Delta Resources Limited · TSXV:DLTA
Delta Resources — Investor Presentation (October 2023)
18 slides from Delta Resources's investor presentation, October 2023
Slide 1: Exploration of Very High-Potential Gold and Base-Metal Projects in Canada
DTARF | OTC – 6G01 DLTA | TSX-V Leaving No Stone Unturned. EXPLORATION OF VERY HIGH-POTENTIAL GOLD AND BASE-METAL PROJECTS IN CANADA Corporate Presentation OCTOBER 2023
Slide 2: Disclaimer
Disclaimer Forward Looking Information Certain information contained or incorporated by reference in this presentation, operating or technical difficulties in connection with mining exploration or including any information as to our future financial or operating performance, development activities;
Slide 3: Board of Directors & Management
Board of Directors & Management Andre C. Tessier, Frank Candido Nathalie Laurin P.Eng., P.Geo CHAIRMAN CFO PRESIDENT, CEO B.A., +25 years financial +25 years experience in consultant, specializing in & DIRECTOR the financing of private administration, project management and public early-stage and ac
Slide 4: The Company In A Nutshell
The Company In A Nutshell Numbers at October 31, 2023 12-Month Stock Chart A Canadian Junior Exploring in Canada May 17, 2023 $10M Bought Deal Financing since 2019 $0.60 Trading as DLTA-V 101M Shares $0.50 in Canada Outstanding (also trading on the (Fully diluted 146M) OTC in US as DTARF PDAC 2023 $
Slide 5: Projects
Projects Delta-1 Gold 50 km west of Thunder Bay. Ontario. Delta owns a 100% interest | ~107 km² Delta-2 Gold-Polymetallic 35 km southeast of Chibougamau, Quebec. Delta owns a 100% interest | ~194 km² Bellechasse-Timmins GOLD NSR Delta-NSR Delta owns a 1% NRS Royalty | ~50 km². 2.9MT @ 1.
Slide 6: Delta-1 Location & Access
Delta-1 Location & Access Delta-1 – GOLD PROJECT Thunder Bay, Ontario o 50 km west of Thunder Bay. Ontario. o Straddling the Trans-Canada Highway o Thunder Bay (~120,000 pop) o Delta owns 100% interest | ~107 km² 6 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u
Slide 7: Delta-1 Location & Access
Delta-1 Location & Access Delta-1 – GOLD PROJECT Thunder Bay, Ontario o 50 km west of Thunder Bay. Ontario. o Straddling the Trans-Canada Highway o Thunder Bay (~120,000 pop) o Delta owns 100% interest | ~107 km² 7 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u
Slide 8: Delta-1 Proximity to Infrastructure
Delta-1 Proximity to Infrastructure Delta-1 – GOLD PROJECT Thunder Bay, Ontario o Adjacent to Trans-Canada Highway. o Two existing Power Lines. o Planned Waasigan High-Voltage Transmission Line. 8 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.
Slide 9: Regional Geology
Delta-1 Regional Geology DELTA-1 PROPERTY Thunder bay Mining District, Ontario, CANADA N DELTA-1 PROPERTY Regional Geology Shebandowan DELTA-1 PROPERTY Opawica Gneissic Belt Thunder Bay Lake Superior 5 8 Shebandowan N 6 DELTA-1 PROPERTY SCALE 4 7 0 5 10 15 20 25 1 kilometres 3 LEGEND 2 Massive Grano
Slide 10: Gold Deposit Surface Geology
Delta-1 Gold Deposit Surface Geology DELTA RESOURCES LIMITED DELTA-1 PROPERTY N Geology of the Eureka Gold Zone LEGEND Shebandowan Clastic Sediments (2680-2690 Ma) Conglomerate (Shebandowan Fm) Clastic Sediments (Greenwater 2719-2722ma) Mafic Volcanics Greenwater Fm (2719-2722 Ma) Pillowed Mafic Vol
Slide 11: Gold Zone – Isometric View
Delta-1 Gold Zone – Isometric View 11 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.
Slide 12: Gold Mineralization-3D Model
Delta-1 Gold Mineralization-3D Model Isometric View Looking NNE ~100 m ~250 m Cross-Section Looking East 12 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.
Slide 13: Gold Grades & Long Section
Delta-1 Gold Grades & Long Section Delta-1 Gold Grades Long Section Looking North 13 TSX-V : DLTA | FRANKFURT : G601 | QTCBQB : DTARF | L e a v i ng N o S t o n e U n t u r ned.
Slide 14: Gold Mineralization-Stockwork
Delta-1 Gold Mineralization-Stockwork Drill Hole D1-23-30 Stockwork of quartz-ankerite-albite- pyrite veinlets from drill hole D1-23-30. 2.06 g/t Au over 65.8 m Here the zone is hosted by altered Greenwater basalt. ALTERATION Ankerite-Sericite-Albite-Quartz ~2-3% Disseminated Pyrite 14 TSX-V : DLTA
Slide 15: Gold Mineralization
Delta-1 Gold Mineralization D1-23-33 62.6m V1 asp D1-23-33 16.5m 0.81 g/t Au 3.85 g/t Au V2 V1 asp D1-23-31 36m Various drill-core samples showing 3.4 g/t Au V1 V2 V1 several generations of gold-bearing V2 V1 veinlets within the mineralized zone. Preliminary observations suggest that arsenopyrite-ri
Slide 16: Current and Future Work
Delta-1 Current and Future Work 2023 TO DATE • DRILLING: Completed 60 drill holes for a total of 19,620 metre in 2023 ( total of 86 drill holes for 26,288 metres since 2019). • DISCOVERY: Defined the gold zone over 1.8 km x 10-100 m x 250 m vertical (open in all directions). CURRENT • INDUCED POLARI
Slide 17: Conclusion
Conclusion Delta-1 Project Location Project Timing People Located in a pro-mining ALL THE INGREDIENTS Just completed 20,000 Dedicated team to jurisdiction. FOR A MAJOR ECONOMIC metres drill program with add value for GOLD DEPOSIT. assays pending for 15 shareholders. Immediately adjacent to
Slide 18: Contact us
Contact us André C. Tessier, President & CEO www.deltaresources.ca atessier@deltaresources.ca 1718 Christine Cr, Kingston, On, CANADA, K7L 4V4 Frank Candido, Chairman Tel: 613.328.1581 fcandido@deltaresources.ca
Delta Resources — Investor Presentation (October 2023) on 6ix