  1. Slide 1: Investor presentation

    Investor presentation July 2026 Aker BP ASA

  2. Slide 2: Contents

    Contents Page 3 Aker BP at a glance Page 5 Oil demand expected to grow for at least a decade Page 7 Distinct capabilities driving E&P operator excellence Page 13 Safe and with industry-low emissions Page 18 World-class assets with industry-leading performance Page 29 Deliver high return projects on

  3. Slide 3: World-class oil and gas portfolio

    World-class oil and gas portfolio Large scale, low risk assets on the Norwegian Continental Shelf 2P reserves1 2C resources1 Production2 1.5bn 0.9bn 420 boe boe mboepd Skarv Johan Sverdrup Eiga area Valhall area Partner, 31.7% Operator, ~35-65% Operator, 90% Yggdrasil NOAKA Alvheim Oslo Eiga Alvheim

  4. Slide 4: Aker BP at a glance

    Aker BP at a glance Pure-play oil & gas company operating on the Norwegian Continental Shelf ✓ Experienced team driving performance and innovation. Collaborative, entrepreneurial and agile culture Distinct capabilities ✓ Alliance model with key suppliers. Execution excellence through shared incentiv

  5. Slide 5: Oil demand expected to grow for at least a decade

    Oil demand expected to grow for at least a decade Mobility and petrochemical demand offset structural declines in other sectors Global oil demand by sector ▪ Transport demand remains resilient, with passenger vehicles, trucks and aviation together adding more than 2 million boepd over the next decad

  6. Slide 6: Unlocking the NCS potential

    Unlocking the NCS potential Requires active exploration, high productivity and innovation Scenarios for Norwegian oil and gas production to 2050 Million boepd High scenario 5 ▪ High exploration activity with several larger discoveries ▪ Rapid technology deployment across fields 4 ▪ Strong utilisatio

  7. Slide 7: Distinct capabilities driving E&P operator excellence

    Distinct capabilities driving E&P operator excellence 7

  8. Slide 8: Our strategic priorities

    Our strategic priorities Operate safely, Decarbonise Deliver high return Establish the next Lead the E&P Return maximum efficiently and with our business, scope projects on quality, wave of profitable transformation with value to our low cost 1&2 GHG emission time and cost growth options digitalisat

  9. Slide 9: Performance culture – a key to success

    Performance culture – a key to success ▪ Experienced team with strong track record ▪ Creating the most attractive place to work in the industry ▪ Collaborating as One Team internally and across our partnerships ▪ Driving culture of continuous improvement & innovation ▪ Active and ambitious long- ter

  10. Slide 10: Strategic alliances with key suppliers

    Strategic alliances with key suppliers c f BP’ x c y Alliances established across the value chain ▪ Subsea, drilling, fixed installations, modifications ▪ C y f BP’ c Proven track record last decade ▪ 18 subsea tie-backs and 2 fixed platforms ▪ More than 100 wells completed ▪ Significant modificatio

  11. Slide 11: Digitalisation as a competitive differentiator

    Digitalisation as a competitive differentiator Turning a decade of digital investment into measurable advantage A decade-strong Tech and AI accelerating Scaling a proven data foundation performance today digital advantage High-quality, structured, real-time Faster exploration decisions, Higher speed

  12. Slide 12: Aker BP sets new benchmark in drilling on the NCS

    Aker BP sets new benchmark in drilling on the NCS Drilling alliances with excellent results Total well cost for NCS wells in 2023 & 20241 1,000 USD per meter ▪ 23 of 37 wellbores drilled were 60 in top quartile for cost per meter 50 ▪ The average performance of 40 BP’ f was also in top quartile 30 ▪

  13. Slide 13: Safe and with industry-low emissions

    Safe and with industry-low emissions 13

  14. Slide 14: Safety first

    Safety first Keeping people safe is top priority Injury frequency (TRIF)1 Serious incident frequency (SIF)2 2.6 2.4 2.0 1.8 1.7 0.7 0.4 0.3 0.3 0 2021 2022 2023 2024 2025 2021 2022 2023 2024 2025 1) TRIF: Number of recordable injuries per million working hours 2) SIF: Number of serious injuries per

  15. Slide 15: A global leader in low-emission oil and gas production

    A global leader in low-emission oil and gas production 120 100 Decarbonising our business Emission intensity 2025 Aker BP emission intensity, kg CO2e per boe1 kg CO2e per boe, equity share2 80 5.9 4.8 4.5 60 4.3 2.9 40 2.8 2.6 20 0 2019 2020 2021 2022 2023 2024 2025 20% 40% 60% 80% 100% 250 largest

