Slide 3: Snapshot
Snapshot 75 + 350+ INR 1,46,356 Mn Years of Industry Projects Executed Total Order Book Presence 87+ 300+ 15,000+ Dams Constructed KM Tunnels MW Hydro Project 53 14 5.5+ States – Domestic Ongoing Projects Lakh Acres Irrigated Presence 2.86 2 1,200+ Nepal & Bhutan – KM of Roads Book-to-Bill (Q1 FY27)
Slide 4: Q1-FY27 Performance
Q1-FY27 PERFORMANCE
Slide 5: Key Financials and Operational Highlights
Key Financials and Operational Highlights Q1-FY27 Consolidated Performance Q1-FY27 – Key Highlights Revenue from Subansiri Lower Hydropower Project reaches 1,000 MW OP. EBITDA OP. EBITDA Margin Operations operational capacity with commissioning of Unit 4. INR 12,807 Mn INR 1,796 Mn 14.02% 3.8% YoY 8
Slide 6: Key Operational Updates – Q1 FY27 (1/2)
Key Operational Updates – Q1 FY27 (1/2) Subansiri Lower Hydropower Project Unit 4 commissioned, taking clean energy connected Commencement of concreting works for Unit 7 at EL 102.25m The Reception and Conference Hall was inaugurated. to the grid to 1,000 MW Kwar Hydropower Project Achieved 50% dam
Slide 7: Key Operational Updates – Q1 FY27 (2/2)
Key Operational Updates – Q1 FY27 (2/2) Parnai Hydropower Project Shongtong Hydropower Project Completed the installation and erection of the roof truss structure Shri Sukhvinder Singh Sukhu, Hon'ble CM of Himachal at the powerhouse. Pradesh visit at Shongtong Karcham Hydropower Project Site. Dorjil
Slide 8: Awards & Accolades – Q1 FY27
Awards & Accolades – Q1 FY27 ASSOCHAM Achiever’s Award 2026 EPC World Awards Strategically Significant Infrastructure Project Outstanding Contribution to Roads, Highways & – USBRL Tunnels T15 & Part T14 Tunnelling – Sela Pass Road Tunnel Project Investor Presentation 7
Slide 9: Order Intake & Order Backlog
Order Intake & Order Backlog Order Intake (At the end of each year, Values in INR. Mn) Q1-FY27 Segmental Order Intake – INR 645 Mn 50000 1.2 44,009 45000 40,742 1 40000 35000 0.8 30000 25000 0.6 20000 0.4 15000 10000 0.2 Irrigation, 5000 1,112 645 100.00% 0 0 FY24 FY25 FY26 Q1-FY27 Order backlog (At
Slide 10: Total Order Book
Total Order Book Segment Wise Order Book Client Wise Order Book Project Completion Status 5.45% 3.45% 3.07% 17.53% 1.71% 15.45% 4.04% 38.22% 30.65% 14.88% 16.51% 62.29% 60.83% 21.08% 4.84% Hydroelectric Irrigation Central Government / PSU’s State Government Below 10% 10% - 30% 30% - 50% Tunnel Road
Slide 11: Geographical Presence & Order Book Split
Geographical Presence & Order Book Split 53 Ongoing Projects spread across 14 states domestically and also Jammu and International presence in Nepal and Bhutan with a total project value Kashmir of INR 1,46,356 Mn Himachal Domestic Pradesh Arunachal Sr.No. State No. of Projects Project Value (INR Mn
Slide 12: Quarterly Consolidated Income Statement
Quarterly Consolidated Income Statement Particulars (INR Mn) Q1-FY27 Q1-FY26 Y-o-Y Q4-FY26 Q-o-Q Revenue From Operations 12,807 12,334 3.8% 14,215 (9.9)% Total Expenses 11,011 10,681 3.1% 12,062 (8.7)% Operating EBITDA 1,796 1,653 8.7% 2,152 (16.5)% EBITDA Margins (%) 14.02% 13.40% 62 Bps 15.14% (11
Slide 13: Strategic Overview
STRATEGIC OVERVIEW
Slide 14: Focused Strategy to Drive Sustainable Growth
Focused Strategy to Drive Sustainable Growth Build capabilities in technology- Focus on high entry-barrier driven execution including segments including hydropower, pumped storage, and tunneling 01 04 tunneling, underground works, and advanced construction methods Leverage strong positioning in Main
Slide 15: Strengthening Balance Sheet & Credit Profile
Strengthening Balance Sheet & Credit Profile Debt Breakup (INR Mn) Total Debt Plus Advances (INR Mn) 16,025 22,670 12,927 18,092 19,081 11,870 6,645 10,015 6,222 6,154 8,469 9,684 16,025 11,870 12,927 6,010 3,401 3,243 FY25 FY26 Q1 FY27 FY25 FY26 Q1 FY27 Term Debt Working Capital Debt Total Debt Deb
