Zimplats Holdings Limited · ASX:ZIM

Zimplats — Fact Sheet (January 2024)

8 slides from Zimplats's fact sheet, January 2024

  1. Slide 1: Zimplats Fact Sheet

    Slide 1: Zimplats Fact Sheet

    - Zimplats FACLSHEEF RESPECT, CARE Yowewats AND DELIVER of the Implats Gro

  2. Slide 2: Zimplats is 87% owned by Implats

    Slide 2: Zimplats is 87% owned by Implats

    FACT SHEET Zimplats is 87% owned by Implats. Its Ngezi operation is located on the Hartley Geological Complex on the Zimbabwean Great Dyke approximately 150 kilometres south-west of Harare. The Hartley Geological complex is the largest of the PGM-bearing complexes containing 80% of the known PGM res

  3. Slide 3: Geology

    Slide 3: Geology

    ZIMPLATS Zimplats Regional locality map GEOLOGY 30°40’ E Zimbabwe’s Great Dyke is a layered 17°48’ S complex similar to that of South Africa’s To Har are Bushveld Complex. It extends for Mining Lease 36 550 kilometres and has a maximum (Hartley) TSF TSF width of 11 kilometres. SMC egutu To Ch The Gr

  4. Slide 4: Zimplats estimated 20-year 6E LoM ounce profile

    Slide 4: Zimplats estimated 20-year 6E LoM ounce profile

    FACT SHEET Zimplats estimated 20-year 6E LoM ounce profile as at 30 June 2023 Zimplats estimated 20-year 6E LoM ounce profile as at 30 June 2023 900 800 700 6E koz in concentrate 600 500 400 300 200 100 0 2043 2024 ■ LoM I Mineral Resources (inclusive reporting) as at 30 June 2023 Tonnes 4E Grade 6E

  5. Slide 5: Mining and Development

    Slide 5: Mining and Development

    ZIMPLATS MINING AND DEVELOPMENT Mining infrastructure consists of five annum due in FY2024 and FY2029, portals (decline shafts). The current respectively. Bimha and Mupani will average depth is 240m. Zimplats replace production from Rukodzi, which employs mechanised bord and pillar depleted in FY202

  6. Slide 6: History and Sustainable Development

    Slide 6: History and Sustainable Development

    FACT SHEET HISTORY In 1986 Delta Gold Limited (Delta) acquired rights to its first platinum resources on the Great Dyke. Delta brought BHP into a joint venture (2/3 BHP and 1/3 Delta) to develop Hartley Platinum Mine and development started in 1994. By 1998 Delta had extended its cover to include in

  7. Slide 7: Zimplats - Key Statistics

    Slide 7: Zimplats - Key Statistics

    ZIMPLATS ZIMPLATS - KEY STATISTICS FY2023 FY2022 FY2021 Production Tonnes milled ex mine (000t) 7 500 6 822 6 821 Headgrade (6E) (g/t) 3.33 3.42 3.44 6E in matte and concentrate (000oz) 611 584 579 Labour efficiency Tonnes milled per employee (t/man/annum) 1 216 1 187 1 220 costed** Cost Cost of sal

  8. Slide 8: Contact Details

    Slide 8: Contact Details

    CONTACT DETAILS HEAD OFFICE 2 Fricker Road, Illovo, 2196 Private Bag X18, Northlands, 2116 Tel: +27 (11) 731 9000 E-mail: investor@implats.co.za www.implats.co.za Group Executive: Corporate Affairs Johan Theron Tel: +27 (11) 731 9013 E-mail: johan.theron@implats.co.za Executive: Corporate Affairs Em

Source: Internet Archive copy of implats.co.za

More decks from Zimplats Holdings Limited

All 5 Zimplats decks