Delta Resources Limited · TSXV:DLTA

Delta Resources — Investor Presentation (March 2026)

28 slides from Delta Resources's investor presentation, Mar 26, 2026

  1. Slide 1: Advanced Exploration in Canada's Next Emerging Gold Camp

    ADVANCED EXPLORATION IN CANADA’S NEXT EMERGING GOLD CAMP Delta-1 Gold Project Thunder Bay, Ontario Canada Corporate Presentation – Q2 2026 TSX-V : DLTA | FRANKFURT : G6O1 | OTC Pink : DTARF 1

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Certain information contained or incorporated by reference in this presentation, including any information as to our future financial or operating performance, constitutes "forward-looking statements". All statements, other than statements of historical fact, are forward-lo

  3. Slide 3: Investment Highlights

    Investment Highlights 1 Eureka Gold Discovery Significant gold discovery in October 2022, with approximately 48,107 metres of drilling completed as of February 2026. Exploration is ongoing. 2 Excellent Location Top-tier location just 50 km west of Thunder Bay, an established mining hub in Northern O

  4. Slide 4: Emerging Gold Camp

    Emerging Gold Camp Shebandowan Greenstone Belt > 10 Moz : Delta has a significant gold discovery + blue sky potential Agnico Eagle Mines Hammond Reef Deposit SHEBANDOWAN 3.3 Moz Au Probable @ 0.84 g/t GREENSTONE BELT 0.82 Moz Au Measured @ 0.54 g/t Delta Resources Ltd. 1.5 Moz Au Indicated @ 0.53 g/

  5. Slide 5: Majors Now Investing In Thunder Bay Area

    Majors Now Investing In Thunder Bay Area . . . . . . . Gold X2-Moss Lake Gold Project . . . Delta-1 Gold Project . . . . Hammond Reef Gold Project . . . . . Tower Mountain Gold Project 5 TSX-V : DLTA | FRANKFURT : G6O1 | OTC Pink : DTARF | LEAVING NO STONE UNTURNED

  6. Slide 6: Alignment With Shareholders and Strong Fundamentals

    Alignment With Shareholders and Strong Fundamentals  Strong insider / Board ownership: CEO Ron Kopas, largest single shareholder of Delta  CEO works for $1/year  Low corporate burn rate, disciplined spending - capital focused on exploration  Delta-2 Québec Property: Under option agreement to Tro

  7. Slide 7: Stock Information

    Stock Information Strong insider ownership ensures Capitalization Table – March 2026 full alignment with shareholders Fully Value Upon Basic Diluted Exercise and long-term value creation. Common Basic Shares 136.47M Stock Options @ $0.21 Average 10.34M $2.20M Warrants $0.12 – Expiry Date Sept. 24, 2

  8. Slide 8: Project Location & Economic Advantage

    Project Location & Economic Advantage Delta-1 Gold Project Thunder Bay, Ontario: View looking north Powerline Thunder Bay 50 km east Trans-Canada Highway Surface expression of mineralized zone Scale Horizontal: 800 m Vertical: 1 km to  Not environmentally sensitive — no rivers or lakes powerline CN

  9. Slide 9: Eureka Gold Deposit

    Eureka Gold Deposit Drilling: Plan view SHABAQUA TARGET Multiple new gold intercepts Delta Resources Ltd 4.25 g/t Au over 11.8 m Eureka Gold Deposit 1.37 g/t Au over 10.5 m 2.16 g/t Au over 97.5 m 2.40 g/t Au over 4.3 m 2.06 g/t Au over 65.8 m 0.16 g/t Au over 132.0 m 4.23 g/t Au over 26.2 m 15.94 g

  10. Slide 10: Eureka Gold Deposit

    Eureka Gold Deposit Eureka Block Model - Long-Section Looking North West Extension  High-grade core defined Open toward Shabaqua Target (~1 km)  Near-surface starter pit  Early high-grade mining = Fast payback 350 m Selected intercept highlights: • 5.92 g/t Au over 31.0 m (including 14.8 g/t Au o

  11. Slide 11: Delta-1 Property

    DELTA-1 PROPERTY An Expansive Land Position With a Growing Gold Deposit and Exceptional Exploration Upside DELTA-1 PROPERTY 297.4 km² Shebandowan Mine (Inco) NOVA/WEDGE TARGETS ≈7.9 Mt 2.06% Ni, ~1.00% Delta 2019-2025 Very large gold dispersion pattern (till) Cu and ~3.0 g/t of Several anomalous gol

  12. Slide 12: 2026 Exploration Strategy

    2026 EXPLORATION STRATEGY Disciplined Exploration & Value I-Zone / Crayfish Creek Opportunity Creation High-Grade Target Area  Focused exploration across the I-Zone / Crayfish Creek  East-west structural corridor running through the centre of Fault corridor the Delta-1 property  Extensive mapping

  13. Slide 13: I-Zone / Crayfish Sector

    I-Zone / Crayfish Sector Highly prospective target area which hosts multiple high-grade gold occurrences GOLD OCCURRENCES Shebandowan Mine (Inco) Grabs (Inco Gold 1988-1989) 1.03 g/t Au; 1.43 g/t Au; ~7.9 Mt 2.06% Ni, ~1.00% Cu AD Zone and ~3.0 g/t of combined PGE + 1.01 g/t Au Au (produced) Grabs (