  16. Slide 16: Aker BP's decarbonisation strategy

    BP’ c y Reducing absolute scope 1&2 GHG emissions before neutralising residual emissions Scope 1&2 Scope 3 Aker BP’s targets Identify cost-efficient 1. Reduce operated scope 1&2 Avoid Reduce Neutralise initiatives to reduce GHG GHG emissions with 50% by emissions in our supply 2030 and 90% by 2050 c

  17. Slide 17: Uniquely positioned to become GHG neutral by 2030

    Uniquely positioned to become GHG neutral by 2030 Aker BP to offset all our remaining emissions using high-quality carbon removal projects Total estimated equity share scope 1&2 emissions Our approach 1 000 tonnes CO2e 800 Avoid Thousands New assets with power from shore 600 Target 100% electrificat

  18. Slide 18: World-class assets with industry-leading performance

    World-class assets with industry-leading performance 18

  19. Slide 19: Production

    Production Delivered with industry-leading efficiency Oil & gas production per area Production efficiency1 1,000 mboepd 97% 97% 97% 481 94% 94% 93% 93% 95% 95% 95% 96% 96% 94% 453 450 444 448 444 449 88% 441 Top quartile on the NCS2: 415 415 414 411 above 88% 398 384 Ula area Alvheim area Skarv area

  20. Slide 20: Low cost – a competitive advantage

    Low cost – a competitive advantage Aker BP production cost Industry peers total operational cost1 USD per boe USD per boe, 2025 25 12.4 20 9.2 8.7 8.3 15 7.3 6.2 6.2 10 5 0 2019 2020 2021 2022 2023 2024 2025 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1) Source: Wood Mackenzie. Companies includ

  21. Slide 21: Reserves and resources

    Reserves and resources Year-end 2025 2P oil and gas reserves 2C contingent resources Skarv Skarv Alvheim Area Area 5% Discoveries Johan 18% Non-op 8% Sverdrup 27% 28% Eiga Area 10% Skarv Area 1,526 7% 866 mmboe Alvheim Area 5% mmboe Yggdrasil Eiga Area Valhall Area Valhall Area 11% 27% 20% 22% Yggdr

  22. Slide 22: Johan Sverdrup – a world class field

    Johan Sverdrup A world class field Total reserves Gross production 2025 Production cost GHG emissions Aker BP ~2.7 731 ~$2 <1 kg 31.7% billion boe 1,000 bbl per day per boe CO2e per boe interest 22

  23. Slide 23: Johan Sverdrup consistently exceeding expectations

    Johan Sverdrup consistently exceeding expectations Approx. 15% more cumulative volume than original plan mboepd, gross 800 700 600 500 400 300 200 100 - 2019 2020 2021 2022 2023 2024 2025 Actual production Original plan Aker BP holds 31.6% ownership in the Johan Sverdrup Unit operated by Equinor 23

  24. Slide 24: Johan Sverdrup – a world-class field

    Johan Sverdrup – a world-class field Continued excellent Redetermination Phase-3 sanctioned with operational performance process completed start up expected end 2027 World-class asset with Aker BP ownership Phase-4 maturing with low cost and low emissions increased to 31.7163% potential start-up in

  25. Slide 25: Alvheim area: A story of profitable growth

    Alvheim area A story of profitable growth Recoverable volumes nearly quadrupled from original PDO estimate The blueprint for a successful area strategy Total reserves in the Alvheim area Gross, million boe Maximising production efficiency Tyrving 800 KEG ▪ High-performance team Frosk ▪ Robust and fl

  26. Slide 26: Skarv area: High-performing gas hub in prospective area

    Skarv area High-performing gas hub in prospective area Top-performing asset Total reserves in the Skarv area Gross, million boe ▪ Industry-leading production efficiency ▪ High-capacity FPSO with a long asset life 900 ▪ Strong, high-performing team 800 Strategic transformation 700 ▪ Aker BP became th

  27. Slide 27: Valhall area: Continued development of a North Sea giant

    Valhall area Continued development of a North Sea giant Approx. 1.1 billion barrels produced – aiming for 2 billion Projects delivered on plan Total resources in the Valhall area Gross, million boe ▪ Hod and Valhall Flank West ▪ Decommissioning and P&A 2 000 PWP/Fenris transforming Valhall into area

