive flora and fauna data collection (250 km2 area) Land use assessments complete Engineering, drilling and mine planning studies to support Feasi
Slide 35: Pathway to an Exploitation License
Rathdowney Strengths Pathway to an Exploitation License STEP 1 • Prepare / submission / approval of geological documentation Completed STEP 2 • Changing spatial plan and local land use plan Grant • Preparation / submission / of Mining STEP 3 approval of EIA Exploitation Ongoing License1 STEP 4 • P
Slide 36: Project Timeline
Rathdowney Strengths Project Timeline 2013 2014 2015 2016 2017 PROJECTED TIMELINE 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 Geological Documentation Local Planning Changes Environmental Impact Assessment (EIA) Deposit Devel
Slide 37: February 2016 Notes
February 2016 Notes RATHDOWNEY,
Slide 38: FRATHDOWNEY,
FRATHDOWNEY,