Investor presentation July 2024 Aker BP ASA

Slide 2: Disclaimer
Disclaimer This Document includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Document are based on current expectations, estimates and projections about globa

Slide 3: Contents
Contents Page 4 Aker BP at a glance Page 7 Company overview Page 11 Oil & gas will remain a crucial part of the energy mix Page 14 Our strategic priorities Page 15 Operate safely and efficiently Page 23 Decarbonise our business Page 28 Deliver high return projects on quality, time and cost Page 41 E

Slide 4: Aker BP at a glance
Aker BP at a glance World-class oil and gas portfolio with large scale, low risk assets on the Norwegian Continental Shelf 2P reserves1 2C resources1 Production2 arstad 1.72bn 0.81bn 457 boe boe mboepd Sandnessj en Skarv Trondheim Johan Sverdrup Edvard Grieg / Ivar Aasen Valhall area Partner, 31.6%

Slide 5: Aker BP at a glance
Aker BP at a glance Our strategic priorities 1 2 3 Deliver high return 4 Establish the next Operate safely Decarbonise projects on quality, wave of profitable and efficiently our business time and cost growth options 457 kboepd 2.8 kg Co2e/boe 770 mmboe 2 bnboe Net production in 2023 Emissions inten

Slide 6: Financial framework to drive value creation & returns
Aker BP at a glance Financial framework to drive value creation & returns Financial capacity Value creation plan 2023-28 Returning value Liquidity (USD billion) USD billion, accumulated Dividends (USD/share) 8 2 2.40 7 6.8 2 20 2.20 6.2 2 $90/bbl 2.00 6 1.5 5.4 1 15 Dividend 4.5 5 1 $65/bbl capacity

Slide 7: Aker BP's investment proposition
Aker BP’s investment proposition The E&P company of the future ✓ World-class assets with high efficiency and low cost ✓ Low emissions and clear pathway to net zero ✓ Driving transformation through digital and alliances ✓ Profitable growth from unique resource base ✓ Financial strength & growing divi

Slide 8: Growth through M&A and projects
Growth through M&A and projects Transactions + 18 organic development projects 500 000 457k 400 000 300 000 200 000 100 000 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 8

Slide 9: Reserves and resources
Reserves and resources Year-end 2023 2P oil and gas reserves 2C contingent resources Skarv Alvheim Area Discoveries Area 5% 15% Non-op 8% 26% Johan Sverdrup Grieg/Aasen 33% Area 11% Alvheim Area 1,716 mmboe 7% 809 mmboe Grieg/Aasen Area Yggdrasil 8% 21% Valhall Area Yggdrasil 25% Valhall Area 22% 13

Slide 10: Large value creation to shareholders
Large value creation to shareholders Index 1000 900 >600% shareholder 800 return last 10 years 700 600 ~22% annual 500 investor return 400 Index of US oil companies 300 200 100 Index of European oil companies 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Source: Bloomberg, Total Shareholder Re

Slide 11: Oil & gas will remain a crucial part of the energy mix
Oil & gas will remain a crucial part of the energy mix Total energy supply (IEA WEO 2022) Stated policies scenario Announced pledges scenario Net zero emissions by 2050 scenario 2010 2020 2030 2040 2010 2020 2030 2040 2010 2020 2030 2040 Oil Natural gas Coal Nuclear Renewables Oil Natural gas Coal N

Slide 12: Our contribution as a pure play E&P company
Our contribution as a pure play E&P company Maximize Minimize Share technology value emissions and knowledge for shareholders and the society from our operations to enable new industries while producing the energy the world needs 12

Slide 13: Aker BP's improvement programme
Aker BP’s improvement programme Strategic alliances Lean operations Flexible business models Digitalisation One-team culture with our main Framework for developing Re-thinking how we structure our Essential enabler suppliers based on common goals more efficient interactions with suppliers and for bu

Slide 14: Our strategic priorities
Our strategic priorities Ambition to lead the industry transformation as the E&P company of the future Deliver high return Establish the next Operate safely Decarbonise projects on quality, wave of profitable and efficiently our business time and cost growth options Return maximum value to our share

