Gold Fields Limited · JSE:GFI

Gold Fields — Corporate Update (July 2022)

35 slides from Gold Fields's corporate update, July 2022

  1. Slide 1: Hybrid Microgrid Project

    Hybrid Microgrid Project Community Consultation Sessions July 2022

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. In particular, the forward-looking statements in this document include

  3. Slide 3: Acknowledgement of Indigenous Australian peoples

    Gold Fields acknowledges the Indigenous Australian peoples of the lands where we conduct our business activities. We wish to pay our deepest respects to all their ancestors and members of their communities, past, present, and to their emerging leaders. Our passion and commitment to work with all Aus

  4. Slide 4: Agenda

    Agenda What we are talking about today Why is this project important to Gold Fields? What are we proposing to build? What will it look like when it’s finished? What are the impacts of the project? How long will it take to build? What is the process from here?

  5. Slide 5: Why is this project important to Gold Fields?

    O) Why is this project important to Gold Fields? i

  6. Slide 6: Our vision

    Dur liision Where we want to go! To be the preferred gold mining company, delivering sustainable, superior value. Why we exist Creating enduring value beyond mining \) € value & avers Portfolio of 255° Dur Values How we behave while we execute our strategy e % - = ¥ a safety Integrity respect respon

  7. Slide 7: Gold Fields' 2030 ESG targets

    Gold Fields’ 2030 ESG targets TAILINGS MANAGEMENT + Conformance to the Global Industry Standard on Tailings Management + Reduce number of active upstream raised TSFs from pike) 33 GENDER DIVERSITY + 30% women representation STAKEHOLDER VALUE CREATION + 30% of total value created benefits host commun

  8. Slide 8: Decarbonisation

    Decarbonisation —_ Key developments in Australia + 50% absolute emission and 30% net emission 2 03 @) reductions from 2016 + Completion of the solar farm at baseline (Scope 1 and 2) Granny Smith Gold Mine ta ge ets + Completion of the Agnew Hybrid + Net zero emissions by Power project (solar and win

  9. Slide 9: Key objectives for St Ives

    Key objectives for St lves Why this is an important project for us The project is expected, once fully constructed, and commissioned, to result in a significant reduction of carbon emissions generated from the entire operational St lves mine. Benefits include: Reduction in pollution from a local poi

  10. Slide 10: What are we proposing to build at St Ives?

    What are we proposing to build at St Ives:

  11. Slide 11: St Ives Hybrid Microgrid

    St lves Hybrid Microgrid 40MW* Diesel Plant AOMWp Solar Farm 30MW/30MWh BESS Invincible [ Hamlet “6OMW** Windfarm

  12. Slide 12: St Ives Hybrid Microgrid: what we are proposing to build

    St lves Hybrid Microgird What we are proposing to build })"® Contingency!-\ cos /- Turbine} 4 | Locations} | C05. 1 ica gor! 1 te i I Pa

  13. Slide 13: Solar farm

    Solar farm Key facts + Solar farm will take up approximately 140ha of land. + It will use approximately 75,000 solar panels. + It will produce around 40MWp of power when there is enough sunlight. + Some power some will go directly to storage when the batteries are not fully charged. + The solar pane

  14. Slide 14: Wind farm

    Wind farm Key facts We are proposing to have up to 10 wind turbines Each turbine will produce around 6MW, giving a total of 60MW. . s The height of the wind turbines will depend on the manufacturer. af The tallest model available for the project is 155m tall when measured at the hub, and 240m tall w

  15. Slide 15: Battery storage

    Battery storage Key facts + Batteries add to the reliability of supply by charging when there is excess renewable energy and discharging when there is not enough wind and sun. + Batteries also provide grid stability, safety and control functions. + The batteries will store 30MWh of renewable energy

  16. Slide 16: Diesel generators

    Diesel generators Key facts The generators will run at the beginning of the project to supply power while the renewable energy sources are brought online. The generators will then only be switched on when there is not enough wind, sun or stored renewable energy, or when restarting the microgrid afte

  17. Slide 17: What will the project look like when completed?

    What will the project look like when completed? eS

  18. Slide 18: What will it look like?

    will it look like? ct from the proposed project ‘ct will be mainly visible from the mine itself. lookout you will see the wind turbines off in the round 22 km from the lookout. + The diesel generators and battery storage will probably be too low in the viewing field as they are only around 3 metres

  19. Slide 19: Proposed view of project from BP Road from Kambalda West

    Proposed view of project from BP Road from Kambalda West

  20. Slide 20: Proposed view from Kambalda's Red Hill Lookout

    Proposed view of project from Kambalda’s Red Hill Lookout

  21. Slide 21: Proposed view traveling North from Lanfranchi FIFO Camp

    Proposed view of the project at ground level traveling North from Lanfranchi FIFO Camp (South Road)

  22. Slide 22: Proposed view from Leviathan East Waste Rock Landform

    Proposed view of the project from Leviathan East Waste Rock Landform (at St lves Gold Mine)

  23. Slide 23: Proposed view looking southwards from the St Ives Gold Mine

    Proposed view of the project looking southwards from the St lves Gold Mine

  24. Slide 24: What we've done before

    What will it look like? What we've done before + Gold Fields has completed a similar project at the Agnew Gold Mine, north of Kalgoorlie. approximately 390km north of Kalgoorlie-Boulder in 2018. + The scale of the project was smaller, but included similar infrastructure combination including wind tu

  25. Slide 25: Agnew renewable microgrid

    Agnew renewable microgrid LEA: — Zi

  26. Slide 26: Agnew renewable microgrid

    Agnew renewable microgrid wr : WA

  27. Slide 27: Agnew renewable microgrid

    Agnew renewable microgrid

  28. Slide 28: How long will it take?

  29. Slide 29: St Ives renewable microgrid: what we are proposing to construct

    St lves renewable microgrid What we are proposing to construct 2 Project approvals Detailed design Investment decision Construction Conduct necessary Detailed design, Project to be Procurement and studies and planning and pricing, submitted to Gold construction of all consultation to including tende

  30. Slide 30: Other key considerations?

  31. Slide 31: Key project approvals

    Key project approvals Our current focus is on impact assessment + The project will require regulatory approvals from Environmental Protection Authority (EPA), Department of Water, Environment and Regulation (DWER) and Department of Mines, Industry Regulation and Safety (DMIRS). + We are currently in

  32. Slide 32: Environmental impacts

    Environmental impacts What are the key areas of impact we are looking at? + Noise — from construction and operation activities + Birds and bats — including any potential interaction with the project infrastructure + Transport — this includes Scope 3 Emission (GHG) accounting + Aviation — including a

  33. Slide 33: What Next?

  34. Slide 34: How you can provide feedback

    How you can provide feedback Any questions or comments + You can provide feedback by using the QR code and filling out a form. + You can also send your commentsor questions through to us at: sigmcommunityfeedbackline@goldfields.com + Any feedback is requested by 1 August 2022 or

  35. Slide 35: Thank you

    e=-— THANK YOU Questions?

Gold Fields — Corporate Update (July 2022) on 6ix