Endeavour Mining Plc · TSX:EDV

Endeavour Mining — Investor Presentation (September 2023)

179 slides from Endeavour Mining's investor presentation, September 2023

  1. Slide 1: Corporate Presentation

    TSX & LSE: EDV OTCQX: EDVMF CORPORATE PRESENTATION September 2023

  2. Slide 2: Table of Contents

    TABLE OF CONTENTS 1 Endeavour Overview 2 Financial Results and Outlook 3 Our High Quality Portfolio 4 Being a Trusted Partner 5 West Africa Insights 6 Appendix 2

  3. Slide 3: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS Cash cost per ounce and all-in sustaining cash cost per ounce are non-GAAP performance activities; changes in national and local government legislation, regulation of mining measures with no standard meaning under IFRS. This presentation contains statements

  4. Slide 4: Endeavour Overview

    ENDEAVOUR OVERVIEW 1 4

  5. Slide 5: Endeavour has an unmatched competitive advantage

    ENDEAVOUR HAS AN UNMATCHED COMPETITIVE ADVANTAGE IN THE WORLD’S LARGEST GOLD PRODUCING REGION 1 Largest 4 Gold 1,060-1,135koz West African producer mines AISC $895-950/oz 2023 guidance for continuing operations 5

  6. Slide 6: Relative to other senior gold producers

    RELATIVE TO OTHER SENIOR GOLD PRODUCERS CROSS SECTOR BENCHMARKING FY-2023 Production Guidance 7Moz 6Moz 5Moz 4Moz PEER 3Moz BENCHMARKING 2Moz 1Moz 0Moz Centerra Newmont IAMGOLD Kinross Agnico Eagle Newcrest SSR Mining Eldorado Gold Fields Northern Star Harmony Gold B2Gold Evolution Mining Alamos Bar

  7. Slide 7: Company Profile

    COMPANY PROFILE Highlights Top Shareholders Shareholder register as at 31 July 2023 Ticker LSE | TSX: EDV, OTXCQ: EDVMF Shares outstanding as at 1 September 2023 246m Rank Institution name % of S/O 1 La Mancha 18.1% Share price as at 1 September 2023 £16.22 / C$27.82 2 BlackRock Investment Managemen

  8. Slide 8: Our purpose is to produce gold that provides lasting value to society

    OUR PURPOSE IS TO EMBEDDING THE UN SDGS INTO OUR ESG STRATEGY PRODUCE GOLD THAT PROVIDES LASTING VALUE TO SOCIETY We do so while protecting and promoting the places where we operate. Our work is a partnership, helping to create resilient and self-sustaining communities, where people are equipped wit

  9. Slide 9: Our Strategy

    OUR STRATEGY Build a resilient business and be a trusted partner with the ability to reward shareholders MAINTAINING A BEING A REWARDING HIGH-QUALITY PORTFOLIO TRUSTED PARTNER SHAREHOLDERS Industry-leading operational excellence Employment and training Prudent balance sheet management Proven project

  10. Slide 10: Focused on being a resilient business

    FOCUSED ON BEING A RESILIENT BUSINESS High quality portfolio which generates sufficient cash flow to re-invest in our business and reward our stakeholders PORTFOLIO OBJECTIVES PORTFOLIO OPTIMISATION PILLARS $950/oz Industry-leading All-in Sustaining Cost 01 Operational Excellence +10 YEARS Productio

  11. Slide 11: Superior Operating Model

    1 SUPERIOR OPERATING MODEL OPERATIONAL EXCELLENCE Geographic focus provides a strong competitive advantage OPERATING MODEL MANAGEMENT TRACK RECORD › Largest producer in each of our operating countries enhances ability to extract synergies › Significant synergies from shared technical functions › Han

  12. Slide 12: Strong Construction Track Record

    CEO INTRODUCTION 2 STRONG CONSTRUCTION TRACK RECORD PROJECT DEVELOPMENT Leveraging our in-house construction expertise AGBAOU, CÔTE D’IVOIRE, BOUNGOU, BURKINA FASO WAHGNION, BURKINA FASO BUILT IN 2014 BUILT IN 2018 BUILT IN 2019 TRACK RECORD safely with zero LTIs HOUNDÉ, BURKINA FASO ITY CIL, CÔTE D

  13. Slide 13: Project Pipeline

    2 PROJECT PIPELINE PROJECT DEVELOPMENT Strong competition for capital on a returns basis across the portfolio +110 EXPLORATION PROPERTIES 7 DEVELOPMENT PROJECTS 4 MINING OPERATIONS Current high priority efforts: In construction: Optimisation initiatives: Siguiri Sia/Sianikoui Lafigué Sabodala-Massaw

  14. Slide 14: Sabodala-Massawa Expansion

    2 SABODALA-MASSAWA EXPANSION PROJECT DEVELOPMENT On budget and on track for first gold in Q2-2024 INSIGHTS BROWNFIELD PROJECT: › Expansion of flagship Sabodala-Massawa mine with a 1.2Mtpa SABODALA-MASSAWA EXPANSION BIOX® plant, designed to process high-grade refractory ore from the Massawa deposits

  15. Slide 15: Lafigué Greenfield Project

    2 LAFIGUÉ GREENFIELD PROJECT PROJECT DEVELOPMENT On budget and on track for first gold in Q3-2024 INSIGHTS GREENFIELD PROJECT: › Lafigué greenfield development is a potential cornerstone asset LAFIGUÉ ON FETEKRO PROPERTY with envisaged annual production of 203koz over the 12.8 year initial life of m

  16. Slide 16: Largest Exploration Presence in West Africa

    3 LARGEST EXPLORATION PRESENCE IN WEST AFRICA UNLOCKING EXPLORATION VALUE Endeavour has a strategic foothold in two of West Africa’s most prospective belts 60% of greenstone belt lies in Burkina Faso and Côte d’Ivoire but… …only represents ~30% of production since it is underexplored 16

  17. Slide 17: Proven Ranking and Screening Methodology

    Watch 3 PROVEN RANKING AND SCREENING METHODOLOGY video UNLOCKING EXPLORATION VALUE Based on techniques used in the oil and gas sector Outlook set in 2021 for the 5-year period ending 2025 Exhaustive Screened through multi- All screening based 150 criteria data analysis to targets on geological data

  18. Slide 18: Unlocking Exploration Value: 3.0 Moz

    3 UNLOCKING EXPLORATION VALUE UNLOCKING EXPLORATION VALUE 15Moz of M&I resources discovered since mid-2016 Total M&I resource discoveries M&I resources discovered Exploration spend 3.0Moz 15.0Moz Discovered 3.0Moz M&I resources 3.5Moz discovered in 2022 2.2Moz 2.1Moz 1.0Moz 1.3Moz 1.9Moz <$ 25/oz di

  19. Slide 19: Unlocking Exploration Value: 6.5 Moz

    3 UNLOCKING EXPLORATION VALUE UNLOCKING EXPLORATION VALUE On track to achieve 5-year discovery target of 12 - 17Moz for period ending 2025 5-year M&I resource discovery target from continuing operations Remaining Indicated resource discovery target (2021 - 2025) 6.5Moz M&I resources discovered in 20

  20. Slide 20: Tanda-Iguela Greenfield Project, Côte d'Ivoire

    TANDA-IGUELA GREENFIELD PROJECT, CÔTE D’IVOIRE Potential to be another flagship asset INSIGHTS › Maiden resource outlined in <15 months for a discovery cost of <$10 per Indicated ounce › Indicated resource of 14.9Mt at 2.33g/t for 1.1Moz and Inferred resource of 32.9Mt at 1.80g/t for 1.9Moz defined