Slide 15: Operate safely and efficiently
Operate safely and efficiently 15

Slide 16: Safety
Safety Injury frequency (TRIF)1 Serious incident frequency (SIF)1 3.7 2.6 2.4 2.0 1.7 1.6 0.7 0.7 0.5 0.3 0.3 0 2019 2020 2021 2022 2023 Q2-24 2019 2020 2021 2022 2023 Q2-24 1) TRIF and SIF, L12m, prior years have been restated to reflect a more accurate methodology for measurement of exposure hours

Slide 17: Production
Production Oil & gas production per area 1,000 mboepd 481 453 450 444 448 444 432 Ula area 412 Alvheim area Skarv area Valhall area Grieg/Aasen 181 Johan Sverdrup Q2-22 Q3-22 Q4-22 Q1-23 Q2-23 Q3-23 Q4-23 Q1-24 Q2-24 Lundin portfolio included from Q3-22 17

Slide 18: Johan Sverdrup
Johan Sverdrup A world-class oil field with excellent reservoir properties Industry-leading Industry-leading Aker BP Total original reserves Oil production capacity low production cost low carbon emissions working interest 2.7 755 ~$2 <1 kg 31.6 billion boe mboepd USD/boe CO2/boe percent 18

Slide 19: Johan Sverdrup
Johan Sverdrup Steady production at elevated plateau Johan Sverdrup production Net to Aker BP, mboepd ▪ Continued high production efficiency 300 ▪ Four new production wells online in 1H 250 ▪ Six more production wells to be added in 2H 200 ▪ Planning for retrofit multilaterals next year 150 ▪ Maturi

Slide 20: Production efficiency
Production efficiency High production uptime1 95% 96% 97% 95% 94% 94% 93% 93% 84% Q2-22 Q3-22 Q4-22 Q1-23 Q2-23 Q3-23 Q4-23 Q1-24 Q2-24 1) Total portfolio per quarter (operated and non-operated) 20

Slide 21: Production costs
Production costs A strong competitive position Aker BP production cost Industry peers total operational cost1 USD per boe USD per boe, 2023 20 15 12.0 10 7.3 7.2 7.2 6.2 6.1 6.4 5.6 6.0 5 0 Q2-22 Q3-22 Q4-22 Q1-23 Q2-23 Q3-23 Q4-23 Q1-24 Q2-24 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Base op

Slide 22: Future operations – modernising and digitalising the way we work
Future operations – modernising and digitalising the way we work Integration of Integrated New cooperation Remote operations new concepts Operation Centres models and maintenance New ways of Data-driven Increased digital Automation working decisions competence for all 22

Slide 23: Decarbonise our business
& AkerBP Decarbonise our business

Slide 24: Aker BP's decarbonisation strategy
Aker BP’s decarbonisation strategy Reducing absolute scope 1&2 GHG emissions before neutralising residual emissions Scope 1&2 Scope 3 Aker BP’s targets 1. Reduce operated scope 1&2 Avoid Reduce Neutralise Upstream scope 3 GHG emissions with 50% by reduction through procurement 2030 and ~100% by 2050

Slide 25: Aker BP – a global leader in low CO2 emissions
Aker 140 BP – a global leader in low CO2 emissions 120 Net emission intensity 2023 kg CO2e per boe, equity share 100 80 60 40 20 0 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 285 largest producing upstream companies Source: Wood Mackenzie– Global upstream CO2 emissions 25

Slide 26: Staying below our strict GHG and methane targets
Staying below our strict GHG and methane targets GHG intensity Methane intensity Kg CO2e/boe, total equity share of scope 1&2 emissions % methane in saleable gas, operated gross volume 10 0.12% 8 0.10% 6 0.08% Our target: Our target: <0.05% <4 kg CO2e/boe 0.06% (Industry average* is 0.20%) 4 0.04% 2

Slide 27: Targeting net zero scope 1&2 emissions by 2030
Targeting net zero scope 1&2 emissions by 2030 Aker BP to offset all our remaining emissions using high-quality carbon removal projects Total estimated equity share scope 1&2 emissions Our approach 1 000 tonnes CO2e 800 Avoid Thousands New assets with power from shore 600 Target 100% electrification

Slide 28: Deliver high-return projects on quality, time and cost
Deliver high-return projects on quality, time and cost 28

