Slide 1: Operate from Anywhere: Three keys to making the most of remote drilling
Welcome ‘Operate from Anywhere ' Three keys. to making the most of remote drilling shady AINofai Remote Ope & Well Planning SF Se Bryan Shires t'de Vreugd North America Drilling Services” MENAT Remote Operations Daina S Services Baker Hughes Baker Hughes SE Baker Hughes 5 Copyright 2020 Baker Hughes

Slide 2: The value of effective remote operations
The value of effective remote operations S$ Y ml @& ra Reduced Improved Maximized Greater HSE risks performance efficiency consistency quality By relocating personnel In challenging applications Each day, on dozens of wells Baker Hughes offers an from the rig site to the around the world, Baker Hugh

Slide 3: The value of remote operations: Northeast United States
THE VALUE OF REMOTE QRERATIONS: Northeast United States Drilled a long, complex curve and lateral in a single run... remotely DRILLED SURPASSED STAYED RECORDED 20,463 FT| ONE MILE 99 3, ZERO IN A SINGLE (6,194FT) INA 162.9 HOUR RUN | 24-HOUR PERIOD IN ZONE HSE INCIDENTS

Slide 4: The value of remote operations: Kingdom of Saudi Arabia
THE VALUE OF REMOTE OPERATIONS: KINGDOM OF SAUDI ARABIA Drove consistent ROP improvements in unconventional field DRILLED 3 CONSECUTIVE RECORD SECTIONS IMPROVED FIELD ROP 30% DRILLED 2,831 FT IN 24 HRS DRILLED 7,522 FT IN 98 HRS TRANSFORMED WELL EXECUTION WITH REMOTE DD ANDMWD 90 80 70 60 50 40 30 F

Slide 5: The value of remote operations: United Arab Emirates
THE VALUE OF REMOTE OPERATIONS: UNITED ARAB EMIRATES Delivered consistent ROP improvements IMPROVED ROP 46+% 2019-2020 YTD DRILLED 30 RECORD SECTIONS 2019-2020 YTD TRANSFORMED WELL EXECUTION AND SERVICE DELIVERY 90 80 70 60 50 i) 30 fe}} Q2 Q3 Q4 Ql Q2 2019 | 2020 MCustomer AFEROP target ‘ll Average

Slide 6: The three keys to successful remote operations
The three keys to successful remote operations >) . nile) al The right An experienced A commitment technology partner to service quality + Reliable, secure + Proven track record + Thorough pre-well planning digital infrastructure * Detailed workflows and protocols + Accelerated learnings * Modern do

Slide 7: The right technology: the digital infrastructure
THE RIGHT TECHNOLOGY The digital infrastructure An effective, digitally connected operational environment + Eliminates geographic and resource constraints * Maximizes collaborative capabilities + Reduces HSE risks for everyone sdauire andetlable Data Hosting In-cloud, in-field Real-time, bi-directio

Slide 8: and technology
and technology ~ . —S 8 Copyright 2020 Baker Hug

Slide 9: An experienced partner: 20+ years of remote operations experience
AN EXPERIENCED PARTNER . . 20+ years of remote operations experience 1998: Planning begins in Norway 2009: Opening of a local BEACON 2002: Opening of center in Kingdom BEACON” center of Saudi Arabia 92015: Ist “Mile-A-Day” (MAD) well running remote MWD in NA Land 2018: 1st remote service in Kingdom

Slide 10: An experienced partner: remote operations experience
AN EXPERIENCED PARTNER Remote operations experience EXECUTING REMOTE SERVICES 30+ COUNTRIES 360+ ENGINEERS & GEOLOGISTS SUPPORTING DRILLING/LOGGING OPERATIONS REMOTELY Ask questions via Live Event Q&A Copyright 2020 Baker Hughes Company. All rights reser 100% CONNECTIVITY WITH EVERY DRILLING OPERATI

Slide 11: Remote operations experience: detailed workflows and protocols
REMOTE OPERATIONS EXPERIENCE Detailed workflows and protocols Risk assessment RACI Field escalation process Baker Hughes $3. +i Baker Hughes S3 ROS dashboard Baker Hughes S3 Ask questions via Live Event Q&A Tl Copyright 2020 Baker Hughes Company. all rights reserved. 82009 Baker Hughes S3