  21. Slide 21: Focused on Long Life and Low AISC Assets

    4 FOCUSED ON LONG LIFE AND LOW AISC ASSETS ACTIVE PORTFOLIO MANAGEMENT Divested non-core assets and integrated four mines Key achievements across 4 pillars Endeavour’s portfolio Expanding Sabodala-Massawa Current operations1 Divested/Ceased operations Construction project2 AISC, $/oz Realised synerg

  22. Slide 22: Production Outlook

    PRODUCTION OUTLOOK Ability to grow high-quality production while maintaining industry-leading AISC Production Profile For discontinued operations For continuing operations Full-year benefit of Sabodala-Massawa expansion 1.6Moz and Lafigué Full year benefit of +1.3Moz Semafo assets <$950/oz and Purch

  23. Slide 23: Strong Cash Generation

    STRONG CASH GENERATION Provides ability to fund capital allocation priorities Operating Cash Flow and Capital expenditure Cash generated from operating activities Cash used in investing activities Realized 1.0B Gold Price INVESTMENT PHASE CASH FLOW PHASE +$ Operating CF FY-2022 $1,156m $1,022m $749m

  24. Slide 24: Robust Financial Position

    ROBUST FINANCIAL POSITION Healthy balance sheet supports shareholder returns and growth Net debt evolution (Net Debt)/ Net Cash 975m INVESTMENT DEBT REDUCTION SHAREHOLDER RETURNS PHASE PHASE PHASE WITH ABILITY TO FUND GROWTH $217m $ $167m $75m $76m $121m Available liquidity $3m as at 30 June 2023 ($

  25. Slide 25: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS $757m of cumulative returns since programme began SHAREHOLDER RETURNS POLICY Progressive Dividend Policy Supplemental Dividend Minimum Dividend Paid Minimum Progressive Dividend $100m $100m $100m › In 2021, Endeavour implemented a minimum ($0.40/sh) ($0.41/sh) ($0.40/s

  26. Slide 26: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS Returning significant value to shareholders H1-2023 shareholder returns declared1 PRODUCTION REVENUE Buyback $20m $196/oz returned for every ounce 10% of revenue of gold produced distributed $120m OPERATING CASHFLOW INDICATIVE YIELD Dividend $100m 33% of operating cash

  27. Slide 27: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS Buybacks continued to supplement dividends Cumulative shareholder returns Cumulative Buybacks Cumulative Dividend $757m ~$ 200/oz $637m Returned for every $257m ounce of gold produced during 2021 to YTD-2023 $237m $338m $138m $400m $500m1 11.5m Shares repurchased $60m

  28. Slide 28: Being a Trusted Partner

    BEING A TRUSTED PARTNER Sustainability efforts underpin top ESG ratings Sustainalytics 2022 scores1 Endeavour MSCI rating evolution2 Newmont Endeavour 2022 2022 AA Yamana Kirkland Gold Fields Agnico Eagle AngloGold Ashanti 2021 A Newcrest B2 Gold CCC Endeavour 2021 AA 17% 25% Kinross 2020 BB $300m B

  29. Slide 29: London Stock Exchange Listing

    LONDON STOCK EXCHANGE LISTING Significant increase in liquidity following index inclusions Volume traded on LSE compared to the TSX1 50% MSCI UK 50% of daily volume 42% in the UK 34% 31% 31% FTSE ALL FTSE SHARE + 100 FTSE 250 of shares outstanding in the UK register H2-2021 H1-2022 H2-2022 H1-2023 (

  30. Slide 30: Ability to reward shareholders across cycles

    Watch ABILITY TO REWARD SHAREHOLDERS ACROSS CYCLES video Underpinned by a resilient business, disciplined capital allocation and a strong competitive advantage in West Africa RESILIENT BUSINESS + DISCIPLINED CAPITAL ALLOCATION High Quality Being a Prudent Balance Sheet Organic Shareholder Returns Po

  31. Slide 31: Financial Results and Outlook

    FINANCIAL RESULTS AND OUTLOOK 2 31

  32. Slide 32: Financial Highlights

    FINANCIAL HIGHLIGHTS Strong production in Q2-2023 compared to Q1-2023 QUARTER ENDED 30 June 31 March 30 June Jun-23 For Continuing Operations1 2023 2023 2022 vs. Mar-23 +10% (in $ million unless otherwise stated) PRODUCTION, SALES AND AISC HIGHLIGHTS Gold production, koz 268 243 292 +10% Gold sales,

  33. Slide 33: Quarterly Production and AISC

    QUARTERLY PRODUCTION AND AISC FY-2023 production expected to be H2-2023 weighted Production and AISC Production for discontinued ops, koz AISC for continuing ops, US$/oz 25koz Production for continuing ops, koz 345koz 343koz 355koz + 311koz Production 301koz from continuing operations Q2-2023 vs Q1-

  34. Slide 34: Operating Cash Flow

    OPERATING CASH FLOW Cash flow generation expected to increase in upcoming quarters Operating cash flow Operating cash flow from discontinued operations1 47m Operating cash flow from continuing operations Realised Gold Price2 $311m -$ Operating cash flow $252m Q2-2023 vs. Q1-2023 $28m $206m $15m $154

  35. Slide 35: Adjusted EBITDA

    ADJUSTED EBITDA Continued strong adjusted EBITDA generation Adjusted EBITDA from continuing operations Adj. EBITDA from continuing operations Adj. EBITDA Margin Realised Gold Price1 $295m $253m Adjusted EBITDA $270m $253m from continuing $240m operations in Q2-2023 $232m 55% 13m 53% 50% 50% 48% +$ A

  36. Slide 36: Operating Cash Flow Bridge

    OPERATING CASH FLOW BRIDGE Cash flows decreased due to higher taxes paid INSIGHTS Operating cash flow bridge from all operations 1. The realised gold price for continuing 2 3 operations, including the impact of gold hedges, increased by $61/oz from $1,886/oz 1 ∆$11m in Q1-2023 to $1,947/oz in Q2-202

  37. Slide 37: Change in Net Debt

    CHANGE IN NET DEBT Low leverage position at quarter end with Net Debt / Adj EBITDA (LTM) of 0.15x INSIGHTS Change in net debt 1. For Q2-2023, operating activities included $161m in operating cashflow before 1 2 changes in working capital, a $14m working capital outflow and $13m in cash generated fro

  38. Slide 38: Debt Structure

    DEBT STRUCTURE Diversified long-term low capital cost debt structure Balance Sheet Structure INSIGHTS (in $ million unless stated otherwise) 30 Jun 2023 31 Mar 2023 30 Jun 2022 1. The Company drew down a further $155m on the revolving credit facility to manage short-term off- Cash $370m 845 810 1,09

  39. Slide 39: Stable Credit Rating

    STABLE CREDIT RATING S&P credit rating is capped by sovereign rating S&P Long-term foreign currency debt credit ratings Endeavour BB- BB- Cote d’Ivoire BB- S&P rating Senegal B+ Stable Outlook across all Burkina Faso CCC+ jurisdictions 39

  40. Slide 40: Net Earnings from Continuing Operations

    NET EARNINGS FROM CONTINUING OPERATIONS High profit margins due to low-cost production 3 MONTHS ENDED INSIGHTS 30 June 31 March, 1. Exploration costs increased from $13m in Q1-2023 (in $ million) A = Adjustments made for Adjusted Net Earnings to $15m in Q2-2023 due to increased expensed 2023 2023 ex