Slide 29: Aker BP project overview
Aker BP project overview ~770 mmboe net oil and gas volume at net capex of around USD 3 billion after tax Aker BP Production Asset area Field development Gross/net volume Net capex estimate PDO submission ownership start Frosk 80.0% 10/8 mmboe USD 0.2bn 2021 2023 Alvheim Kobra East & Gekko 80.0% 50/

Slide 30: Our key principles for successful project execution
Our key principles for successful project execution Partnerships Standardisation Frontloading ✓ Competence and learning ✓ Well designs and equipment ✓ Early planning and maturation ✓ Continuity ✓ Topside and subsea equipment ✓ Supplier involvement ✓ Common goals and incentives ✓ Facilitate efficient

Slide 31: Alliances with leading suppliers – with proven track record
Alliances with leading suppliers – with proven track record The cornerstone of project planning and execution Alliances established with leading suppliers ▪ Covering majority of capital spend ▪ Subsea, Fixed Facilities, Modifications and Drilling ▪ One team - Common goals - Shared incentives Organis

Slide 32: Project execution on track
Project execution on track ▪ Major milestones successfully reached ▪ Fabrication and installation activities well underway ▪ Subsea activities and drilling progressing well ▪ Tyrving start-up planned for October ▪ Total capex estimate in line with plans First subsea structures on Yggdrasil installed

Slide 33: Development projects to drive growth and value creation
Development projects to drive growth and value creation Net volume ~770 mmboe I Net capex USD ~3 billion after tax I Portfolio BE at USD 35-40 per barrel1 Production outlook mboepd ~525 ▪ New hub with several discoveries ▪ Upside potential in the area 420-440 Yggdrasil ▪ Capex USD 10.7bn (pre-tax) N

Slide 34: Yggdrasil
Yggdrasil New North Sea area hub by joining forces across licences Aker BP Hugin: 87.7% Gas ~40% of (operator) Munin: 50.0% estimated volumes Fulla: 47.7% Partners Equinor and Power supply PGNiG Upstream Norway from shore Munin Unmanned production platform Volume estimate 650 mmboe (gross) / A new d

Slide 35: Valhall PWP-Fenris
Valhall PWP-Fenris Unlocks new volumes and secures life-time extension on Valhall PWP WP/IP PH Aker BP Valhall: 90.0% Establishes Valhall (operator) Fenris: 77.8% as area gas-hub Partners PGNiG Upstream Norway Power supply and Pandion from shore Valhall Volume estimate 230 mmboe (gross) / Minimal em

Slide 36: Skarv Satellites
Skarv Satellites Investments in future flexibility enabling further area development Aker BP Alve North: 68.1% Gas ~70% of (operator) Idun North: 23.8% estimated volumes Ørn: 30.0% Partners Equinor, Wintershall DEA Low operational and PGNiG Upstream cost Norway Volume estimate 119 mmboe (gross) / Lo

Slide 37: Utsira High projects
Utsira High projects Increased capacity utilisation at Ivar Aasen and Edvard Grieg platforms Aker BP Solveig Ph. II: 65.0% Adds low-cost (operator) Symra: 50.0% production Hanz: 35.0% Partners Equinor, OMV, Unlocks potential Wintershall Dea and future developments Sval Energi Solveig Volume estimate

Slide 38: Alvheim projects
Alvheim projects Unlocks new volumes, reduces unit cost and secures life-time extension on Alvheim Aker BP Frosk: 80.0% Tie-backs to existing (operator) KEG: 80.0% infrastructure Tyrving: 61.3% Accounts for ca. 50% Partners Concedo, ConocoPhillips, of net Alvheim Petoro, PGNiG Upstream volumes in 20

Slide 39: Execution through alliances and incentive-based contracts
Execution through alliances and incentive-based contracts Capacity secured with alliance partners The PDOs …with the majority of work performed …and compensation formats that incentivise in December… by the alliance partners… productivity and cost reductions 100% Skarv satellites Other facilities, L

Slide 40: Signed contracts with all major yards in Norway
Signed contracts with all major yards in Norway Close and early collaboration to ensure capacity, construction quality and efficiency Aker Solutions Stord Aker Solutions Verdal Aker Solutions Egersund Aker Solutions Sandnessjøen ▪ PWP Topside Fabrication/Integration ▪ Fenris Topside and Jacket ▪ Hug

Slide 41: Establish the next wave of profitable growth options
Establish the next wave of profitable growth options 41