Slide 12: A commitment to service quality: thorough pre-well planning
A COMMITMENT TO SERVICE QUALITY . Thorough pre-well planning Ask questions via Live Event Q&A 12 Copyright 2020 Baker Hughes Company. alll rights reserved. 82009 Baker Hughes S3

Slide 13: A commitment to service quality: continuous improvement
A COMMITMENT TO SERVICE QUALITY Continuous improvement Benchmarking Performance optimization + Identify * Measure and compare performance + Create “technical best offsets and technical limit” well profile + Identify improvement areas + Monitor and identify areas of ILT and NPT + Implement SOPs aT ST

Slide 14: Today's operating environment
Today's operating environment > _amment Ain ~' Health, safety, 7 & environment PE fe EE —— Ask questions via Live Event Q&A 14 Copyright 2020 Baker Hughes Company. All rights reserved 82009 _ pressures® . es fil » Financial = Performance optimization Uhire at #e Baker Hughes 5

Slide 15: From remote operations and re-manning
From remote operations and re-manning Travel-related Job-related risks risks Ask questions via Live Event Q&A 15 Copyright 2020 Baker Hughes Company. All rights reserved. 82009 Ba ker Hughes

Slide 16: Reduced HSE risks: remote drilling services re-manning overview
REDUCED HSE RISKS . . . . Remote drilling services: Re-manning overview Smaller environmental footprint seegan ra * Reduced HSE risk 2 ae 7 * Lower travel and o aN accommodation costs we .. ¥ . : Tool be —— Accelerated time to competency specialist flail -E— * Rapid identification and adoption of be

Slide 17: Reduced HSE risks: potential benefits from remote operations and re-manning
REDUCED HSE RISKS . . Potential benefits from remote operations and re-manning Land rig: re-manning Offshore rig: re-manning Example: Remote Operations 2 field service engineers 2 field service engineers support drilling service (directional drilling-LWD-SLS) > > Sources: https://v gov/energy/greenh

Slide 18: Improved performance quality
—_ r= q Improved performance que Ask questions via Live Event Q&A 18 — Copyright 2020 Baker Hughes Company. All rights reserved. 82009 Ba ker Hug hes =

Slide 19: Improved performance quality: Kingdom of Saudi Arabia
IMPROVED PERFORMANCE QUALITY: KINGDOM OF SAUDI ARABIA Enabled high-end LWD technology deployment with DD and MWD remote support EXECUTED SINGLE, 14-DAY DRILLING RUN DELIVERED 100% OPS EFFICIENCY Ask sfussuens s via Live mca Q&A 19 Copyright 2020 Baker Hughes Company. Al rights reserved. 82009 DRILLE

Slide 20: Improved performance quality: Algeria
IMPROVED PERFORMANCE QUALITY: ALGERIA Drilled a record-setting build-up section on first remote operations deployment IMPROVED ACHIEVED § ELIMINATED S AVED ROP 25% | >3200FT | 1TRIPWITH |Epicnays INTHESAMEFIELD IN ONERUN | Z/)?© NPT | INoNESECTION 20 Copyright 2020Baker Hughes Company. All rights re

Slide 21: Improved performance quality: Asia-Pacific
IMPROVED PERFORMANCE QUALITY: ASIA-PACIFIC Precisely placed a well within a narrow target window NAVIGATEDPAY | STAYED EXCEEDED ACHIEVED sicmoy |OO% pyiomjun comme MILES FROM RIGLOCATION | IN ZONE ‘ TB x3 TAG, eta Aes Pd aker Hughes

Slide 22: Improved performance quality: Eastern Siberia
IMPROVED PERFORMANCE QUALITY: EASTERN SIBERIA Drove project performance with remote oversight and QC DRILLED 15-BRANCH 12,394 M MULTILATERAL REDUCED AVERAGE KICKOFF TIMES BY 20 HOURS Ask questions via Live Event Q&A 22 Copyright 2020 Baker Hughes Company. All ights reserved. 82009 ROP (including con

Slide 23: Maximized efficiency
Maximized efficiency Ask questions via Live Event Q&A 23 = Copyright 2020 Baker Hughes Calgpary. Allrights reserved. Baker Hughes = oy

Slide 24: Maximized efficiency: Norway
MAXIMIZED EFFICIENCY: NORWAY Accelerated well construction on a multi-well project safely, efficiently and remotely CONSTRUCTED RECORDED TIME DEPTH CURVE 21 WELLS IN Z E RO is ? 100 200 300 400 500 20 MONTHS 5000 HSE INCIDENTS” a ai AVERAGED — 9 | DELIVERED | } = onti| BMONTHS |. sexe ok Ey ct 1 DM

