Andrada Mining Limited · LSE:ATM

Andrada Mining — Mining Indaba 2023

31 slides from Andrada Mining's conference presentation, Feb 7, 2023

  1. Slide 1: Mining Indaba Cape Town

    Mining Indaba Cape Town 6 – 7 February 2023 LSE AIM: ATM NSX: ATM

  2. Slide 2: Disclaimer

    DISCLAIMER These presentation slides (the “Slides”) do not comprise an admission document, Any investment, investment activity or controlled activity to which the Slides relates listing particulars or a prospectus relating to Andrada Mining Limited (“the is available only to such persons and will be

  3. Slide 3: Investment Case

    INVESTMENT CASE Andrada is well-positioned to be a significant tech - metal producer

  4. Slide 4: Key Success Factors

    INVESTMENT CASE KEY SUCCESS FACTORS​ WORLD CLASS RESOURCE BASE NEGATIVE AISC¹ • Globally significant lithium resource with tin and tantalum • Negative AISC of US$490/t LCE² highly competitive by-products during commodity cycles • Upside spodumene potential on adjacent B1C1 mining licence DE-RISKED D

  5. Slide 5: Strong Management Supported by an Experienced Board

    INVESTMENT CASE STRONG MANAGEMENT SUPPORTED BY AN EXPERIENCED BOARD GLEN PARSONS TERENCE GOODLACE LAURENCE ROBB MICHAEL RAWLINSON Non-executive Chairman Non-executive Director Non-executive Director Non-executive Director • CEO of Awale Resources • NED Gold Fields Limited, • Visiting Professor at th

  6. Slide 6: Namibia Is a Relatively Stable Mining Jurisdiction in Africa

    INVESTMENT CASE NAMIBIA IS A RELATIVELY STABLE MINING JURISDICTION IN AFRICA Mining public policy perception index • Democratic government (2021) with an independent legal system African Rank Country Index Value • Supportive mining law regulated by the Minerals Act 1 Morocco 98 33 of 1992 which was

  7. Slide 7: Tin & Tantalum Market Fundamentals

    INVESTMENT CASE TIN & TANTALUM MARKET FUNDAMENTALS TIN Sn • Semi- conductor and new technology led demand • Limited substitution, limited new supply • Long-term pricing fundamentals remain robust • Recent price volatility due to macro events rather than fundamental TANTALUM Ta • A superalloy used in

  8. Slide 8: Growing Uses of Petalite Hard Rock Lithium

    INVESTMENT CASE GROWING USES OF PETALITE HARD ROCK LITHIUM Global lithium reserves Estimated at 21 million metric tonnes Primary resources Hardrock (Petalite or Spodumene) Sedimentary Brine Source: USGS Mineral Commodity Summaries (2022). Minerals Yearbook (2010) AN EMERGING AFRICAN TECHNOLOGY METAL

  9. Slide 9: Strong Demand Growth Forecast

    INVESTMENT CASE STRONG DEMAND GROWTH FORECAST Strong demand growth forecast with no foreseeable return to supply surplus No substitute for battery cathode chemistry Increasing supply deficit an opportunity for Andrada Source: Bloomberg NEF, Wood Mackenzie, Broker research, Benchmark Mineral Intellig

  10. Slide 10: Rebranding: Tin Focus to Tech-Metals Focus

    INVESTMENT CASE REBRANDING: Tin focus tech – metals focus • AfriTin associated with tin production only. • Increased confidence in lithium and tantalum mineralisation throughout the resource​ • Expanded vision to harness the value from the current by- products of tin production • Potential technolog

  11. Slide 11: Operational Update

    OPERATIONAL UPDATE Operating Uis mine demonstrates management’s ability to execute

  12. Slide 12: Increased Production Profile Following Expansion Project

    OPERATIONAL UPDATE INCREASED PRODUCTION PROFILE FOLLOWING EXPANSION PROJECT UIS performance as at November 2022 • Commissioning of expanded crushing and tin concentrating circuits • 88 tonnes of concentrate containing 53 tonnes of tin produced - 88% of the expanded nameplate - 76 tonnes at 48t tin m

  13. Slide 13: Tin Production Growth

    INVESTMENT CASE INVESTMENT CASE TIN PRODUCTION GROWTH ✓ Expansion ✓ commissioned Final configuration Achieved above 10,000 tpa contained Sn nameplate production Ore sorting 2,500 tpa contained Sn Uis tin production Crushing expansion to 900 tpa contained Sn Uis start-up operation Planned projects to

  14. Slide 14: Lithium Update

    LITHIUM UPDATE Lithium resource will make Andrada a globally significant, high-margin producer of technology metals

  15. Slide 15: Lithium Investment Case

    LITHIUM UPDATE LITHIUM INVESTMENT CASE Significant lithium resource 587kt Li₂O at 0.73% (JORC 2012) Conventional open-pit mining operation Lithium contained in the same ore body as the Current plant following expansion currently extracted tin Scalable early production through expansion of existing m

  16. Slide 16: Establishing an On-Site Pilot Facility

    LITHIUM UPDATE ESTABLISHING AN ON-SITE PILOT FACILITY Construction underway for V1V2 P i t lithium pilot facility, Current activity Processing facility w i t h production capacity of 20 tph 1,200 tpa nameplate Commissioning due 2023 • Operational expansion production • Commercial banking partnership

  17. Slide 17: Licenced Areas Within a Tech-Metal Province

    LITHIUM UPDATE LICENCED AREAS WITHIN A TECH-METAL PROVINCE Brandberg West Li Sn W Cu Lithium Ta Tantalum Uis Sn Li Ta Sn Tin B1/C1 Li Ta Sn Cu Copper Nai-Nais Sn Li Ta W Tungsten Mine in production Developing projects AN EMERGING AFRICAN TECHNOLOGY METALS CHAMPION

