Slide 2: Legal Disclaimer
Legal Disclaimer This presentation may contain statements about future events and Energy Transfer Partners, L.P.’s (“Energy Transfer”, the “Partnership” or “ETP”) outlook and expectations, which are forward-looking statements. Any statement in this presentation that is not a historical fact may be d

Slide 3: Agenda
Agenda Recent Developments/ Asset Update Texas Natural Gas Supply/ Demand Internal Growth Financial Review 3

Slide 4: Recent Developments/Asset Update
Recent Developments/Asset Update

Slide 5: Houston Pipeline Acquisition
Houston Pipeline Acquisition 4,200 miles of intrastate natural gas gathering and transmission pipeline 2.4 Bcf/d capacity 170 MMcf/d treating facilities Processing and compression by third parties Storage – One of the largest reservoir storage facilities in Texas – 130 Bcf capacity 64.5

Slide 6: Houston Pipeline System
Houston Pipeline System Seasonality – Winter months better than summer – Counters ET Fuel Utility contract – Out of market rates – Roles off in early 2007 Compression/Measurement contract – High costs – Roles off in early 2007 Oasis synergies – Creating additional Oasis capacity 6

Slide 7: Elk City Sale
Elk City Sale Purchase Price -- $190 million – 100% Cash > 10x LTM EBITDA Use of Proceeds – Debt Pay down from HPL Acquisition Increased Focus on Core Assets Increases overall fee-based cash flow – Most volatile ETP business segment Effective Alternative to Equity Issuance Closing upon

Slide 8: Propane
Propane 8

Slide 9: Propane
Propane Trends – Warm weather – Increased gross margins – Increased cost of tanks, vehicles and propane Acquisitions – Bifurcated purchase multiples – Fiscal 2006 (full 12 months activity for purchases in FY 2005) – Gallons = 10.6 million – EBITDA projection = $2 million – Purchase multiple = 5.

Slide 10: Other Assets
Other Assets ET Fuel (TUFCO) – FW Basin expansions – Measurement improvements SETPS – Increasing volumes Bossier/ East Texas – Bullish producer estimates/ activity require expansions – Approaching current capacity Additional compression to be installed – Lower Bossier trend Recently instal

Slide 11: Texas Natural Gas Supply/Demand
Texas Natural Gas Supply/Demand

Slide 12: Texas Natural Gas Supply
= Texas Natural Gas Supply Major Producing Areas —__ fa State of Texas fr if vt: 8 i ‘ 7 Westbury rf rh C/A sotanae ~ eer eereameicaes: ‘ 0 50 Miles

Slide 13: Supply/ Demand
Supply/ Demand Major Producing Areas State of Texas |———_— -clsten Sm ator_bans Zr 0 50 Miles

Slide 14: Competitive Advantages
Competitive Advantages 14

Slide 15: LNG
LNG 15

Slide 16: ETP LNG Takeaway Capabilities
ETP LNG Takeaway Capabilities 16

Slide 17: Internal Growth
Internal Growth

Slide 18: Fort Worth Basin Expansion
Fort Worth Basin Expansion 54 miles of 24-inch pipeline Conversion of NGL pipeline Completion May 1, 2005 Cap Ex = $53 million 18

Slide 19: North Ft. Worth Basin Loop
North Ft. Worth Basin Loop ETP and ATMOS 30-inch, 45 mile North Ft. Worth Loop Capacity of 500 MMcf/d Expected completion by December 2005 Outlet for Barnett Shale to multiple hubs Anticipated cost = $55 million 19

Slide 20: Bethel Storage Expansion
Bethel Storage Expansion Expansion of the injection capacity of Energy Transfer’s Bethel salt dome storage facility Capex: $12m in 2005 Proposed installation of additional 9,000 HP of compression will increase injection capability at Bethel from 75 MMcf/d to 175 MMcf/d Bethel Storage 20

Slide 21: Bossier to Bethel Pipeline Expansion
Bossier to Bethel Pipeline Expansion Will connect Bethel Salt Dome Storage Facility (part of TUFCO system) with the recently constructed Bossier Pipeline 39 miles Adds direct access to Katy hub from Bethel – Increases the value of the Bethel storage capacity 21

Slide 22: Bethel to Texoma Pipeline
Bethel to Texoma Pipeline Approximately 70 miles of 30-36” pipeline Connecting ETP’s Bethel storage facility with the ETP Texoma Pipeline in East Texas 22

Slide 23: Oletha to Cleburne Pipeline
Oletha to Cleburne Pipeline Approximately 80 miles of large diameter pipeline to provide additional takeaway capacity for FW Basin production Will provide outlet for south FW Basin trend 23

Slide 24: Freeport to Iowa Colony
Freeport to Iowa Colony 32 miles of 36-42” pipeline Provides additional takeaway capacity for LNG imports 24

Slide 25: Financial Review
Financial Review

Slide 26: Pro Forma Balance Sheet
Pro Forma Balance Sheet Energy Transfer Partners, L.P. Pro Forma Balance Sheet Reflecting The Monetization Of Elk City Pro Forma February 28 Pro Forma February 28 Assets 2005 Adjustments 2005 Current Assets $994,506 $190,000 a -$190,000 b Total Current Assets $994,506 $0 $994,506 Property Plant and

Slide 27: Interest Expense
Interest Expense Energy Transfer Partners, L.P. Forecasted Debt And Interest (000's) Fiscal 2006 Principal Rate Interest 5.95% Notes $750,000 5.95% $44,625 Revolvers $600,000 5.25% $31,500 Private Placements $280,000 8.40% $23,520 Other Misc. $15,000 7.00% $1,050 Debt Reduction - Elk City Sale -$190

Slide 28: Partnership Units
Partnership Units Energy Transfer Partners, L.P. Outstanding Partnership Units As Of April 5, 2005 1) Common Units Energy Tranfer Company, L.P. (Formerly La Grange Energy) 31,766,468 Public 70,478,104 Total Common Units Receiving Quarterly Distributions 102,244,572 2) Class E Units Heritage Holdings

Slide 29: Capital Expenditures
Capital Expenditures Energy Transfer Partners, L.P. Maintenance and Growth Capital Expenditures Fiscal Year 2005 First Second Third Fourth Fiscal Quarter (a) Quarter (a) Quarter (e) Quarter (e) Year Maintenance Midstream and Transportation Well connects $2,100 $1,732 $1,000 $825 $5,657 Pipeline Main

Slide 30: DCF Coverage
DCF Coverage Energy Transfer Partners, L.P. Forecasted Common Unit Coverage Based On Historical And Projected Results Fiscal Year 2006 2006 First Second Third Fourth Fiscal Quarter (e) Quarter (e) Quarter (e) Quarter (e) Year EBITDA Midstream/Transportation $63,174 $122,645 $85,692 $78,488 $350,000

Slide 31: Investment Highlights
Investment Highlights Successful acquisition track record Significant internal growth projects at attractive multiples Healthy common unit coverage Strong balance sheet positioned for internal growth and acquisitions Management philosophy to minimize common unit dilution by reinvesting dis
Source: Internet Archive copy of energytransfer.com
More decks from Energy Transfer LP
Q3 2026 Earnings Presentation20 slides · Nov 3, 2026
Investor Presentation (November 2026)31 slides · November 2026
Investor Presentation (September 2026)29 slides · September 2026
Q2 2026 Earnings Presentation19 slides · Aug 4, 2026
Investor Presentation (August 2026)29 slides · August 2026
Investor Presentation (August 2026)29 slides · August 2026