Slide 25: Maximized efficiency: Egypt
MAXIMIZED EFFICIENCY: EGYPT Enabled LWD technology deployment with remote expertise and support in highly restricted area SAVED DELIVERED REDUCED &LIMINATED 100% OPS WAITING TIME FOR OPERATOR | FrrICIENCY | Sinus | isueuunort IN RESTRICTED AREA PANDEMIC AND | EXPERT SUPPORT SECURITY SITUATION Ask qu

Slide 26: Maximized efficiency: Rocky Mountains, United States
MAXIMIZED EFFICIENCY: ROCKY MOUNTAINS, UNITED STATES Drilled a record-setting well with minimal personnel at site SURPASSED ACHIEVED | RECORDED REDUCED 1.95 MILES | 10,308 FT TD Z E CLIENT DRILLING IN A SINGLE | IN ONE DAY COSTS 30% 24-HOUR PERIOD N Sie fe ae i | 3-2 sakes oer — = - = <= = =—sS Bake

Slide 27: Greater consistency
Greater consistency Effective technical support Ask questions via Live Event Q&A 27 Copyright 2020 Baker Hughes Company. All rights reserved. Accelerated learnings and adoption Baker Hughes 5

Slide 28: Greater consistency: Oman
GREATER CONSISTENCY: OMAN Facilitated in-country technology deployment with remote expertise and support DRILLED | RECORDED DELIVERED | ACHIEVED 19,500 | ZERO | ZERO | 100% OF METERS | useINcIDENTS NPT CUSTOMER KPIs 23 SECTIONS Ask questions via Live Event Q&A 28 Copyright 2020 Baker Hughes Company.

Slide 29: Greater consistency: Kingdom of Saudi Arabia
GREATER CONSISTENCY: KINGDOM OF SAUDI ARABIA Delivered consistent performance through the Dhahran remote operations center RE-MANNED | RECORDED DRILLED REDUCED 10,000 ZERO | 5QQ+ | HSERISK SHIFTS | NIP'T | sections | COVID-19 Ask questions via Live Event Q&A 29 Copyright 2020 Baker Hughes Company. A

Slide 30: Greater consistency: United Arab Emirates
GREATER CONSISTENCY: UNITED ARAB EMIRATES Established remote operations as the new norm in UAE RE-MANNED RECORDED DRILLED = ACHIEVED 4,980 | ZERO AG5 rorwin SHIFTS | NIPT | sections | REMOTEDD Baker Hughes 52

Slide 31: Greater consistency: North America Land
GREATER CONSISTENCY: NORTH AMERICA LAND Improved mile-a-day drilling results with accelerated learnings and best practices Multiple, record-setting wells 10,308 ft in 24 hours: Noble Energy °9,925 ft in 24 hours: Antero Resources ° 9,796 ft in 24 hours: Antero Resources 9,487 ft in 24 hours: Southwe

Slide 32: The three keys to successful remote operations
The three keys to successful remote operations >) . nile) al The right An experienced A commitment technology partner to service quality + Reliable, secure + Proven track record + Thorough pre-well planning digital infrastructure * Detailed workflows and protocols + Accelerated learnings * Modern do

Slide 33: The value of effective remote operations
The value of effective remote operations iO; Y ml @ ae NA Reduced Improved Maximized Greater HSE risks performance efficiency consistency quality EVERYWHERE 33 copyright 2020 Baker Hughes Company. ll ights reserved. 82009 Baker Hughes Ss

Slide 34: Baker Hughes: bakerhughes.com/RemoteOps
Baker Hughes = bakerhughes.com/RemoteOps
Source: Internet Archive copy of us.public.bakerhughes.com
More decks from Baker Hughes Company
Q3 2026 Earnings Presentation27 slides · Oct 28, 2026
Technical Presentation (October 2026)17 slides · Oct 24, 2026
Barclays 40th Annual Energy-Power Conference (September 2026)19 slides · Sep 9, 2026
Q2 2026 Earnings Presentation25 slides · Jul 27, 2026
Q1 2026 Earnings Presentation23 slides · Apr 24, 2026
Q4 2025 Earnings Presentation25 slides · Jan 26, 2026