  41. Slide 41: Tackling Inflationary Pressures

    4 TACKLING 44 INFLATIONARY PRESSURES Leveraging our synergies in West Africa Fuel Average fuel price variance, $/L Q1-2022 Q3-2022 Q1-2023 › Fuel price is regulated by in-country based pricing Q2-2022 Q4-2022 Q2-2023 mechanisms where prices are revised periodically, +2% sheltering Endeavour from pea

  42. Slide 42: Short Term Revenue Protection Programme

    SHORT TERM REVENUE PROTECTION PROGRAMME Increased certainty of cash flow to achieve corporate objectives Gold collars INSIGHTS Gold price in US$/oz › In Q2-2023, 30koz were settled under the 2400 gold forward contract at a settlement price of Growth and shareholder $1,828/oz return focus › The reali

  43. Slide 43: 2023 Guidance

    2023 GUIDANCE INSIGHTS Production guidance from continuing operations › Full year 2023 production guidance for H1-23 ACTUALS 2023 GUIDANCE continuing operations has decreased from (All amounts in koz, on a 100% basis) 1,325 – 1,425koz to 1,060 – 1,135koz, while Ity 177 285 — 300 AISC guidance from c

  44. Slide 44: 2023 Guidance (Continued)

    2023 GUIDANCE (Continued) Capital expenditure guidance from continuing operations INSIGHTS H1-23 ORIGINAL 2023 REVISED 2023 (All amounts in US$m) ACTUALS GUIDANCE GUIDANCE › Sustaining capital expenditure guidance has been reduced to Houndé 20 40 40 $110m from due to a reduction at Ity due to lower

  45. Slide 45: Our High Quality Portfolio

    Watch video OUR HIGH QUALITY PORTFOLIO 3 45

  46. Slide 46: Diversified Portfolio

    DIVERSIFIED PORTFOLIO Data shown for continuing operations P&P RESERVES M&I RESOURCES 2022 Actuals 2023 Guidance as at 31 Dec 2022 as at 31 Dec 2022 ASSET COUNTRY PRODUCTION AISC PRODUCTION AISC CONTAINED GRADE CONTAINED GRADE (koz) (US$/oz) (koz) (US$/oz) GOLD (Moz) (g/t) GOLD (Moz) (g/t) Houndé Bu

  47. Slide 47: Production Performance vs Guidance

    PRODUCTION PERFORMANCE VS GUIDANCE Strong performance expected in H2-2023 H1-2023 Production vs Guidance H1-2023 AISC vs Guidance 177koz 285koz 300koz $840/oz $915/oz Ity H1 H1 $764/oz Guidance 119koz 270koz 285koz $850/oz $925/oz Houndé H1 H1 Guidance $1,113/oz 75koz 190koz 210koz $950/oz $1,050/oz

  48. Slide 48: Key Optimisations Initiatives

    KEY OPTIMISATIONS INITIATIVES Continued optimization efforts to tackle inflationary pressures Sabodala-Massawa Ity Sabodala in-pit tailings can have +$31m in savings with Recyn project improves the environmental footprint reduced environmental impact and is expected to result in 87kozpa additional g

  49. Slide 49: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Snapshot 315-340koz $760-810/oz 4.1Moz 6.3Moz As at As at 2023 Target 2023 Target 31 December 2022 31 December 2022 Production AISC P&P Reserves M&I Resources1 Overview The Sabodala-Massawa complex has potential to become a

  50. Slide 50: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Overview KEY OPPORTUNITIES RESERVES AND RESOURCES as at 31 December 2022 • BIOX expansion project Resources shown Tonnage Grade Content inclusive of Reserves (on a 100% basis) (Mt) (Au g/t) (Au koz) • On track to discover 2

  51. Slide 51: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Higher grade oxide ore expected in H2-2023 Q2-2023 vs Q1-2023 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Production increased due to a higher average grade processed, higher recovery rates and an increase i

  52. Slide 52: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Construction is on track and on budget BIOX® plant construction Primary Crusher INSIGHTS › Construction of the Sabodala-Massawa BIOX® project was launched in Q2-2022 and remains on budget and schedule for completion in Q2-2024. › $123m of growth capital has been incurred s

  53. Slide 53: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION BIOX® plant construction lifts Sabodala-Massawa mine to top tier status Sabodala-Massawa mine plan 2023 Guidance mid-point BIOX® production CIL production 450Koz Targeting production +400koz per annum 400Koz 350Koz 300Koz 250Koz 200Koz 150Koz 100Koz 50Koz 0Koz 2021A1 2022

  54. Slide 54: Robust Economics for the Expansion Project

    CORPORATE PRESENTATION Expansion Project Highlights (excludes current CIL operation) SABODALA-MASSAWA FIRST FIVE YEARS LIFE OF MINE Senegal (2024-2028) (2024-2033) OPERATING SUMMARY Tonnes processed, Mt 5.7 10.8 Strip ratio, W:O 7.7 8.5 ROBUST ECONOMICS Grade processed, Au g/t Gold contained process

  55. Slide 55: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Scope changes in DFS compared to PFS AREA DESCRIPTION OF CHANGE EXPECTED RESULT Capital cost estimates Additional geometallurgical work has reclassified Removes risk associated with blending transitional and fresh CAPITAL fresh and transitional ore from the Massawa ore wit

  56. Slide 56: Sabodala-Massawa Solar Plant

    SABODALA-MASSAWA SOLAR PLANT Solar plant construction launched to reduce energy cost and CO2 emissions INSIGHTS Sabodala-Massawa power generation and storage 24% › Construction launched on 37MWp photovoltaic solar facility and 16MW SOLAR PROJECT CURRENT PLANT battery system › Dornier Suntrace contra

  57. Slide 57: Sabodala-Massawa Mine Discovery Target

    DISCOVERY TARGET (2021-2025) SABODALA-MASSAWA MINE Senegal 2.3 - 2.7Moz $26/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2022 106Mt at 1.86g/t au containing 6.33Moz NEAR-TERM FOCUS Discovery of additional high-grade refractory and non-refractory ore resources. Explore high-g

  58. Slide 58: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I resource additions versus depletion M&I Resource at year end Cumulative Depletion ~10Moz 10.0Moz 9.8Moz 9.3Moz 9.3Moz 3.1Moz 2.4Moz 2.7Moz 3.5Moz Defined gold 6.3Moz endowment 6.1Moz 6.2Moz 1.6Moz1 1.9Moz 2.1Moz 6.3Moz 6.9Mo

  59. Slide 59: High Grade Reserves & Resources

    HIGH GRADE RESERVES & RESOURCES Potential for significant additions given exploration potential Sabodala-Massawa reserves and resources by ore type OXIDE TRANSITIONAL FRESH TOTAL Tonnage Grade Content Tonnage Grade Content Tonnage Grade Content Content 4.1Moz (Mt) (Au g/t) (Au koz) (Mt) (Au g/t) (Au

  60. Slide 60: Near Term Exploration Focus

    EXPLORATION NEAR TERM EXPLORATION FOCUS Focussed on expanding existing resources and discovering new resources INSIGHTS › An exploration programme of $15.0m is planned for FY-2023, of which $11.5m has been spent in H1-2023 with $8.2m spent in Q2- 2023 consisting of 49,243 metres of drilling across 2

  61. Slide 61: Kiesta

    KIESTA High-grade intercepts at the Kiesta discovery are being delineated INSIGHTS › The Kiesta target is located along the Sabodala Shear Zone › The deposit is located in the north of the Massawa mining license, approximately 18 kilometers southeast of the Sabodala-Massawa processing plant › Follow