  28. Slide 28: Eiga area: Doubling of recoverable resources

    Eiga area Doubling of recoverable resources from original PDO plans Growing value organically Total reserves in the Eiga area Gross, million boe ▪ Improved subsurface understanding ▪ Accelerated production and plateau prolonged 800 ▪ Refilling host capacity through tie-ins and infill campaigns 700 R

  29. Slide 29: Deliver high-return projects on quality, time and cost

    Deliver high-return projects on quality, time and cost 29

  30. Slide 30: Proven track record for project execution

    Proven track record for project execution Last 10 projects delivered on plan and with highly attractive economics ▪ Recent projects delivered together with our alliances1 ▪ ▪ Skarv (Ærfugl phase 1 and phase 2 & Gråsel) Valhall (Valhall Flank West & Hod redevelopment) <$30/bbl Average full-cycle ▪ Ei

  31. Slide 31: Field developments driving growth and value creation

    Field developments driving growth and value creation Tie-back projects at Yggdrasil Valhall PWP/Fenris Net ~450 mmboe Net ~220 mmboe Alvheim, Skarv and Eiga Net ~170 mmboe ▪ New area hub with several discoveries ▪ Modernising Valhall field centre and enabling ▪ Nine tie-backs to existing infrastruct

  32. Slide 32: Two subsea tie-backs successfully on stream this year

    Two subsea tie-backs successfully on stream this year Aker BP proves yet again its edge in project execution on the NCS Strong partnerships enabling developments with safe deliveries, high quality and fast execution January - Solveig Phase 2 on stream ▪ On schedule Solveig Edvard Grieg ▪ Subsea tie-

  33. Slide 33: Delivering highly profitable tie-backs at accelerated pace

    Delivering highly profitable tie-backs at accelerated pace In total ~170 mmboe net to Aker BP with excellent economics 2021 2022 2023 2024 2025 2026 2027 50% Kobra East & Gekko 4 months ahead PDO Plan IRR @ $70/boe PDO Plan Alvheim Frosk On time PDO Plan Tyrving 4 months ahead Hanz On time FID Plan

  34. Slide 34: Development projects

    Development projects Key milestones delivered ▪ Subsea tie-back programme nearing completion ▪ Skarv Satellites start-up in August ▪ Yggdrasil progressing towards 2027 start-up ▪ Power-from-shore commissioned, Hugin B installed ▪ Hugin A sailaway scheduled for December ▪ Updated investment estimate

  35. Slide 35: Yggdrasil – the new area development blueprint

    Yggdrasil – the new area development blueprint Omega Alfa discovery Volume ambition Start-up ~115 > 1,000 2027 Gross mmboe Gross mmboe 35

  36. Slide 36: Unlocking new volumes at Yggdrasil

    Unlocking new volumes at Yggdrasil East Frigg development sanctioned in Q2 Major oil discovery at Omega Alfa in Q3 • Multi-target exploration well with recoverable volumes estimated at 96–134 mmboe • Total of 45,000m drilled – including 40,000m in reservoir sections and the three longest well branch

  37. Slide 37: The Omega Alfa oil discovery

    The Omega Alfa oil discovery Highly Rapidly Further valuable barrels progress upside with low BE oil price into concept studies potential 37

  38. Slide 38: Targeting over 1 billion barrels

    Targeting over 1 billion barrels Yggdrasil built for substantial long-term upside Substantial upside potential ▪ Initial estimate of ~650 mmboe increased to ~800 mmboe with East Frigg and Omega Alfa ▪ Additional prospectivity identified, further exploration planned ▪ Resource ambition raised to >1 b

  39. Slide 39: Yggdrasil – project overview

    Yggdrasil – project overview New North Sea area hub by joining forces across licences Aker BP Hugin Unit: 76.7% Gas ~40% of (operator) Hugin Satellites: 87.7% estimated volumes Munin: 50.0% Fulla: 47.7% Power supply Partners Equinor and ORLEN from shore Upstream Norway East Frigg Munin Unmanned prod

  40. Slide 40: Valhall PWP-Fenris – increasing volumes and value creation

    Valhall PWP-Fenris – increasing volumes and value creation New production and wellhead platform expanding capacity and field life + tie back of Fenris gas discovery New well Fenris + IOR wells Total project volume Start-up +30-35 > 220 2027 mmboe (net) mmboe (net) 40

  41. Slide 41: Valhall PWP-Fenris – project overview

    Valhall PWP-Fenris – project overview Unlocks new volumes and secures life-time extension on Valhall Aker BP Valhall: 90.0% Establishes Valhall PWP WP/IP PH (operator) Fenris: 77.8% as area gas-hub Partners ORLEN Upstream Power supply Norway and INPEX from shore Idemitsu Norway Valhall Volume estima