  18. Slide 18: Opportunity to Substantially Increase the Resource

    LITHIUM UPDATE OPPORTUNITY TO SUBSTANTIALLY INCREASE THE RESOURCE K-Cluster P-Cluster Processing Plant V1V2 Orebody (Current Resource) MRE V1V2 Tin Tantalum Lithium September 2019 (Sn) (Ta) (Li₂O) Grade 0.134% 85ppm 0.63% Resource tonnes* 71.54 Mt 71.54 Mt 71.54 Mt V-Cluster (excl. V1V2) Contained m

  19. Slide 19: Lithium Resource Upgrade: Mineral Resource Estimate

    LITHIUM RESOURCE UPGRADE MINERAL RESOURCE ESTIMATE MRE V1V2 Tin Tantalum Lithium Pegmatites (Sn) (Ta) (Li₂O) February 2023 Grade 0.15% 86 ppm 0.73% Resource tonnes⃰ 81 Mt 81 Mt 81 Mt Contained metal 120 Kt 6.96 Kt 1.45 Mt LCE MRE Proximal Tin Tantalum Lithium pegmatites (Sn) (Ta) (Li₂O) January 2023

  20. Slide 20: Potential Lithium Contribution to Uis

    LITHIUM UPDATE POTENTIAL LITHIUM CONTRIBUTION TO UIS* GROSS REVENUE DISTRIBUTION POTENTIAL FUTURE LITHIUM PRODUCTION COST PROFILE 5% 34% Negative AISC 61% Tin concentrate Lithium concentrate Tantalum concentrate *Management estimate LCE = Lithium Carbonate Equivalent *Based on Roskill/Wood Mackenzie

  21. Slide 21: Andrada Well Positioned to Become the Next Large Hard-Rock Lithium Producer

    LITHIUM UPDATE ANDRADA WELL POSITIONED TO BECOME THE NEXT LARGE HARD-ROCK LITHIUM PRODUCER Andrada Care & maintenance Feasibility/ Development Producing Source: Company information 1) Bubble size represents LOM average annual lithium concentrate production 2) Based on Consolidated Phase 1 and 2 tech

  22. Slide 22: B1C1

    LITHIUM UPDATE B1C1 Historic activity • Mineralogically similar to the Uis pegmatites • Artisanally mined to 2-3 m depth primarily for tantalite • Spodumene mineralisation identified • Proximal pegmatites to be further investigated Work plan overview: • Initial drilling commenced in January 2023 - T

  23. Slide 23: Nai Nais

    LITHIUM UPDATE NAI NAIS Work plan overview: • Infill mapping and sampling - To map and channel sample pegmatites along the high grade trend • Initial RC drill programme - To determine lithium mineralisation below surface - To prove continuation or mineralisation - To establish pegmatite morphology •

  24. Slide 24: Development Roadmap

    DEVELOPMENT ROADMAP MEDIUM-TERM 2022 2023 2024 2025 Tin Production Lithium Expansion 2.5 Mtpa plant feed Drilling 15,000 tpa LCE UIS MINE 2,500 tpa tin metal (ML134) Piloting 30 tpa Ta2O5 Feasibility Study 1 Mtpa plant feed Construction 900 tpa tin metal B1C1 Spodumene discovery Drilling & MRE (ML12

  25. Slide 25: Short-Term ESG Roadmap

    SUSTAINABILITY SHORT – TERM ESG ROADMAP Action Emissions and Net-Zero Strategy Development of and develop a Human Rights Due Q1 2023 Biodiversity Policy Q3 2023 Dilligence Programme Improve Community and Q2 2023 Publish Second Q4 2023 Stakeholder Relations Sustainability Report AN EMERGING AFRICAN T

  26. Slide 26: CEO Quote: Tier One Technology Metals Mining Company

    “Andrada aims to be a tier one technology metals mining company, sustainably creating value for all stakeholders.” Anthony Viljoen, CEO

  27. Slide 27: Appendix

    APPENDIX

  28. Slide 28: EPL 5445 – Brandberg West

    APPENDIX EPL 5445 – BRANDBERG WEST ​ Work plan overview: • Initial drilling within the historical pit and along northern extension, • Programme divided into two parts due to budget constraints, • Initial portion has been approved. • Near- mine exploration programme • To follow up on litho-geochemica

  29. Slide 29: Lithium Feedstock Specifications

    APPENDIX LITHIUM FEEDSTOCK SPECIFICATIONS Chemical Market Technical Grade Glass/Ceramics Chemical Grade LiOH.H2O Spodumene Ore: >6% Li2O (>56.5 wt%) >1% Fe2O3 Lithium Hydroxide <8% Moisture Monohydrate Battery Grade Chemical Grade LiOH.H2O Petalite Ore: (>56.5 wt%) >4% Li2O <0.8% Fe2O3 Battery Produ

  30. Slide 30: Contact Us

    REGISTERED OFFICE POBox 282 Oak House Hirzel Street, St Peter Port 3rd Floor 150 Cheapside Investor Relations CONTACT US Guernsey GY13RH 7-10 Chandos Street London UK 1 Cornhill T: +27 11 268 6555 London EC2V 6ET United London info@andradamining.com W1G 9DQ Kingdom EC3V 3ND REPRESENTATIVEOFFICE | Un

  31. Slide 31: KA Andrada a

    KA Andrada a Mining andradamining.com

Andrada Mining — Mining Indaba 2023 on 6ix