  62. Slide 62: Bambaraya

    BAMBARAYA Resource increased at Bambaraya deposit INSIGHTS › The Bambaraya deposit is located in the northwest corner of the Massawa mining license, approximately 13 kilometers south of the Sabodala-Massawa processing plant › Following successful exploration work during 2022, an updated mineral reso

  63. Slide 63: Bambaraya

    BAMBARAYA Mineralisation from surface extending over 2,000m along strike 63

  64. Slide 64: Sofia North Extension

    SOFIA NORTH EXTENSION Shallow high grade mineralisation extending for over 800m along strike 64

  65. Slide 65: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Snapshot 285-300koz $840-915/oz 3.0Moz 5.0Moz As at As at 2023 Target 2023 Target 31 December 2022 31 December 2022 Production AISC P&P Reserves M&I Resources1 Overview The Ity mine is one of Endeavour’s cornerstone as

  66. Slide 66: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Overview KEY OPPORTUNITIES RESERVES AND RESOURCES as at 31 December 2022 Tonnage Grade Content • Continued inclusion of new discoveries, including Le Plaque, to Resources shown (Mt) (Au g/t) (Au koz) provide greater mi

  67. Slide 67: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Record half year performance Q2-2023 vs Q1-2023 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Following a record Q1-2023 performance, production decreased due to lower average grades milled, lower tonnes

  68. Slide 68: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Overview Ity production plan 2023 Guidance mid-point Incremental production added 2017 Optimization Study 350koz 300koz Target production of 250koz over +10 years expected to be achieved based on exploration potential

  69. Slide 69: Ity Mine: Recyanidation Project

    ITY MINE Recyanidation Project INSIGHTS 3D Model › Recyanidation circuit aims to: ‒ optimise costs by reducing leaching and detox reagent consumption ‒ improving the quality of the discharge water ‒ increasing production through higher recovery rates › The Recyanidation process reduces cyanide consu

  70. Slide 70: Ity Discovery Target (2021-2025)

    DISCOVERY TARGET (2021-2025) ITY MINE Côte D’Ivoire 3.5 – 4.5Moz $17/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2022 97Mt at 1.59g/t au containing 4.97Moz NEAR-TERM FOCUS 3.3Moz discovered since 2016 with +10 year mine life. Focus to maintain and extend mine life through h

  71. Slide 71: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I Resource additions versus depletion Cumulative depletion M&I resources2 6.9Moz 7.8Moz 7.8Moz 5.9Moz 2.8Moz Defined gold 5.7Moz 5.2Moz 5.3Moz 2.5Moz endowment 1.9Moz 2.1Moz 4.2Moz 1.5Moz 1.6Moz 1.5Moz1 3.6Moz 5.0Moz 4.5Moz 3.

  72. Slide 72: Ity Resource Model

    ITY RESOURCE MODEL Evolution of resource model (3D view looking North) 2017 Ity area resource model 2022 Ity area resource model 72

  73. Slide 73: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focussed on extending mineralisation at known deposits INSIGHTS › An exploration programme of $14.0m is planned for FY- 2023, of which $9.5m has been spent in H1-2023 with $4.9m spent in Q2-2023 consisting of 32,160 metres of drilling across 338 drill holes. Q2-2023 › Dri

  74. Slide 74: West Flotouo

    WEST FLOTOUO High grade discovery close to the Ity CIL plant West Flotouo Plan Map West Flotouo Cross Section VO21-165 8.4m @ 4.57 g/t Au 5.9m @ 14.55 g/t Au VO21-176 25.8m @ 4.91 g/t Au 4.2m @ 10.85 g/t Au VO21-158 14.8m @ 3.04 g/t Au 5.9m @ 10.65 g/t Au VO21-096 25.2m @ 13.00g/t Au 3.7m @ 11.01g/t

  75. Slide 75: Le Plaque

    LE PLAQUE Continuity demonstrated between Delta extension and Yopleu-Legaleu INSIGHTS Le Plaque Exploration Targets › The high grade Le Plaque deposit has been extended to the south towards Delta Extension and Le Plaque southwest. › Resource ore type is 77% fresh and the strip ratio is expected to b

  76. Slide 76: Delta Extension

    DELTA EXTENSION Mineralisation extends below pit shell 76

  77. Slide 77: Walter-Bakatouo

    WALTER-BAKATOUO Near mine low strip ratio resources added WA21-052 5m @ 17.02 g/t Au WA21-074 3m @ 4.35 g/t Au 26.9m @ 3.24 g/t Au 6m @ 2.7 g/t Au WA21-033 WA21-025 18.4m @ 2.73 g/t Au 2m @ 39.84 g/t Au 23m @ 4.29 g/t Au 6.4m @ 3.86 g/t Au WA21-022 11m @ 2.54 g/t Au WA21-060 16.9m @ 6.20 g/t Au 19m

  78. Slide 78: Gbampleu

    GBAMPLEU New discovery is a promising target on the Toulepleu-Ity greenstone belt INSIGHTS Gbampleu selected drill holes › The Gbampleu discovery is located in the Toulepleu exploration permit (PR462), 22km south of the Ity plant. The prospect sits in the center part of the Toulepleu-Ity greenstone

  79. Slide 79: Gbampleu

    GBAMPLEU New discovery is a promising target on the Toulepleu-Ity greenstone belt 79

  80. Slide 80: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso 270-285koz $850-925/oz 2.7Moz 4.7Moz As at As at 2023 Target 2023 Target 31 December 2022 31 December 2022 Production AISC P&P Reserves M&I Resources1 Overview The Houndé mine is one of Endeavour’s The

  81. Slide 81: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES as at 31 December 2022 Resources shown Tonnage Grade Content • Greater mining flexibility with multiple available ore sources inclusive of Reserves (on a 100% ba

  82. Slide 82: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Higher processed grades expected in H2-2023 Q2-2023 vs Q1-2023 INSIGHTS Production and AISC › Production increased due to higher grades processed, higher Production, koz AISC, US$/oz tonnes of ore milled and increas

  83. Slide 83: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso Houndé production plan 2023 Guidance mid-point Incremental production added 2016 Optimization Study 300Koz Target production of 250koz over +10 years expected to be achieved based on exploration potenti

  84. Slide 84: Houndé Discovery Target (2021-2025)

    DISCOVERY TARGET (2021-2025) HOUNDÉ MINE Burkina Faso 3.0 – 4.0Moz $19/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2022 93Mt at 1.56g/t au containing 4.68Moz NEAR-TERM FOCUS Focused on maintaining +10-year mine life. Focused on near mill targets such as Kari Area, Vindaloo

  85. Slide 85: Discovery Track Record

    DISCOVERY TRACK RECORD Resource base continues to grow net of depletion M&I Resource additions versus depletion M&I resources1 Cumulative Depletion 6.2Moz 6.4Moz 6.2Moz 5.5Moz 1.2Moz 1.5Moz 0.9Moz Defined gold 4.5Moz endowment 0.6Moz 3.5Moz 0.4Moz 2.6Moz 2.5Moz 5.2Moz 3.6Moz 0.1Moz 4.6Moz 4.7Moz 3.9

  86. Slide 86: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focussed on near mine exploration targets INSIGHTS Houndé plan map highlighting soil geochemical anomalies › An exploration programme of $7.0m is planned for FY- 2023, of which $4.1m has been spent in H1-2023 with $2.4m spent in Q2-2023 consisting of 11,249 metres of dril

  87. Slide 87: Mambo

    MAMBO Delineation of the Mambo discovery INSIGHTS Mambo geology and drilling intercepts › Mambo is an attractive deposit as it is expected to have a low strip ratio, the resource contains approximately 40% oxide and transitional material › The higher-grade portion (+2g/t) of the Mambo deposit is exp