  42. Slide 42: Skarv Satellites – project overview

    Skarv Satellites – project overview Investments in future flexibility enabling further area development Aker BP Alve North: 58.1% Gas ~70% of (operator) Idun North: 23.8% estimated volumes Ørn: 30.0% Partners Equinor, Harbour Energy, Low operational Japex and ORLEN cost Upstream Norway Volume estima

  43. Slide 43: Eiga area projects are in production

    Eiga area projects are in production Increased capacity utilisation at Ivar Aasen and Edvard Grieg platforms Aker BP Solveig Ph. II: 65.0% Adds low-cost (operator) Symra: 50.0% production Partners Equinor, Harbour Energy, Unlocks potential OMV and DNO Norge future developments Solveig Volume estimat

  44. Slide 44: Alvheim projects are in production

    Alvheim projects are in production Unlocks new volumes, reduces unit cost and secures life-time extension on Alvheim Aker BP Frosk: 80.0% Tie-backs to existing (operator) KEG: 80.0% infrastructure Tyrving: 61.3% Accounts for ca. 50% Partners Concedo, ConocoPhillips, of net Alvheim Petoro, ORLEN Upst

  45. Slide 45: Large opportunity set with clear pathway for profitable growth

    Large opportunity set with clear pathway for profitable growth 45

  46. Slide 46: A large NCS opportunity set

    A large NCS opportunity set Building on our distinct capabilities and world-class assets 5 M&A + Further Stand-alone discoveries value upside 4 Near-field exploration (ILX) 3 Two-billion-barrel- Billion boe 2C resources opportunity 2 Improved base (IOR) 1 Current producing assets (2P reserves) Effic

  47. Slide 47: Maintaining production above 500 mboepd into the 2030s

    Maintaining production above 500 mboepd into the 2030s Base production and ongoing projects Levers for value accretive 1,000 mboepd secure high production into the 2030s growth post-2030 900 M&A 800 (Asset & corporate) 700 Stand-alone discoveries 600 M&A ~525 and exploration Near-field 500 IOR/disco

  48. Slide 48: Exploration strategy

    Exploration strategy ▪ Attractive NCS exploration potential with up to 22 billion boe yet to be discovered1 ▪ Aker BP uniquely positioned with more than 200 licences – operating ~70% ▪ Leveraging new technology to drive performance and success rates ▪ Real-time exploration drilling ▪ AI-powered subs

  49. Slide 49: Aker BP in all the large discoveries

    Aker BP in all the large discoveries ~100 million barrels net to the company 2025 NCS exploration results1 Omega Alfa 38-48% Lofn/Langemann 40% Kjøttkake 45%2 Vidsyn Mistral South Zagato South Smørbukk Mid Drivis Tubåen Elgol Tyrihans East E-prospect Talisker F-South Goliat North Camilla North Skred

  50. Slide 50: 2026 exploration programme

    2026 exploration programme Aker BP Gross volume Licence Prospect Operator Timing share (mmboe) Johan Tonjer / Geitungen Equinor 32% 20 - 30 Discovery Sverdrup PL1148 Carmen appraisal Wellesley 10% 20 - 110 Appraised PL782S Linga Equinor 40% 10 - 50 Ongoing PL1153 Alpehumle Aker BP 40% 10 - 190 Ongoi

  51. Slide 51: A new NCS reality

    A new NCS reality Still large resource potential on the NCS, but smaller discoveries and more complex reservoirs Aker BP with proven project development capabilities ▪ Alliance model with suppliers ▪ Adoption of new technologies ▪ Relentless push on digitalisation New reality calls for bold next ste

  52. Slide 52: Reinforcing the next-generation field developments

    Reinforcing the next-generation field developments Our ambition: halve the time from discovery to first oil and drive cost efficiency at similar magnitude 1 2 3 Solutions Workflows Integration ▪ Scaling standardised, leaner and ▪ Re-thinking workflows from ▪ Further enhancing how we work repeatable

  53. Slide 53: Creating value at our hubs, while innovating to unlock new plays

    Creating value at our hubs, while innovating to unlock new plays Examples for shaping the future of the NCS Skarv area ▪ Reserves 2x since the start with developments like Ærfugl and Skarv Satellites ▪ Several new discoveries with an ambition to ad resources faster and with lower cost for keeping pr

