8 slides from Zimplats's fact sheet, December 2020
Slide 1: Zimplats
~~ RESPECT, CARE Yoeiars AND DELIVER Member of the Implats Group
Slide 2: Zimplats regional locality map
Zimplats regional locality map 30°40'E Zimplats Regional locality map 17°48'S 17°48'S rare To Ha Zimplats Hartley Inset tu hegu Portal 10 To C Portal 8 Mupani Bimha Mupfuti Zimplats Ngezi Rukodzi Turf Village Ngwarati Ngezi Dam 0 5 10 Scale (km) See inset 0 5 10 Scale (km) 30°40'E Zimplats is 87% ow
Slide 3: Geology
GEO LOGY The Great Dyke is a layered complex similar to that of the Bushveld Complex. It extends for 550 kilometres and has a maximum width of 11 kilometres. Within the Great Dyke, four geological complexes are known to contain PGM and base-metal deposits. These are the Wedza Complex (Mimosa – Siban
Slide 4: Mineral Resources and Mineral Reserves as at June 2020
Mineral Resources (inclusive reporting) as at 30 June 2020 Tonnes 4E Grade 6E Grade Category Width (cm) 6E (Moz) (Mt) (g/t) (g/t) Ngezi portals measured 191.4 245 3.38 3.57 22.0 MSZ indicated 409.1 230 3.41 3.61 47.4 inferred 130.2 210 3.39 3.57 14.9 Total 730.7 3.40 3.59 84.3 Hartley measured 32.1
Slide 5: Increasing level of geoscientific knowledge and confidence
150 Pt Ko 100 Bimha 50 Rukodzi Ngwarati Mupfuti 0 2021 2040 Q LoM I Zimplats 20-yearestimated Zimplats 20-year estimated LoM LoM palladium palladium ounce ounce profile as at 30 June 2020 profile as at 30 June 2020 250 200 Pd Koz in matte 150 Mupani 100 50 Bimha Rukodzi Ngwarati Mupfuti 0 2021 2040
Slide 6: History
HIST O R Y In 1986 Delta Gold Limited (Delta) acquired rights to its first platinum resources on the Great Dyke. By 1998 it had extended its cover to include interests in all the platinum resources of the Hartley Complex. Delta brought BHP into a joint venture (2/3 BHP and 1/3 Delta) to develop Hart
Slide 7: Zimplats – key statistics
ZIMP L AT S – k ey statistics zimplats – KEY STATISTICS FY2020 FY2019 Production Tonnes milled ex mine (000t) 6 751 6 486 Headgrade (6E) (g/t) 3.48 3.48 6E in matte and concentrate (000oz) 580 580 Labour efficiency Tonnes milled per employee costed** (t/man/annum) 1 355 1 208 Cost Cost of sales (Rm)
Slide 8: Contact details
CONTACT DETAILS HEAD OFFICE 2 Fricker Road, Illovo, 2196 Private Bag X18, Northlands, 2116 Tel: +27 (11) 731 9000 E-mail: investor@implats.co.za www.implats.co.za Group Executive: Corporate Affairs Johan Theron Tel: +27 (11) 731 9013 E-mail: johan.theron@implats.co.za Executive: Corporate Affairs Em