  88. Slide 88: Golden Hill Exploration

    GOLDEN HILL EXPLORATION Potential to integrate within the Houndé mine plan INSIGHTS › Advanced-stage exploration project on the Houndé Belt within trucking distance (25-30 kilometers) of the Houndé mine › Indicated resource of 753koz at 1.86 g/t and an Inferred resource of 760koz at 1.81 g/t as at 3

  89. Slide 89: Sianikoui

    SIANIKOUI Drilling at high-grade target north of Kari area 89

  90. Slide 90: Vindaloo South and Deeps

    VINDALOO SOUTH AND DEEPS Drill programme focussing on delineating mineralisation extensions INSIGHTS › The 2022 drill programme was focussed on extending resources at Vindaloo South, the 2023 program will focus on extending the mineralisation of Vindaloo Southeast along strike and delineating the un

  91. Slide 91: Vindaloo South Section

    VINDALOO SOUTH SECTION Mineralisation remains open at depth 91

  92. Slide 92: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso 190-210koz $950-1,050/oz 0.9 Moz 2.2 Moz As at As at 2023 Target 2023 Target 31 December 2022 31 December 2022 Production AISC P&P Reserves M&I Resources1 Overview The Mana mine is located in the northern

  93. Slide 93: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES as at 31 December 2022 • Mine life extensions through open pit and underground exploration Tonnage Grade Content Resources shown (Mt) (Au g/t) (Au koz) • Transitio

  94. Slide 94: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Higher processed grades expected in H2-2023 Q2-2023 vs Q1-2023 INSIGHTS Production and AISC Production, koz AISC, US$/oz › Production decreased due to lower average grades processed and lower recoveries, which was par

  95. Slide 95: Mana Discovery Target (2021-2025)

    DISCOVERY TARGET (2021-2025) MANA MINE Burkina Faso 1.0 – 1.5Moz $30/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2022 34Mt at 1.99 g/t Au containing 2.18Moz NEAR-TERM FOCUS Extend mine life to +10 years through exploration of Siou underground, Wona underground as well as ex

  96. Slide 96: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focussed on non-refractory open-pit targets INSIGHTS Mana exploration map › An exploration programme of $5.0m is planned for FY- 2023, of which $3.9m has been spent in H1-2023 with $2.6m spent in Q2-2023 consisting of 9,404 metres of drilling across 70 drill holes. Q2-202

  97. Slide 97: Maoula

    MAOULA Open pit oxide target 97

  98. Slide 98: Maoula

    MAOULA Mineralisation open between east and west structures NW MARC21-214 Base line MARC21-208 4.0m @ 3.33 g/t \ 14m SE 5.0m @ 1.99 g/t \ 25m 4.0m @ 1.35 g/t \ 21m 6.0m @ 1.53 g/t \ 69m MARC21-207 8.0m @ 2.09 g/t \ 26m Laterite MARC21-209 300m RL 5.0m @ 3.63 g/t \ 118m MARC21-210 7.0m @ 3.29 g/t \ 1

  99. Slide 99: Nyafe Sud

    NYAFE SUD Drilling focussed on delineating under explored refractory ore potential NYRC22-008 NYRC22-009 NYDD21-002 6 m @ 1.57 g/t \ 101m 6 m @ 1.99 g/t \ 55m 4.0 m @ 3.67 g/t \ 38.0m 1 m @ 1.50 g/t \ 153m 1 m @ 1.37 g/t \ 94m 1.2 m @ 1.99 g/t \ 97.1m 1 m @ 4.05 g/t \ 159m 3 m @ 2.69 g/t \ 97m 99

  100. Slide 100: Lafigué Project

    Website 3D mine site tour LAFIGUÉ PROJECT Côte D’Ivoire 203koz $871/oz 2.7Moz 3.0Moz As at As at Life of Mine annual Life of Mine annual 31 December 2022 31 December 2022 Production AISC P&P Reserves M&I Resources1 Overview The Lafigué project will become Endeavour’s next cornerstone asset. It also

  101. Slide 101: Lafigué Project DFS Confirms Potential to be a Cornerstone Asset

    Lafigué Project DFS highlights LAFIGUÉ PROJECT PLANT TYPE, SIZE & CAPEX Plant type Gravity / CIL Côte D’Ivoire Mill capacity 4.0 Upfront capital cost, $m 448 RESERVES & RESOURCES (as at 31 December 2022) P&P Reserves, koz 49.8Mt at 1.69 g/t for 2.7Moz DFS CONFIRMS M&I Resources, koz 46.3Mt at 2.03 g

  102. Slide 102: Lafigué Project

    Website 3D mine site tour LAFIGUÉ PROJECT Long life and low AISC operation Lafigué production plan DFS Production DFS AISC 300koz 250koz $2,000/oz 203Koz $1,600/oz Average annual Target production of +200koz Production over LOM 200koz $1,200/oz 150koz +33% $800/oz 100koz $400/oz 50koz Incremental pr

  103. Slide 103: Lafigué Project

    Website 3D mine site tour LAFIGUÉ PROJECT Endeavour’s next cornerstone asset HPGR Substation construction INSIGHTS › Construction was launched in early Q4-2022, following completion of a DFS that confirmed Lafigué’s potential to be a cornerstone asset for Endeavour with first gold production schedul

  104. Slide 104: Lafigué Project

    LAFIGUÉ PROJECT Lafigué process plant layout Côte D’Ivoire Mining • Open-pit drill & blast mining will be carried out by contractors with a maximum mining capacity of 55Mt per year • Fleet will comprise 400t class face shovels to load 180t capacity trucks for waste, and 200t class excavators to load

  105. Slide 105: Lafigué Discovery Target (2021-2025)

    DISCOVERY TARGET (2021-2025) LAFIGUÉ PROJECT Côte D’Ivoire 1.5 – 2.0Moz $45/oz Indicated resources Discovery cost M&I RESOURCES as at 31 December 2022 46Mt at 2.04g/t Au containing 3.03Moz NEAR-TERM FOCUS 3.03Moz of M&I resources have been discovered since 2018 with the aim to further extend the Laf

  106. Slide 106: Fetekro Exploration Property

    FETEKRO EXPLORATION PROPERTY Eight high priority targets to be followed up with over the next year INSIGHTS Fetekro Exploration permit select intercepts › The exploration programme is currently focussed on sterilisation drilling around the Lafigue mine footprint, while resources are being allocated

  107. Slide 107: Lafigué North

    LAFIGUÉ NORTH Section 320205 107

  108. Slide 108: Lafigué Center

    LAFIGUÉ CENTER Section 319830 108

  109. Slide 109: Tanda & Iguela

    INSIGHTS › Maiden resource outlined very quickly (under 15 months) since discovery was made at a low discovery cost of <$10 per indicated ounce TANDA & IGUELA Côte D’Ivoire TONNAGE GRADE CONTENT (Mt) (Au g/t) (Au koz) Indicated 14.9 2.33 1,114 Inferred 32.9 1.80 1,903 › Tanda-Iguela property has the

  110. Slide 110: Assafou Deposit

    ASSAFOU DEPOSIT Target remains open along depth and strike INSIGHTS › Assafou mineralised system has now been defined over three kilometres in length and remains open along strike in both directions, as well as at depth › The 2022 delineated Indicated resource covers only 20% of the defined minerali

  111. Slide 111: Assafou Deposit

    ASSAFOU DEPOSIT Select intercepts exceeded 100 metres in true thickness at above 3.00g/t gold Assafou section 1766 111