  54. Slide 54: Entering Ringvei Vest – development concept agreed

    Entering Ringvei Vest – development concept agreed Alignment of interest for fast-track development and strengthening our position in the area ▪ Aker BP to acquire 19% interest in Troll A Ringvei Vest area licence portfolio1 Troll B Troll C ▪ Alignment of interests across the licences, supporting co

  55. Slide 55: Strengthening our position around Yggdrasil

    Strengthening our position UKCS NCS around Yggdrasil UK exposure adds scale and balance across Frigg area ▪ Aker BP to acquire 38.16% in licence P2343 covering UK part of the old Frigg field ▪ Prospectivity of Frigg was confirmed by the Omega Alfa oil discovery in 2025 Yggdrasil area P2343 ▪ The tra

  56. Slide 56: Wisting – on track for concept select this year

    Wisting – on track for concept select this year ~500 mmboe recoverable resources ▪ The largest undeveloped discovery on the NCS, located in Barents Sea ▪ Planned to be developed with FPSO with Equinor as operator ▪ Re-maturation of the project and strong improvements implemented ▪ Concept select lat

  57. Slide 57: Levers to shape our +2030 trajectory

    Levers to shape our +2030 trajectory Ongoing/potential projects and IOR opportunities Enhancing recovery in our existing asset base ▪ Infill drilling campaigns planned at all main hubs ▪ Testing basement and tight reservoirs Projects in Ongoing and planned execution infill campaigns 860 million boe

  58. Slide 58: 2025 - Adding highly valuable barrels through exploration

    2025 - Adding highly valuable barrels through exploration The three significant and commercial discoveries in the North Sea add ~100 million barrels net to Aker BP Kjøttkake Omega Alfa Lofn/Langemann March August December ▪ Gross volume of 39-75 mmboe ▪ Gross volume of 96-134 mmboe ▪ Gross volume of

  59. Slide 59: Proven track record of value accretive M&A

    Proven track record of value accretive M&A mboepd 500 Thousands 420k 400 300 ▪ Strategic fit ▪ Financially accretive 200 ▪ Efficient integration 100 ▪ Realise synergies & upsides 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 59

  60. Slide 60: Financial frame designed to maximise value creation and shareholder return

    Financial frame designed to maximise value creation and shareholder return 60

  61. Slide 61: Disciplined capital allocation

    Disciplined capital allocation Balancing financial strength, growth and shareholder returns 1.1 Financial capacity 2.2 Profitable growth 3.3 Shareholder returns Maintain financial flexibility and an Allocate capital to high-return, low Resilient and growing dividend in line investment grade credit p

  62. Slide 62: Optimising the capital structure

    Optimising the capital structure Aligning debt maturities with longevity of business profile Longer maturity at attractive terms 1 Bond maturities USD/EUR billion 10 10% 8 8% 1.75 Avg. years of maturity (bars) Aker BP cost (%) Interest rate (lines) 6 6% 4 4% 1.00 1.00 1.00 10y US treasury (%) New 0.

  63. Slide 63: Investments

    Investments Executed in the supportive Norwegian fiscal regime Aker BP est. capex before and after tax1 USD billion ▪ Investment plan updated to reflect new estimates 8 on completion of major projects: 7 ▪ Yggdrasil USD 12.5-13 billion (12.1) 6 5 ▪ Valhall PWP-Fenris USD 7.3-7.6 billion (7.0) 4 ▪ Ma

  64. Slide 64: Resilient cash flow and leverage profile across oil price scenarios

    Resilient cash flow and leverage profile across oil price scenarios Cumulative free cash flow1 Leverage ratio2 USD billion After dividends 14 3.5 $90/boe 3.0 12 10 2.5 $65/boe 8 2.0 6 1.5 Stress-test at $50/boe 4 1.0 $65/boe 2 0.5 $90/boe - - 2025 2023-25 2026 2027 2028 2025 2026 2027 2028 Illustrat

  65. Slide 65: Maintaining a strong balance sheet and financial capacity

    Maintaining a strong balance sheet and financial capacity Net interest-bearing debt1 + tax payable Leverage ratio2 Available liquidity3 Excl. leases, USD billion Targeting below 1.5 over time USD billion 1.6 1.2 6.0 5.9 6.0 1.9 5.6 1.1 5.4 1.6 1.8 0.9 0.7 0.6 0.6 0.6 6.4 0.5 3.0 6.0 5.7 0.5 2.6 2.6

