Andrada Mining Limited · LSE:ATM

Andrada Mining — Technical Presentation (August 2026)

9 slides from Andrada Mining's technical presentation, August 2026

  1. Slide 1: The ProLith Project: Developing Lithium Extraction in Namibia

    The ProLith Project: Developing Lithium Extraction in Namibia Collaborative EU Funding Initiative for the Uis Tin Mine UIS PETALITE LOWER-INTENSITY BATTERY-GRADE CONVERSION LITHIUM MATERIALS Timothy Marais PATHWAY Head of Exploration, Andrada Mining UIS PETALITE ANDRADA MINING × GTK

  2. Slide 2: Project Overview and Strategic Partnership

    Project Overview and Strategic Partnership Three complementary partners aligning resources, research, and technology around petalite conversion. Andrada Mining GTK Metso EU funding application Uis lithium resource, Sodium/alkaline leach coordination, applied Operating Mine, and expertise and industr

  3. Slide 3: Grade and Recovery Evaluation

    Grade and Recovery Evaluation Value is optimised across the whole flowsheet - not by concentrate grade alone. Ceramic-grade target Shift from ProLith conversion target grade only target 4.2% Li₂O 3.5% Li₂O to whole-system considerations value Higher concentrate specification Optimise recovery + Fewe

  4. Slide 4: The Traditional Metallurgical Challenge

    The Traditional Metallurgical Challenge Validation focus: assessing whether Uis petalite can be processed directly without a calcination stage. Energy- Intensive Spodumene route Thermal Activation Potential enabler Removing petalite calcination will lower process intensity and operating burden — tes

  5. Slide 5: Scope of the EU Funding Allocation

    Scope of the EU Funding Allocation EU funding application in progress Objective: To Generate Mineralogical, Metallurgical, and Processing Data Indicative programme budget: €4.5m Relates initial feed grade to recovery, conversion response, water recovery and optimisation

  6. Slide 6: Environmental and Social Governance Focus

    Environmental and Social Governance Focus Closed-loop process-water optimisation for an arid operating environment Dense-media rinsing, recovery and recycling investigation Residue and by-products assessed for recovery, reuse or safe disposal Dense-Media Residue Skills Vocational training and skills

  7. Slide 7: Future Vision: Phase 2 – Eliminating Waste

    Future Vision: Phase 2 Future ambition — Eliminating Waste From petalite validation to circular resource management at Uis Phase 1: Validate Phase 2: Integrate Long-Term Aspiration Petalite recovery, conversion response, Circular resource management water, media optimisation and skills transfer acro

  8. Slide 8: Potential Impact of the ProLith Project

    Potential Impact of the ProLith Project Potential outcomes - subject to successful technical Shared value for Namibia and the European Union validation and commercial implementation NAMIBIA Battery-market access - Uis could Finnish technology deployed - produce petalite concentrate suitable for succ

  9. Slide 9: Conclusion & Q&A

    Conclusion & Q&A Lower Process Intensity Higher Resource Recovery Namibian Value Addition Validation focus: Utilisation Optimize around a 3.5% Li₂O Build local capability through of petalite for the production conversion feed. skills transfer, site advancement, of lithium carbonate and technology in

Andrada Mining — Technical Presentation (August 2026) on 6ix