Slide 42: Our exploration strategy
Our exploration strategy Aker BP operator Aker BP partner Uniquely positioned on the NCS ▪ 2nd largest in Norway with over 200 licences ▪ Operator of ~70% ▪ 27 licences awarded in APA 2023 – all-time high Targeting net 250 mmboe from 2022 to 2027 ▪ Drill 10-15 exploration wells per year ▪ 80% near-f

Slide 43: Recent exploration activity
Recent exploration activity Significant oil discovery in the Yggdrasil area Discovery at Frigg East in 2023 ▪ Current volume estimate of 53-90 mmboe gross ▪ Increases the resource base for Yggdrasil ▪ Highly profitable with break-even well below $20/bbl Several other discoveries ▪ 2023: Carmen, Ofel

Slide 44: 2024 exploration program
Ferdinand Hassel 2024 exploration program Aker BP operator Aker BP partner Licence Prospect Operator Aker BP Pre-drill Status Elgol share mmboe PL102G Trell North* Aker BP 61% 3-8 mmboe PL1138 Ametyst Harbour Energy 30% 6-19 mmboe PL956 Ringhorne North Vår Energi 20% 13-23 mmboe PL211CS Adriana* Win

Slide 45: Significant upside potential around existing assets
Significant upside potential around existing assets Reserves and resources billion boe 4.0 ▪ Skarv: Infill drilling, exploration and ILX potential, development of tight reservoirs net risked ▪ Edvard Grieg/Ivar Aasen: Infill drilling, 3.0 exploration and basement upside 3P reserves ▪ Johan Sverdrup:

Slide 46: Return maximum value to shareholders and society
Return maximum value to shareholders and society 46

Slide 47: Capital allocation priorities
Capital allocation priorities Aker BP’s financial frame – designed to drive value creation and shareholder return 1 Financial capacity 2 Profitable growth 3 Return value Maintain financial flexibility and Invest in robust projects Resilient dividend growth in line investment grade credit rating with

Slide 48: Continuously optimising our capital structure
Continuously optimising our capital structure Recent financing transactions Bond maturities USD/EUR billion 2024: EUR 750 million in new Senior Notes issued 1.75 ▪ 2032 maturity 2023: USD 1,500 million in new Senior Notes issued ▪ USD 500 million Notes due in 2028 1.00 1.00 ▪ USD 1,000 million Notes

Slide 49: Maintaining financial flexibility
Maintaining financial flexibility Net interest-bearing debt Leverage ratio1 Liquidity available2 Excl. leases, USD billion Targeting below 1.5 over time USD billion 7 6.8 6.8 6.6 6.6 6.1 6 5 4 0.9 3.4 3.1 3 2.6 2.4 2.4 0.6 0.5 2 0.3 3.4 3.4 3.2 3.2 0.3 2.7 1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0 Q2-23 Q

Slide 50: Investing in robust and profitable projects
Investing in robust and profitable projects In an investment-friendly tax system Aker BP est. capex before and after tax USD billion 6 ▪ Total capex estimate 2023-2028 in line with 5 plans presented one year ago 4 ▪ Minor adjustments to capex phasing between years 3 2 ▪ ~85% of the planned capex is

Slide 51: Near-term tax payments
Near-term tax payments Sensitivity for H2-2024 USD million 2 500 Tax instalments ▪ Tax for the year is paid in six bimonthly instalments with six months delay 2 000 ▪ Initial tax estimate for the year is made in Q2, the H2-instalments are then fixed in NOK ▪ Option for voluntary additional payment i

Slide 52: Strong and resilient cash flow as basis for dividend growth
Strong and resilient cash flow as basis for dividend growth Aker BP value creation plan 2023-2028 Dividends USD billion, accumulated USD per share 2.40 2.20 2.08 ▪ Low-cost production gives 20 2.00 resilient dividend capacity $90/bbl 15 ▪ Distributions shall reflect the Dividend 1.35 capacity throug

Slide 53: Second quarter 2024
Second quarter 2024 12 July 2024 Aker BP ASA

Slide 54: Highlights
Highlights Second quarter 2024 Excellent operational performance ▪ High production efficiency and volumes ▪ Low cost and emissions Development projects on track ▪ Fabrication and installation activities well underway ▪ Cost estimates and schedule unchanged Strong financial performance ▪ High underly

