Westwater Resources, Inc. · AMEX:WWR
Westwater Resources — H.C. Wainwright 28th Annual Global Investment Conference 2026
17 slides from Westwater Resources's conference presentation, Sep 14, 2026
Slide 1: America's Source for Battery-Grade Graphite
America’s Source for Battery-Grade Graphite NYSE American: WWR September 2026 1 | westwaterresources.net | NYSE: American – WWR
Slide 2: Cautionary Statement
Cautionary Statement This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are subject to risks, uncertainties and assumptions and are identified by words such as “positioned to become,” “strategic
Slide 3: America's Source for Battery-Grade Graphite
America’s Source for Battery-Grade Graphite Positioned to become the 1st US-based Corporate Headquarters Centennial, Colorado, producer of battery-grade USA Kellyton Graphite Plant natural graphite Kellyton, Alabama, USA Coosa Graphite Deposit Coosa County, Alabama USA Strategically located in the U
Slide 4: Westwater's Value Proposition
Westwater’s Value Proposition Strategic Mine-to-Market Phased Right Experienced Location Model Development Timing Leadership Located in Alabama, Connecting domestic Phased plant Advancing capacity in a Leadership and Board U.S.A., in the heart of the resource development development aligns market wi
Slide 5: Graphite is a Critical Mineral Used in Multiple Battery Applications
Graphite is a Critical Mineral Used in Multiple Battery Applications Lithium-Ion Battery Composition Natural Graphite Demand Drivers Lithium 4% Manganese 8% Electric Vehicles Cobalt 8% Cathode Graphite (Li, Ni, Co, Mn) Anode ~50% Battery Energy Storage Nickel 30% Industrial, Defense & Other 5 5
Slide 6: Battery Demand is Driving Structural Growth in Graphite
Battery Demand is Driving Structural Growth in Graphite Flake Battery Demand by Application (kt)1 3281 3170 3046 EV BESS Other Portables 2793 2557 2214 1968 1722 1581 1347 1083 1202 925 1009 794 671 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 1 Source: Benchmark M
Slide 7: The U.S. Imports 100% of Battery-Grade Natural Graphite
The U.S. Imports 100% of Battery-Grade Natural Graphite Natural Graphite AAM Supply1 2.3% 0.9% 1.3% 7.1% 21.0% 16.2% 2025 2035 77.6% 100% 73.4% CHINESE Asia (ex-China) North America Europe Others China 1 Source: Benchmark Commodities Update: Graphite. 2026. 7
Slide 8: Strategic Location: In the Heart of the U.S. Battery Corridor
Strategic Location: In the Heart of the U.S. Battery Corridor Birmingham Kellyton Coosa Graphite Graphite Deposit Plant Montgomery Alabama Port of Mobile 8 8
Slide 9: Mine-to-Market Model: Vertical Integration that Delivers
Mine-to-Market Model: Vertical Integration that Delivers Mining Processing End Product Coosa Graphite Mine 30 Miles Kellyton Graphite Plant Battery-Grade Natural Graphite Mining and flotation of natural Milling, sizing, shaping and Battery-grade CSPG used in lithium- graphite purification produces c
Slide 10: Kellyton Graphite Plant Offers Domestic Processing Capabilities
Kellyton Graphite Plant Offers Domestic Processing Capabilities Under construction with more than 50% of $245 million capital cost invested to date; $25 million EXIM loan approved Phase 1 expected to deliver 12,500mtpa battery-grade natural graphite; Phase 2 will increase planned capacity to a total
Slide 11: Export-Import Bank of the U.S. Approves $25 Million Direct Loan for Kellyton
Export-Import Bank of the U.S. Approves $25 Million Direct Loan for Kellyton President Trump Announces Approval Federal Support for Kellyton August 7, 2026 $25 million EXIM direct loan approved to advance Kellyton Federal validation of Kellyton’s strategic importance Non-dilutive capital supports th
Slide 12: Coosa Graphite Deposit to Provide Long-term, Domestic Feedstock for Kellyton
Coosa Graphite Deposit to Provide Long-term, Domestic Feedstock for Kellyton Largest, most-advanced graphite deposit in the contiguous United States; located 30 miles from Kellyton Graphite Plant ~42,000 acres of mineral rights; 234 drill holes completed to date, representing less than 10% of the ac
Slide 13: Permitting Progress at Coosa: Production Expected Late 2028 / Early 2029
Permitting Progress at Coosa: Production Expected Late 2028 / Early 2029 Permitting Timeline Under Federal FAST-41 Program1 2026 Key Permits Filed U.S. Army September 2026 Corps of Engineers Alabama Department of Environmental Management 1 Source: Federal Permitting Dashboard, Coosa Graphite Deposit
Slide 14: Westwater Catalysts
Westwater Catalysts Near – Term Longer – Term (12+ Months) Coosa Permitting & Mine Design Coosa Advancement to Production Underway Secure Kellyton Phase 1 Offtake Secure Kellyton Phase 2 Offtakes Complete Kellyton Phase I Financing Secure Kellyton Phase 2 Financing Kellyton Phase 2 Construction & Co
Slide 15: Westwater's Value Proposition
Westwater’s Value Proposition Strategic Mine-to-Market Phased Right Experienced Location Model Development Timing Leadership Located in Alabama, Connecting domestic Phased plant Advancing capacity in a Leadership and Board U.S.A., in the heart of the resource development development aligns market wi
Slide 16: Financial Overview
Financial Overview NYSE American: WWR Kellyton Kellyton Coosa Initial Shares O/S1 Cash2 Phase 1 Feasibility Phase II Feasibility Assessment 128.6M $38.2M Study (2023) Study (2024) (2023) Market Cap Avg. Annual Production 12,500 mtpa CSPG3 37,500 mtpa CSPG 3,333 st (Cg conc.) $482M – $49M $152M Devel
Slide 17: With growing federal support for secure, domestic critical mineral supply chains
Westwater Resources Corporate Headquarters 7000 East Belleview Ave. Suite 220 Greenwood Village, CO With growing federal 80111 support for secure, domestic critical mineral Kellyton Graphite Processing Plant supply chains, 349 McClellan Industrial Westwater Resources is Drive Kellyton, Alabama posit
Westwater Resources — H.C. Wainwright 28th Annual Global Investment Conference 2026 on 6ix