Accent Resources Nl · ASX:ACS
Accent Resources Nl — Shareholder Meeting (November 2012)
15 slides from Accent Resources Nl's shareholder meeting presentation, Nov 29, 2012
Slide 1: Accent Resources NL Annual General Meeting
For personal use only ACCENT RESOURCES NL Annual General Meetingg 29 November 2012
Slide 2: Important notice and JORC compliance
Important notice and JORC compliance • This presentation has been prepared and issued by Accent Resources NL (“ACS”) ( ACS ) with the objective of providing information to interested parties about ACS. This presentation should not be considered as an offer or invitation to subscribe for or purchase
Slide 3: Corporate Profile
Corporate Profile For personal use only ASX Code – ACS (Listing Date August 2005) Top 10 Shareholders @ 30/9/2012 No. %. Xingang Resources (HK) Limited 98,026,518 54.16% Ordinary Fully Paid Shares @ 30/9/2012 181,000,233 Rich Mark Development (Group) Pty Ltd 28 218 366 28,218,366 15 59% 15.59% Marke
Slide 4: Accent Profile
Accent Profile - ASX listed advanced stage iron exploration company. For personal use only - Conducting iron, vanadium and gold exploration and development in Western Australia. Australia - Projects are strategically located within close proximity to existing and planned infrastructure. - Xingang Re
Slide 5: Magnetite Range – Status
Magnetite Range – Status • Scoping Study underway For personal use only •Updated JORC resource - 434.5Mt @ 31.4%Fe with favourable DTR 67.4%Fe 67 4%Fe and 36% Mass Recovery - >70% Indicated resource, +21,800m drilling - Thick BIF, high +40% Mass Recovery in south adjacent to Extension Hill •188m @ 3
Slide 6: Katanning Exploration
Katanning Exploration For personal use only Mine Hill Red Hill Linda Sue • Large tenement holding, 80km strike. Titano vanadium magnetite outcrops • 104 shallow RC and 6 diamond holes completed, promising vanadium intersections • Diamond drilling intersected massive titanomagnetite in gabbro • Drill
Slide 7: Mine Hill Prospect
Mine Hill Prospect For personal use only Python Hill & Mine Hill Hole 10KTD001: Massive titanomagnetite in metagabbro – 20m @ 0.5% V2O5 from 94 to 110m 10KTD001 Drill Site Includes 16m @ 0.56% V2O5 • 12KTR091 and 092: - 8m @ 0.42 and 0.4% V2O5 • Follow up required
Slide 8: Red Hill Prospect
Red Hill Prospect For personal use only Red Hill • Titano Tit vanadium di magnetite tit outcrops t • Diamond drilling intersected massive titanomagnetite in metagabbro • Hole 10KTD005: 8m @ 0.71% V2O5 from 79 to 87m 16m @ 0.46% V2O5 from 94 to 110m 9m @ 0.38% V2O5 from 117 to 126m Ti V Magnetite Out
Slide 9: Linda Sue Prospect
Linda Sue Prospect For personal use only Hole K4 – 5m @ 0.36% V2O5 • Anomalous V2O5 geochemistry & Ti V magnetite outcrop • Anomalous magnetic gabbro intersected • K4 - 5m @ 0.36% V2O5 • 11KTR084 - 8m @ 0.32% V2O5 • 11KTR082 - 12m @ 00.41% 41% V2O5 • 11KTR081 - 12m @ 0.22% V2O5 • Follow up required
Slide 10: Gold Projects
Gold Projects • Arcadia Project – Air core For personal use only drilling successfully extended mineralized Hope River shear. Requires follow up RC drilling • Norseman Project j – Existingg gold resources. Completed detailed review, revised resource estimation and pit optimisation studies. Deeper po
Slide 11: Arcadia Gold Project
Arcadia Gold Project For personal use only • Air core drilling extended mineralized Hope p River shear north of Hope River prospect by 1.25km • Anomalous AC intersections • 8m @ 0.57 g/t Au (End of Hole) • 12m @ 0.32 g/t Au • 8m @ 0.22 g/t Au • 8m @ 0.15 g/t Au • 4m @ 0.41 g/t Au • Requires RC drill
Slide 12: Norseman Regional
Norseman Regional For personal use only 1o50’E Legend 121 Jimberlana Dyke Granite Mt Kirk Formation 32o10’S Woolyeenyer Formation Norseman (2.2M ozs) Noganyer Formation (Mined 5M ozs) Surprise (ACS) Penneshaw Formation (22,800 ozs) Fault Iron Duke (ACS) Anticline, interpreted (45,700 ozs) 32o20’S Ma
Slide 13: Norseman Gold Project
Norseman Gold Project • Heavily gold mineralized project area - gold resources For personal use only at Surprise and Iron Duke • Anomalous Fe Assays y in Banded Iron Formation • Acquired Lady Mary mine tenements • Completed p detailed review,, updated p resource estimation and pit optimisation study
Slide 14: Norseman Gold Project - Resource Estimation
Norseman Gold Project - Resource Estimation • Revised JORC compliant resource estimate up to 68,500 Ounces at 1.5 g/t Au (0.5 g/t Au cut off) For personal use only Total Resource Cut off (g/t Au) Deposit Tonnes Grade (g/t Au) Ounces 0.5 0 5 IIron Duke D k 850,000 850 000 1.7 1 7 45,700 45 700 0.5 Su
Slide 15: Norseman Gold Project
Norseman Gold Project • Open pit optimisation study indicates For personal use only mineable inventory of 0.85 Mt at 1.62 g/t Au for 41,800 recovered ounces • Represents significant proportion of total JORC resource • Profitable overall cash flow up p to A$22mill using base case parameters S Surpris
Accent Resources NL — Shareholder Meeting (November 2012) on 6ix