Slide 55: Sales of oil and gas
Sales of oil and gas Volume sold Realised prices Total income mboepd USD/boe USD million 477 467 461 450 88 3 513 3 556 69 429 84 83 83 3 376 59 63 3 291 60 77 336 398 3 078 326 64 399 301 74 64 60 57 51 409 390 408 398 3 140 3 140 364 2 858 3 011 2 748 Q2-23 Q3-23 Q4-23 Q1-24 Q2-24 Q2-23 Q3-23 Q4-2

Slide 56: Income statement
Income statement USD million Before impairment Q2 2024 Impairments Actual Q1 2024 Actual 461 mboepd (429) Total income 3 377 3 377 3 078 Oil and gas sales Production costs 290 290 211 Other operating expenses 13 13 11 EBITDAX 3 074 3 074 2 855 $80 per boe (78) Exploration expenses 108 108 68 Net rea

Slide 57: Cash flow
Cash flow USD million $-0.28 bn (0.34) Q2-24 Q1-24 Q4-23 Q3-23 Op. CF before tax and WC changes 3 133 2 986 3 204 3 235 Taxes paid (2 086) (1 054) (2 207) (862) Free cash flow (FCF) Changes in working capital1 100 (476) 506 (272) Cash flow – operations 1 147 1 456 1 503 2 101 $-0.45 (0.54) Cash flow

Slide 58: Near-term tax payments
Near-term tax payments Sensitivity for H2-2024 USD million 2 500 Tax instalments ▪ Tax for the year is paid in six bimonthly instalments with six months delay 2 000 ▪ Initial tax estimate for the year is made in Q2, the H2-instalments are then fixed in NOK ▪ Option for voluntary additional payment i

Slide 59: Balance sheet
Balance sheet USD million Assets 30.06.24 31.03.24 31.12.23 PP&E 18 620 17 819 17 450 $6.6 bn ($6.6) Goodwill 13 060 13 143 13 143 Total available liquidity Other non-current assets 3 307 3 207 3 314 Cash and equivalent 3 233 3 215 3 388 Other current assets 1 997 2 053 1 751 32% (32%) Total Assets

Slide 60: 2024 guidance
2024 guidance Previous Actual New guidance Jan-June guidance Production 410-440 446 420-440 mboepd Production cost ~7.0 6.2 ~7.0 USD/boe Capex ~5.0 2.28 ~5.0 USD billion Exploration ~0.50 0.25 ~0.50 USD billion Abandonment ~0.25 0.14 ~0.25 USD billion 60

Slide 61: The Norwegian petroleum tax system
The Norwegian petroleum tax system

Slide 62: The Norwegian petroleum tax system
The Norwegian petroleum tax system An overview ▪ Stable 78% tax rate, consisting of corporate tax (CT) and special petroleum tax (SPT) Ordinary tax system ▪ Cash flow-based tax system from 2022 ▪ Immediate deductions for offshore investments in SPT and refund of tax losses ▪ An additional 12.4 % ded

Slide 63: The tax system is highly supportive for investments
The tax system is highly supportive for investments In the investment phase, taxes paid are significantly lower than tax expense in the P&L Illustrative1 tax calculations Aker BP 2023 - 2028 USD billion 10 ▪ Relatively low tax payments in periods with 8 high investments ▪ Especially prominent in low

Slide 64: Overview of calculation of current tax (cash tax)
Overview of calculation of current tax (cash tax) Analyst information EBITDAX Exploration spend Abandonment spend EBITDA EBITDA Corporate tax depreciation Special tax depreciation** Tax EBIT x 22% Corporate tax deductible in special tax Net financial expense Uplift Corporate tax base* Special tax ba

Slide 65: www.akerbp.com
AkerBP www.akerbp.com
Source: Internet Archive copy of akerbp.com
More decks from Aker BP ASA
Q3 2026 Earnings Presentation21 slides · Oct 29, 2026
Investor Presentation (October 2026)69 slides · October 2026
Investor Presentation (July 2026)81 slides · Jul 15, 2026
Q2 2026 Earnings Presentation25 slides · Jul 15, 2026
Q1 2026 Earnings Presentation24 slides · May 7, 2026
Q4 2025 Earnings Presentation71 slides · Feb 11, 2026