Westwater Resources, Inc. · AMEX:WWR
Westwater Resources — Investor Presentation (September 2025)
14 slides from Westwater Resources's investor presentation, Sep 9, 2025
Slide 1: America's Source for Battery-Ready Graphite
1 | westwaterresources.net | NYSE: American – WWR America’s Source for Battery-Ready Graphite NYSE American: WWR
Slide 2: Cautionary Statement
2 Cautionary Statement NYSE American: WWR Corporate Presentation September 2025 This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are subject to risks, uncertainties and assumptions and are ide
Slide 3: America's Source for Battery-Ready Graphite
3 America’s Source for Battery-Ready Graphite NYSE American: WWR Corporate Presentation September 2025 Positioned to become the 1 st US-based producer of battery-grade natural graphite Strategically located in the U.S. Battery Corridor, near major EV and battery hubs Corporate Headquarters Centennia
Slide 4: Value-Driving Differentiators
4 Value-Driving Differentiators NYSE American: WWR Corporate Presentation September 2025 4 Domestic, First-Mover Advantage On-track to be one of the first commercial producers of battery-grade graphite in America Strategically Located Facilities are in the heart of the U.S. Battery Corridor, positio
Slide 5: Optimal Timing for U.S.-Based Battery-Grade Natural Graphite Production
Optimal Timing for U.S. - Based Battery-Grade Natural Graphite Production China 93% Other 7% Source: 1 Benchmark Minerals 2025 estimate as of August 2023. 2 International Energy Agency. Global Critical Minerals Outlook 2024. Uncoated Spherical Graphite Global Supply1 3.8 4.3 9.1 13.5 3.9 4.6 10.4 16
Slide 6: Graphite is a Critical Mineral Used in Multiple Battery Applications
6 Graphite is a Critical Mineral Used in Multiple Battery Applications NYSE American: WWR Corporate Presentation September 2025 6 Graphite: 50% Nickel: 30% Cobalt: 8% Manganese: 8% Lithium: 4% Graphite anode composes ~50% of a lithium-ion battery by weight & EVs contain an estimated 200 pounds of co
Slide 7: Strategically Located in the U.S. Battery Corridor in Central Alabama
7 | westwaterresources.net | NYSE: American – WWR 7 Strategically Located in the U.S. Battery Corridor in Central Alabama NYSE American: WWR Corporate Presentation September 2025 7 Coosa Graphite Deposit Kellyton Graphite Plant Montgomery Birmingham Port of Mobile Alabama
Slide 8: Kellyton Graphite Processing Plant De-Risked via Phased Development Approach
8 Kellyton Graphite Processing Plant De-Risked via Phased Development Approach Under construction with ~$124 million of the expected $245 million in development spent to date Phase 1 includes 12,500 mtpa planned capacity of battery-grade natural graphite production; Phase 2 planned capacity to a tot
Slide 9: Kellyton Construction Progress
9 July 2025 Commercial Milling & Shaping; Dust Collection Complete November 2023 Placing Structural Steel August 2025 >1mt Battery-Grade Graphite Samples Processing July 2022 Earthworks Complete August / September 2022 Foundations Poured & Underground Utilities Complete October 2022 Vertical Constru
Slide 10: Production of Battery-Grade Natural Graphite – Process Flowsheet
10 Production of Battery-Grade Natural Graphite – Process Flowsheet NYSE American: WWR Corporate Presentation September 2025 10 Mining Flotation Micronization (Milling / Sizing) Spheroidization (Shaping) Purification Surface Treatment (Coating) Graphite Mine Graphite Processing Plant
Slide 11: Coosa Deposit (2028+) Offers Opportunity for Complete Vertical Integration
NYSE American: WWR Corporate Presentation September 2025 11 Largest graphite deposit in the contiguous United States located in the graphite belt, 30 miles from Kellyton Plant ~42,000 acres of mineral rights; 234 drill holes completed to date, representing less than 10% of the acreage Exploration to
Slide 12: Key Company and Project Catalysts
12 Key Company and Project Catalysts NYSE American: WWR Corporate Presentation September 2025 12 Close $150M Financing Complete Kellyton Phase 1 Construction First Production Kellyton Phase 1 Commercial Production Kellyton Phase 1 Near – Term (Next 12 – 24 Months) Longer –Term Coosa Advancement to P
Slide 13: Value-Driving Differentiators
13 Value-Driving Differentiators NYSE American: WWR Corporate Presentation September 2025 13 Domestic, First-Mover Advantage On-track to be one of the first commercial producers of battery-grade graphite in America Strategically Located Facilities are in the heart of the U.S. Battery Corridor, posit
Slide 14: Westwater Resources Corporate Headquarters
14 | westwaterresources.net | NYSE: American – WWR Westwater Resources Corporate Headquarters 6950 South Potomac St. Suite 300 Centennial, Colorado 80112 NYSE American: WWR InvestorRelations@WestwaterResources.net Kellyton Graphite Processing Plant 349 McClellan Industrial Drive Kellyton, Alabama 35
Westwater Resources — Investor Presentation (September 2025) on 6ix