  112. Slide 112: Assafou Deposit

    ASSAFOU DEPOSIT Select intercepts exceeded 100 metres in true thickness at above 3.00g/t gold Assafou section 2166 Assafou section 2433 112

  113. Slide 113: Assafou Deposit

    ASSAFOU DEPOSIT Periphery intercepts of the Indicated Resource show potential for continuity Assafou section A2700 at Northwest limit of the indicated resource boundary Assafou A2800 showing high grade intercepts outside the indicated resource boundary towards Northwest 113

  114. Slide 114: Assafou Deposit

    ASSAFOU DEPOSIT Periphery intercepts of the Indicated Resource show potential for continuity Assafou Section A1800 showing inferred resource high grade intercepts 200m Assafou Section A0400 showing intercepts 2 km outside of the indicated resource to SE of the Indicated resource boundary boundary to

  115. Slide 115: Tanda-Iguela Regional Targets

    TANDA-IGUELA REGIONAL TARGETS 10 targets identified so far on the Tanda-Iguela permit INSIGHTS Tanda-Igulea regional map › 13,695 metres of the 20,000 metre FY-2023 regional drilling programme have been completed as of H1-2023 across ten priority targets › Encouraging results have been returned from

  116. Slide 116: Guitry - Krakouadiokro

    INSIGHTS › Located on the southern extension of the Houndé greenstone belt which is largely underexplored in GUITRY - KRAKOUADIOKRO O Côte D’Ivoire R Côte d’Ivoire K O A -Y › Mineralisation occurs in N A N moderately to steeply dipping O K subparallel brittle-ductile graphitic shear zones in contact

  117. Slide 117: Kalana Project

    PFS press release Website Latest technical report KALANA PROJECT Mali QUICKFACTS (ON 100% BASIS) – 2021 UPDATED PFS RESERVES AND RESOURCES as at 31 December 2022 Ownership 80% EDV; 20% Mali government Mine Type Open Pit Tonnage Grade Content Mill Type 3.0Mtpa Gravity / CIL Plant Resources shown incl

  118. Slide 118: Kalana Project

    KALANA PROJECT Kalana 2016 vs. 2021 Study Comparison1 Mali 2021 STUDY 2016 STUDY VARIANCE PLANT SIZE & CAPEX Nominal mill capacity, Mtpa 3.0 1.2 +150% Upfront capital cost, $m 297 196 +51% › Key changes in updated PFS compared to LIFE OF MINE STATS the 2016 Avnel study: Mine life, years 11 18 -39% ‒

  119. Slide 119: Kalana Project

    Kalana license and exploration targets KALANA PROJECT Mali › Discovery of additional deposits may provide an extension of the Kalana mining operation. In addition, potential high-grade free-digging soft material may provide further operating flexibility › The Kalanako Northwest area is highly prospe

  120. Slide 120: Bantou Project

    INSIGHTS › Acquired through Endeavour’s acquisition of SEMAFO in 2020 and currently consists of eight mineralised zones with diverse BANTOU PROJECT mineralisation styles and grades within the prolific Houndé Burkina Faso Greenstone Belt › The Inferred resource is comprised of three main areas with t

  121. Slide 121: Nabanga Project

    INSIGHTS Nabanga deposit plan map and schematic cross-section › Located 250 kilometres southeast of Ouagadougou, the Nabanga Gold NABANGA PROJECT Project lies within the Nabanga Burkina Faso exploration permit. › Results of Preliminary Economic Assessment (PEA) released on September 30, 2019. ‒ Pre-

  122. Slide 122: Greenfield Liguidi

    122 GREENFIELD LIGUIDI Burkina Faso

  123. Slide 123: Greenfield Siguiri Licenses

    123 GREENFIELD SIGUIRI LICENSES Guinea

  124. Slide 124: Greenfield Nassile / Da-Guity

    INSIGHTS › Highly prospective area of Nassile and Dar-Guiti Niger GREENFIELD NASSILE / DA-GUITY › Exploration Permit obtained in 2017 › Exploration Permit covers a total surface area of 695km² 124

  125. Slide 125: Greenfield Kofi

    INSIGHTS › Kofi on same trend as Barrick’s Loulo- Mali GREENFIELD KOFI Gounkoto in Mali › Exploration license of Kofi not sold in Tabakoto sales process › Aim is to attain additional license around Kofi North/Netekoto to consolidate exploration cluster 125

  126. Slide 126: Being a Trusted Partner

    Watch video BEING A TRUSTED PARTNER 4 126

  127. Slide 127: Our purpose is to produce gold that provides lasting value to society

    OUR PURPOSE IS TO PRODUCE GOLD THAT PROVIDES LASTING OURVALUE PURPOSETO IS TOSOCIETY PRODUCE GOLD THAT PROVIDES LASTING VALUE TO SOCIETY We achieve this by... Protecting and promoting the Helping to create resilient and Trusted to unlock the full benefits places where we operate self-sustaining comm

  128. Slide 128: Improving our Transparency & Disclosure

    IMPROVING OUR TRANSPARENCY & DISCLOSURE As our company has grown, so have our ESG initiatives and commitments 2022 • New Code of Business 2021 Conduct and Ethics • External assurance on key 2020 ESG data • New Group-wide Tailings Management Policy • 1st RGMP externally • 7 RGMPs externally assured a

  129. Slide 129: Continuous Improvement in ESG Ratings

    CONTINUOUS IMPROVEMENT IN ESG RATINGS Reflecting increased transparency, disclosure and engagement 2019 2022 2019 23.9 /100 Medium Risk 2022 Relative Performance 2020 2022 2019 2020 2021 2022 Climate D- C C B- Change Water N/A C C C 129

  130. Slide 130: Towards Net Zero

    TOWARDS NET ZERO INSIGHTS TARGETS › Working to improve the efficiency of our operations, reduce energy use and associated costs, and lower emissions are key drivers of the Group’s long-term sustainability Achieve <0.64 t CO2-e /oz 2023 › Achieved 2022 Group emissions intensity target (total Scope 1

  131. Slide 131: Energy Sources

    ENERGY SOURCES SNAPSHOT OF OUR POWER SOURCES AND OPPORTUNITIES SENEGAL CÔTE D’IVOIRE BURKINA FASO Country Profile Country Profile Country Profile • 79% Fossil, 21% Renewables (Solar, Wind, Hydro) • Well-developed national infrastructure • 68% Imported, 32% Domestic Production • 77% Fossil (Natural G

  132. Slide 132: Peer Benchmarking

    PEER BENCHMARKING Global gold producer emission intensities 3.90 Emission Intensity (kt CO2-e/oz) 1.63 1.51 LOW INTENSITY Industry average intensity of 1.001 1.00 PRODUCER 0.80 0.81 0.76 0.64 0.67 0.54 0.57 0.40 36% Below industry Anglogold B2Gold Northern Star Newcrest Kinross Agnico-Eagle Fresnill

  133. Slide 133: Water Stewardship

    WATER STEWARDSHIP INSIGHTS Water stress index › Our approach is to use water as efficiently as possible Low <10% › We pay for the water we withdraw as part of our water permits Low-Medium 10-20% › Total water withdrawal increased by 50% in 2022 over 2021 due largely to: Medium-high 20-40% › Delays i

  134. Slide 134: Responsible Tailings Management

    RESPONSIBLE TAILINGS MANAGEMENT INSIGHTS Active Endeavour TSFs › Conduct regular internal and external audits, results are reported back to senior management and the Board › We support the Global Industry Standard on Tailings Management (GISTM) and are working towards alignment › Annual tailings dis