Slide 16: Company Overview
COMPANY OVERVIEW
Slide 17: Company Overview
Company Overview • Established in 1949, Patel Engineering Limited (PEL) is a leading integrated infrastructure and Revenue & EBITDA Margin engineering, procurement, and construction company, headquartered in Mumbai, with over 50,934 51,027 45,441 75 years of experience. • Has completed over 350 infr
Slide 18: Board of Directors & Key Managerial Persons
Board of Directors & Key Managerial Persons Janky Patel | Chairperson & Non- Kavita Shirvaikar | Managing Kishan Lal Daga | Whole Time R V R Kishore | Whole Time Director- Ms. Sudha Navandar | Independent Executive Director Director Director Operations Director Non-Executive Chairperson "Continuing
Slide 19: Marquee Clientele
Marquee Clientele Madhya Pradesh Water Resources Department Investor Presentation 18
Slide 20: Marquee Projects Executed
Marquee Projects Executed Sawrakuddu HE Project - Himachal Pradesh (111 MW) Koyna HE Project - Maharashtra (260MW) First Piano Key Weir in India First Lake Tapping in Asia. Rampur HE Project - Himachal Pradesh (432 Mw) Srisailam HE Project - Andhra Pradesh (900 MW) Ghatghar Dam – Maharashtra 84m hig
Slide 21: Business Overview
__ BUSINESS _ OVERVIEW
Slide 22: Business Overview
Business Overview Hydropower & Dam Irrigation & Water Infrastructure Infrastructure • Dams, Underground Works & • Canal Networks & Water Powerhouses Distribution Systems • Tunnelling-Intensive Hydro • Large-Scale Government Projects Irrigation Projects • Government & PSU-Led Projects • Water Resourc
Slide 23: Hydropower & Dam Infrastructure
Hydropower & Dam Infrastructure • Execution of large-scale hydropower and pumped storage engineering, procurement and construction Revenues (INR Mn) projects. 28,145 24,593 22,061 • Involvement across critical hydro infrastructure components, including dams, tunnels, and underground powerhouses. • S
Slide 24: Irrigation & Water Infrastructure
Irrigation & Water Infrastructure Revenues (INR Mn) • Execution of large-scale irrigation and water infrastructure projects across India. 13,251 • Focus on development of canal networks, water distribution systems, and associated civil works. 11,387 10,658 • Focus on improving water-use efficiency t
Slide 25: Tunnelling & Underground Engineering
Tunnelling & Underground Engineering Revenues (INR Mn) • Specialised engineering segment focused on underground infrastructure across hydropower and transportation projects. 8,384 • Expertise in advanced tunnelling techniques including tunnel boring machine and drill-and-blast methods. 6,350 5,351 •
Slide 26: Transportation, Urban Infrastructure & Others
Transportation, Urban Infrastructure & Others Revenues (INR Mn) • Execution of transportation infrastructure projects including roads, bridges, rail tunnels, urban connectivity works and others. 7,739 • Participation in highway, railway, and metro-related projects across multiple regions. 6,372 • In
Slide 27: Industry Overview
INDUSTRY OVERVIEW
Slide 28: Hydropower & Pumped Storage Opportunity Pipeline
Hydropower & Pumped Storage Opportunity Pipeline Pumped Key Drivers Hydropower Storgae Clean & Renewable Energy: Projects • Hydropower and PSP’s are critical for India’s clean energy transition. Growing Power Demand: • Rising demand and peak power requirements BUILDING A STRONG driving new capacity
Slide 29: Capital Market Information
Capital Market Information Share Price up to 30th June, 2026 10% 0% -10% -20% -30% -40% -50% Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Patel Engineering Sensex Price Data (As on 30th June, 2026) INR Shareholding Pattern (As on 30th June, 2026) Face Value 1.0
Slide 30: Disclaimer
Disclaimer Patel Engineering Ltd No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained in this presentation. Such information and opinions are in all events n