  14. Slide 14: A Growing Discovery at the Heart of an Emerging Gold Camp

    A Growing Discovery at the Heart of an Emerging Gold Camp Delta-1 is advancing alongside peers in the Shebandowan Greenstone Belt, with a large, strategically positioned land package that benefits from rising district momentum.  Eureka Gold Deposit  Location advantage  Big-property upside  Distr

  15. Slide 15: In the Middle of It All, Infrastructure That Enables Speed and Cost Efficiency

    In the Middle of It All, Infrastructure That Enables Speed and Cost Efficiency Delta-1’s central land position with its established infrastructure results in a faster, lower-risk path to value as the district de-risks and consolidates.  Central to the  Low barriers to Thunder Bay buildout advancem

  16. Slide 16: Central Position. Clear Runway. Execution-Driven Growth.

    Central Position. Clear Runway. Execution-Driven Growth. A disciplined execution plan, supported by the Delta-2 option structure, keeps Delta advancing while the district matures and consolidates.  No financing since November 18, 2024 further demonstrates the disciplined execution of our plan.  Ex

  17. Slide 17: Leadership Team

    Leadership Team Our team has a strong track record of success and an experienced group of technical professionals RON KOPAS FRANK CANDIDO DR. KEVIN HEATHER SARA PAQUET PRESIDENT & CEO | BA, MBA CHAIRMAN | B.A. GRAD. DIRECTOR | B.SC. (HONS), M.SC., DIRECTOR | BA, MBA DIPLOMA FINANCE PH.D. Mr. Kopas i

  18. Slide 18: Contact

    Contact Ron Kopas, CEO rkopas@deltaresources.ca Frank Candido, Chairman fcandido@deltaresources.ca Corporate Address 36 Lombard Street, Floor 4, Toronto, ON M5C 2X3 +1.514-969-5530 info@deltaresources.ca TSX-V : DLTA | FRANKFURT : G6O1 | OTC Pink : DTARF 18

  19. Slide 19: Appendix

    Appendix Delta-1 Project 19 TSX-V : DLTA | FRANKFURT : G6O1 | OTC Pink : DTARF | LEAVING NO STONE UNTURNED

  20. Slide 20: Property Description, Ownership, and Claim Status

    Property Description, Ownership, and Claim Status Delta-1 Project Delta owns a 100% interest, or holds the exclusive right to earn a 100% interest, in 1,139 claims (1,482 units) and nine patents (surface and mining rights) in the Shebandowan Greenstone Belt. The property covers more than 29,740 hect

  21. Slide 21: Block Model

    Block Model Eureka Gold Deposit: High-Grade Cores Within Broad Lower-Grade Envelope, low cut-off @ $5,000 USD Gold Gold Grades Greater than 1 g/t Gold Only 21 TSX-V : DLTA | FRANKFURT : G6O1 | OTC Pink : DTARF | LEAVING NO STONE UNTURNED

  22. Slide 22: Eureka Gold Deposit

    Eureka Gold Deposit The Eureka Zone at Delta-1: Orogenic-style gold system, Mineralization large-tonnage, low-grade gold deposit hosted in highly altered volcanics, sediments and intrusive rocks. Long-Section Looking North Drill Hole D1-23-30 Stockwork of quartz-ankerite- albite-pyrite veinlets from

  23. Slide 23: Geology

    Geology Delta-1 Project SUMMARY  Property in Shebandowan Greenstone Belt (Wawa Subprovince, Superior Province).  Hosts both Greenwater volcanics and Shebandowan sediments, intruded by plutons & dykes.  Key structural control: Shebandowan Structural Zone & major faults (Crayfish Creek, Postans). 

  24. Slide 24: Project Location & Economic Advantage

    Project Location & Economic Advantage Delta-1 Project  Surrounded by tremendous infrastructure  Just south of the Trans-Canada Highway  The Trans-Canada Highway is in planning to be expanded from 2 to 4 lanes and Delta is already in discussions with the MTO to have the highway moved north from th

  25. Slide 25: A Growing Discovery at the Heart of an Emerging Gold Camp

    A Growing Discovery at the Heart of an Emerging Gold Camp Delta-1 is advancing alongside peers in the Shebandowan Greenstone Belt, with a large, strategically positioned land package that benefits from rising district momentum.  Eureka Gold Deposit: Ongoing drilling continues to deliver mineralized

  26. Slide 26: In the Middle of It All, Infrastructure That Enables Speed and Cost Efficiency

    In the Middle of It All, Infrastructure That Enables Speed and Cost Efficiency Central land position + established infrastructure = a faster, lower-risk path to value as the district de-risks and consolidates.  Central to the Thunder Bay buildout: Positioned among advancing neighbours in the Sheban

  27. Slide 27: Central Position. Clear Runway. Execution-Driven Growth.

    Central Position. Clear Runway. Execution- Driven Growth. A disciplined execution plan, supported by the Delta-2 option structure, keeps Delta advancing while the district matures and consolidates.  Execution + capital discipline: Maintain momentum at Delta-1 while neighbours advance, staying visib

  28. Slide 28: Delta-2 Project

    Delta-2 Project Project overview Delta-2: Chapais-Chibougamau Mining Camp Under Option to Troilus Mining Corp. (TLG:TSX) Delta-2 Option Deal Provides Three Years of Non-Dilutive Funding. Delta Resources has secured a transformative option agreement with Troilus Mining Corp. on the 217.83 km2 propert

Delta Resources — Investor Presentation (March 2026) on 6ix