  135. Slide 135: Protecting the Environment

    PROTECTING THE ENVIRONMENT INSIGHTS TARGETS › We are committed to protecting and conserving nature and biodiversity. Protect 300ha of land 2023 › Our Environmental policy includes a commitment to No Net Loss of Critical Habitat, Reclaim 60ha of land › We will not undertake exploration or mining acti

  136. Slide 136: Creating Jobs & Upskilling Talent

    CREATING JOBS & UPSKILLING TALENT INSIGHTS Our employees, by origin Our workforce Nationals Female employees › Total workforce of 14,140 including 5,659 Local Communities Female contractors employees & 8,481 contractors (YE-2022) Male employees Expatriates Male contractors LOCALISING MANAGEMENT 94%

  137. Slide 137: Boosting Host Economies

    BOOSTING HOST ECONOMIES INSIGHTS Procurement budget Payments to governments National and Local suppliers Senegal › We prioritise in-country suppliers and the Foreign Suppliers Côte d’Ivoire development of domestic supply chains to Burkina Faso create employment opportunities › We contribute to natio

  138. Slide 138: The Endeavour Foundation

    THE ENDEAVOUR FOUNDATION INSIGHTS › Launched in 2021, the Endeavour Foundation is our primary vehicle to implement projects beyond the mine, focused on regional, national and trans-border projects › $1.2 million invested since 2021 in the areas of education, skills training, fighting malaria, plasti

  139. Slide 139: EcoDev – Endeavour's Impact Investment Fund

    ECODEV – ENDEAVOUR’S IMPACT INVESTMENT FUND INSIGHTS › Established by Endeavour to support national economic growth › $2.9 million invested since fund inception (2021-2022) › Invests in the creation of local long-term, sustainable, SMEs with reputable partners Mali Shi Ranch du Tuy Turkey Farm Image

  140. Slide 140: Community Engagement

    COMMUNITY ENGAGEMENT INSIGHTS › 4,688 community consultations in 2022 › Range of income-generating activities in place, with a focus on the youth and women › Physically resettled 387 households comprising 3,298 people across our mines › Implementing programmes for 1,788 people who were economically

  141. Slide 141: Targeting Zero Harm

    TARGETING ZERO HARM INSIGHTS Lost time injury frequency (LTIFR) All injury frequency rate (AIFR) › For 2022, we set ourselves a target to -25% 0.26 3.66 reduce all incidents by 10%; Our LTIFR -90% 3.47 decreased by 91% and our TRIFR decreased 0.20 2.60 by 25% › Regrettably, we recorded a fatality of

  142. Slide 142: Diversity & Inclusion

    DIVERSITY & INCLUSION INSIGHTS Female representation in total workforce EDV Femmes › Employment of women in mining in West 9% 9% Africa remains a relatively new, 8% predominantly due to historical perceptions of the industry and cultural traditions. › We continue to address this bias by actively pro

  143. Slide 143: Ethical Business

    ETHICAL BUSINESS INSIGHTS TARGETS › Zero substantiated reports of bribery, corruption, human rights or modern slavery RGMP compliance at our remaining › In 2022 we published our first externally assured Conflict Free Gold Standard Report 2023 mines, as per the WGC timeframe › In 2022 we published ou

  144. Slide 144: Governance Framework

    GOVERNANCE FRAMEWORK THE BOARD ESG Committee Audit Committee Quarterly Executive Management Committee EVP PA, Security and Social Perf. EVP ESG & Supply Chain Executive ESG SteerCo Quarterly Legal Working group Sector Specialists HSE Sustainability HR Social Tech Supply Investor PA performance Servi

  145. Slide 145: Aligning ESG Priorities Through Exec Comp

    ALIGNING ESG PRIORITIES THROUGH EXEC COMP FY-2023 FY-2022 FY-2021 Target Weighting Target Weighting Target Weighting 15% level of Group wide 7.5% 5% reduction in TRIFR 15% 10% reduction in TRIFR 10% female recruitment SHORT-TERM INCENTIVE Two additional mines 7.5% 75% host country sourcing 10% compl

  146. Slide 146: Short Term Incentive Plan

    SHORT TERM INCENTIVE PLAN 2023 MEASURES WEIGHTING1 (%) THRESHOLD TARGET MAXIMUM Net free cash flow2 20.0% 5% below target $35m2 10% above target Production 12.5% >1,300koz 1,391koz Beat high end of guidance AISC 12.5% Within guidance $970/oz3 Beat low end of guidance ESG: RGMP4,5 7.5% One additional

  147. Slide 147: Long Term Incentive Plan

    LONG TERM INCENTIVE PLAN 2023 MEASURES WEIGHTING1 (%) THRESHOLD TARGET MAXIMUM2 TSR - Performance 25.0% Mid point Mid point Top quartile (Rank 1-20)3,4 Absolute shareholder 25.0% $475m $525m $600m returns Net debt 10.0% <0.5x <0.3x ≤0.2x Projects5 12.5% IRR ≥ 18% IRR ≥ 20% IRR > 25% Exploration 12.5

  148. Slide 148: Our 2023 Material Topics

    OUR 2023 MATERIAL TOPICS GRI Indicator Aspect Materiality: Impact Materiality: Financial GRI 202 Local Impact: Delivering benefits including meaningful work for our host Financial: Moderate – Failure to secure social licence could impact operations and lead communities helps to build and reinforce o

  149. Slide 149: Strong & Diverse Corporate Governance

    STRONG & DIVERSE CORPORATE GOVERNANCE Size of Board = 9 Nationalities represented on the Board Board experience by sector Strategy & Leadership International Business 8 5 1 Metals & Mining Finance & Accounting Public Policy Operations & Exploration Corporate Governance Sustainability & Non-Executive

  150. Slide 150: West Africa Insights

    Watch video WEST AFRICA INSIGHTS 5 150

  151. Slide 151: West Africa's Competitive Advantage

    EXPLORATION Top region for discoveries over the last 10 years globally WEST AFRICA'S COMPETITIVE ADVANTAGE PERMITTING Amongst the quickest permitting timelines Endeavour is strategically positioned globally with an unmatched competitive advantage in the region. West Africa has become the largest gol

  152. Slide 152: West African Production Growth

    REGION’S PRODUCTION GROWTH WEST AFRICAN PRODUCTION GROWTH Burkina Faso Mali Guinea % of Mine Supply Côte d’Ivoire Senegal Ghana and Other WEST AFRICA 18Moz 16% IS THE FASTEST- GROWING GOLD 14% PRODUCING REGION 15Moz 12% West African Mine Supply (ounces) 12Moz Percentage of Global Mine Supply 10% +80

  153. Slide 153: Annual Gold Production by Region

    PRODUCTION FOR THE REGION ANNUAL GOLD PRODUCTION BY REGION In millions of ounces, for 2022 WEST AFRICA 16Moz IS THE LARGEST GLOBAL GOLD PRODUCING REGION 12Moz 10Moz 10Moz 6 out of the top 10 senior gold producers have a presence in West Africa, with Endeavour being the largest producer in the region

  154. Slide 154: Endeavour is the Dominant West African Gold Producer

    PRODUCTION WEST AFRICAN GOLD PRODUCTION 2022 Endeavour 1.40 Moz ENDEAVOUR IS THE DOMINANT Newmont 0.99 Moz WEST AFRICAN Anglogold 0.78 Moz GOLD PRODUCER Gold Fields 0.74 Moz Barrick 0.73 Moz Given its focus on West Africa, Endeavour has a strategic industrial Perseus 0.52 Moz benefit from being geog

