22 slides from Predictive Discovery's shareholder meeting presentation, Nov 29, 2011
Slide 1: Predictive Discovery Limited AGM Presentation
For personal use only PREDICTIVE DISCOVERY LIMITED AGM Presentation – 29 November 2011 1
Slide 2: Disclaimer/Competent Person Statement
For personal use only Disclaimer/Competent Person Statement Disclaimer This presentation contains only a brief overview of Predictive Discovery Ltd and its associated entities (“PD or Predictive") and their respective activities. The contents of this presentation, including matters relating to the g
Slide 3: Highlights
Highlights For personal use only Oversubscribed IPO raised $8M in December 2010 In PDI’s first field season, intense activity completed in Burkina Faso including: 9 over 40,000m of RC and power auger drilling 9 extensive aeromagnetic and geological surveys RC drilling revealed: 9 ore grade and wi
Slide 4: Corporate Structure
Corporate Structure Board of Directors Major Shareholders For personal use only Phil Harman Non-Executive Acorn Capital 12.7% Chairman Lowell Resources 6.0% Paul Roberts Managing Director Fund Tom Whiting Non-Executive Director Black Fire Minerals 3.5% Bobby Danchin Non-Executive Director Paul Rober
Slide 5: Project Locations
Project Locations For personal use only Burkina Faso ELDore JV , options, PD permits Benmara JV NT Skipton EL Vic 5
Slide 6: Burkina Faso Projects
Burkina Faso Projects For personal use only 6
Slide 7: Bonsiega Project
Bonsiega Project >16km power auger gold anomalies on structures For personal use only 0 2,500m 7
Slide 8: Bonsiega Project: Dave & Dave East Prospects RC Drill Results
Bonsiega Project Dave & Dave East Prospects – RC Drill Results For personal use only 2km strike Cross-section length tested Open in all directions Oxide to 60m depth Mineralisation on all lines Broad intercepts: • 26m @ 2.7g/t Au • 46m @ 1.4g/t Au • 14m @ 3.7g/t Au • 16m @ 1.7g/t Au • 18m
Slide 9: Bonsiega Project: Strong Mineralisation on Easternmost RC Line
Bonsiega Project Strong Mineralisation on Easternmost RC Line For personal use only 9
Slide 10: Bonsiega Project: >16km of similar anomalies
Bonsiega Project >16km of similar anomalies – 2km drill tested For personal use only 10km of Dave-Dave East untested 0.4g/t Au in structure weathered beneath bedrock damp alluvium Legend Interface samples Au ppb 10
Slide 11: Burkina Faso Projects - Bangaba
Burkina Faso Projects - Bangaba For personal use only 11
Slide 12: Bangaba Project
Bangaba Project (PDI at 51% earning 95%) For personal use only 27 years of artisanal mining 4,000 people at Solna artisanal site 10-15kg gold per month being produced Workings to 90m depth in places >20km of shear zone Past exploration focused on Solna and Tambiri 12
Slide 13: Bangaba Project: Tambiri Prospect
Bangaba Project Tambiri Prospect For personal use only Historic Tambiri drilling intersected high grade gold: • SEBT96-01: 5m @ 16.4g/t Au • SEBT96-17: 16m @ 10.6g/t Au • SEBT96-02: 2m @ 56.1g/t Au • SEBT96-11: 2m @9.9g/t Au PDI drilling tested 320m of strike (open to S and N) 13
Slide 14: Bangaba Project: Tambiri Drilling Results
Bangaba Project Tambiri Drilling Results For personal use only Cross-section 14
Slide 15: Bangaba Project: Tambiri Drilling Cross Section
Bangaba Project Tambiri Drilling Cross Section For personal use only 15
Slide 16: Bangaba Project: Solna Prospect - Drilling
Bangaba Project Solna Prospect - Drilling For personal use only Gold in shallow dipping veins within a steeply dipping (?) shear zone – stacked veins(?) Average of 7 intercepts – 5m at 7g/t Au (uncut) Average vertical depth to intercept 89m 16
Slide 17: Bangaba Project: New magnetics identifies new structures
Bangaba Project New magnetics identifies new structures For personal use only New magnetics shows new geological detail Tambiri Structures correlate with existing workings & show potential along strike PredictoreTM being applied to Solna identify high priority drill target areas Power auger
Slide 18: Predictore application, Burkina
PredictoreTM application, Burkina For personal use only 2 scales – terrane and drill target Drill target scale: 2 steps – validate against known deposit and then predict Use of geophysics and good geology mapping essential 18
Slide 19: Australia
Australia For personal use only Low key relative to Burkina Faso Geological mapping (Benmara) and geophysical surveys on both areas Application of PredictoreTM to Benmara in preparation for drilling Post-June 30, 2011: 9 RC-diamond drilling program at Benmara in October (results awaited) 19
Slide 20: Aggressive Exploration Program
Aggressive Exploration Program For personal use only 20
Slide 21: Highlights
Highlights For personal use only Oversubscribed IPO raised $8M in December 2010 In PDI’s first field season, intense activity completed in Burkina Faso including: 9 over 40,000m of RC and power auger drilling 9 extensive aeromagnetic and geological surveys RC drilling revealed: 9 ore grade and wi
Slide 22: Contact Details
For personal use only Contact Details: Level 2, 9 Colin St, West Perth, WA 6005 Telephone: +61 402 857 249 Email: paul.roberts@predictivediscovery.com Website: www.predictivediscovery.com 22