  155. Slide 155: Gold Industry 2022 Exploration Budget

    GOLD INDUSTRY 2022 EXPLORATION BUDGET In US$ millions WEST AFRICA IS 1,789 THE 4TH LARGEST EXPLORATION FOCUS ACROSS THE GLOBE 1,340 Given that exploration spend often foreshadows future production growth, West Africa has the potential to be an 882 even larger producing region. 509 327 7.4% +$6B 202

  156. Slide 156: Exploration Spend Discoveries by Area

    INDUSTRY EXPLORATION SPEND DISCOVERIES BY AREA For the period between 2010-2021 67Moz WEST AFRICA RANKS 1ST FOR DISCOVERIES OVER PAST DECADE The region is significantly under-explored compared to other regions. 28Moz 27Moz 23Moz 67 20Moz 19Moz 18Moz 18Moz 18Moz 17Moz 15Moz Moz 14Moz 13Moz 11Moz 8Moz

  157. Slide 157: Endeavour's Operating Model

    ENDEAVOUR’S OPERATING MODEL › Geographic focus provides a strong competitive advantage › Largest producer in each of our operating countries › Hands-on management model with teams close to operations › Senior management team spends significant time in-country › General managers empowered and rely on

  158. Slide 158: Endeavour Holds One of the Largest Land Tenement Holdings

    UNDER-EXPLORED REGION ENDEAVOUR HOLDS ONE OF THE LARGEST LAND TENEMENT HOLDINGS IN WEST AFRICA 60% of greenstone belt lies in Burkina Faso and Côte d’Ivoire but… …only represents ~30% of production Endeavour has a strategic foothold in since it is two of West Africa’s most prospective belts underexp

  159. Slide 159: Endeavour Controls the Full 125km Stretch Along the Ity Birimian Belt

    ENDEAVOUR CONTROLS THE FULL 125KM STRETCH ALONG THE ITY BIRIMIAN BELT 159

  160. Slide 160: Endeavour Has the Largest Foothold on the Houndé Belt

    ENDEAVOUR HAS THE LARGEST FOOTHOLD ON THE HOUNDÉ BELT 160

  161. Slide 161: Africa Hosts a Large Portion of the Global Gold Project Development Pipeline

    PRODUCTION FOR THE REGION GOLD PROJECT M&I RESOURCES In millions of ounces, inclusive of Reserves AFRICA HOSTS A LARGE PORTION OF THE GLOBAL GOLD PROJECT 50Moz DEVELOPMENT PIPELINE Over a third of the 26 active gold 34Moz development projects with resources over 1Moz are located in Africa. 19Moz 28

  162. Slide 162: Gold Project Constructions

    PRODUCTION GOLD PROJECT CONSTRUCTIONS Based on 44 primary gold projects built since 2010 Project built on time & schedule Project missed budget or schedule WEST AFRICAN Latin America 7 projects 3.0 yrs PROJECTS ARE BUILT QUICKER, ON-TIME North America 10 projects 2.3 yrs AND ON-BUDGET Asia-Pacific 5

  163. Slide 163: West African Projects Have Low Capital Intensity

    PRODUCTION FOR THE REGION GOLD PROJECT CAPITAL INTENSITY Capital intensity calculated as development capital costs divided by M&I Resource as per the feasibility study $168/oz WEST AFRICAN PROJECTS HAVE LOW $141/oz $142/oz CAPITAL INTENSITY $125/oz West African projects have the lowest $103/oz capit

  164. Slide 164: Favourable Mining Jurisdictions

    PRODUCTION WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU) FAVOURABLE MINING JURISDICTIONS Stable mining code and a well-balanced profit-sharing framework to encourage investment into the mining sector. WAEMU has adopted standardised tax principles across member countries, creating consistency that

  165. Slide 165: Enhanced Security Platform Due to Scale in the Region

    REGION’S PRODUCTION GROWTH ENHANCED SECURITY PLATFORM DUE TO SCALE IN THE REGION › Security unit structured as a business unit, led by ex-French military › Air strips on sites to avoid use of roads and improve operating efficiencies › Significant foreign aid and co- operation amongst West African na

  166. Slide 166: Unmatched Competitive Advantage

    UNMATCHED COMPETITIVE ADVANTAGE Dominant presence in the world’s largest producing region STRATEGIC SUPERIOR MANAGEMENT POSITIONING OPERATING MODEL TRACK RECORD Largest producer in each country In country and regional synergies Discovered 11.5Moz of Indicated resources where we operate at <$25/oz ov

  167. Slide 167: Appendix

    APPENDIX FT / 2) Es y

  168. Slide 168: Appendix 1: Management, Board & Corporate Structure

    01 APPENDIX 1 Management, Board & Corporate Structure

  169. Slide 169: Executive Management Team

    EXECUTIVE MANAGEMENT TEAM Sébastien de Montessus Mark Morcombe Guy Young David Dragone Djaria Traore President & CEO COO CFO EVP HR & Comms EVP ESG & Supply Chain • Joined in 2019 • Joined in 2023 • Joined in 2023 • Joined Endeavour in 2019 • Joined in 2016 • 20+ years in HR with expertise in • Has

  170. Slide 170: Board Members

    BOARD MEMBERS Srinivasan Venkatakrishnan Ian Cockerill (SID) Alison Baker Livia Mahler Sébastien de Montessus Chair and Independent Senior Independent Independent Independent Executive Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Tertius Zongo Sakhila M

  171. Slide 171: Corporate Structure

    CORPORATE STRUCTURE Guarantor of $500m senior notes and $645m RCF issued by Endeavour Mining PLC Issuer Endeavour Mining plc (UK) Guarantor of XOF 100.5B1 term loan issued by Operating Entity 100% Lafigue Holdings UK Limited Endeavour Mining Corporation (Cayman) Holding Company 100% Endeavour Gold C

  172. Slide 172: Appendix 2: Mine Statistics

    02 APPENDIX 2 Mine statistics

  173. Slide 173: Mine Statistics (Quarterly)

    MINE STATISTICS On a quarterly basis (1) Includes waste capitalized. 173

  174. Slide 174: Mine Statistics (Half Year)

    MINE STATISTICS On a half year basis (1) Includes waste capitalized. 174

  175. Slide 175: Appendix 3: Reserves and Resources, 5-year exploration target

    03 APPENDIX 3 Reserves and Resources, 5-year exploration target

  176. Slide 176: Reserves and Resources

    RESERVES AND RESOURCES As of 31 December 2022, on a 100% Basis Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content inclusive of Reserves (Mt) (Au g/t) (Au koz) inclusive of Reserves (Mt) (Au g/t) (Au

  177. Slide 177: Notes to Reserves and Resources

    NOTES TO RESERVES AND RESOURCES As of 31 December 2022 177

  178. Slide 178: Exploration Methodology and Strategy

    EXPLORATON METHODOLOGY AND STRATEGY Selection, ranking and risk evaluation of exploration targets Endeavour’s large land position (more than 17,000 sq Km) and comprehensive database over a very large number of exploration targets promotes the application of a general portfolio management theory wher

  179. Slide 179: Contact Us

    CORPORATE OFFICE 5 Young Street, London W8 5EH, United Kingdom T: +44 203 011 2723 OPERATIONS OFFICE Abidjan Office, Route du Lycée Technique, Abidjan, 08 BP 872 Abidjan 08, Côte d’Ivoire T: +225 27 22 48 99 00 CONTACT US investor@endeavourmining.com Follow us: TSX.EDV endeavourmining.com LSE.EDV 17