  66. Slide 66: Resilient dividend growth

    Resilient dividend growth USD 0.6615 paid in the quarter Dividends USD per share Paid 2.65 2.52 Planned 2.40 2.20 ▪ Low-cost production and cash flow provide 2.00 Q4 resilient dividend capacity Q3 ▪ Distributions reflect capacity through the cycle 1.35 1.18 ▪ Ambition to grow the dividend with minim

  67. Slide 67: Near-term tax payments

    Near-term tax payments Payment sensitivity for H1-2027 USD million 1 800 1 600 1 400 Payment schedule ▪ Ten tax instalments per year with 1 200 no payments in January and July 1 000 800 $90 H1-27 sensitivity analysis 600 $90 ▪ Oil price: USD 70 and 90 per barrel 400 $70 ▪ Gas price: USD 15 per MMBtu

  68. Slide 68: 2026 guidance

    2026 guidance Previous Actual New guidance Jan-June guidance Production 370-400 391 380-400 mboepd Production cost ~8.0 8.2 ~8.0 USD/boe Capex 6.2-6.7 3.5 6.8-7.2 USD billion Exploration ~400 161 ~400 USD million Abandonment ~100 14 ~100 USD million 68

  69. Slide 69: Second quarter 2026

    Second quarter 2026 15 July 2026 Aker BP ASA

  70. Slide 70: Highlights

    Highlights ▪ Strong operational and financial delivery ▪ Major projects on track for 2027 start-up ▪ Portfolio positioned for growth ▪ Robust balance sheet maintained 70

  71. Slide 71: Q2 2026 operational performance

    Q2 2026 operational performance High efficiency in a quarter with planned maintenance Production Production cost Emissions mboepd / production efficiency (%) USD/boe kg CO2e/boe 95% 96% 96% 97% 94% 100% 500 90% 8.8 7.9 3.1 415 414 7.6 7.7 411 3.0 80% 398 7.3 2.9 384 2.8 2.7 400 70% 60% 300 50% 40% 2

  72. Slide 72: Q2 2026 financial performance

    Q2 2026 financial performance Produced and sold volume (1,000 boepd) Production cost (USD per boe) $105 per boe (82) Production Sales 415 414 411 8.8 398 384 7.9 7.3 7.6 7.7 414 431 396 406 376 Net realised price $2.1 (0.3) Q2-25 Q3-25 Q4-25 Q1-26 Q2-26 Q2-25 Q3-25 Q4-25 Q1-26 Q2-26 FCF per share Ne

  73. Slide 73: High realised prices

    High realised prices Brent dated vs front month contract Aker BP Q2 achieved oil price vs front month contract USD/barrel USD/barrel 150 $110 $2 $108 $104 125 $97 100 75 50 25 - January February March April May June Front Brent Premiums Achieved NGL price Achieved month Dated & timing oil price effe

  74. Slide 74: Sales of oil and gas

    Sales of oil and gas Volume sold Realised prices Total income mboepd USD/boe USD million 108 3 682 431 414 406 431 396 59 376 3 026 58 53 56 82 54 88 2 584 2 599 2 560 387 69 70 80 63 360 327 321 67 63 59 3 164 356 372 340 352 322 2 605 2 170 2 199 2 163 Q2-25 Q3-25 Q4-25 Q1-26 Q2-26 Q2-25 Q3-25 Q4-

  75. Slide 75: Income statement

    Income statement USD million Q2 2026 Q1 2026 Before Before impairment Impairments Actual impairment Impairments Actual 376 mboepd (406) Total income 3 682 3 682 3 026 3 026 Production expenses 267 267 297 297 Other operating expenses 18 18 19 19 Oil and gas sales EBITDAX 3 398 3 398 2 710 2 710 Expl

  76. Slide 76: Cash flow statement

    Cash flow statement USD million Q2-26 Q1-26 Q4-25 Q3-25 Op. CF before tax and WC changes 3 404 2 799 2 175 2 369 Net taxes paid (504) (315) (458) (295) Changes in working capital 222 (471) (131) (51) $3.1 bn (2.0) Cash flow from operations 3 123 2 013 1 586 2 023 Cash flow from operations Adj. Cash

  77. Slide 77: Balance sheet

    Balance sheet USD million Assets 30.06.26 31.03.26 31.12.25 PP&E 28 254 26 655 25 451 Goodwill 11 268 11 268 11 268 Other non-current assets 2 910 3 579 2 943 $6.0 bn (5.4) Cash and cash equivalent 2 492 1 862 2 344 Total available liquidity Other current assets 2 764 3 082 2 801 Total Assets 47 687

  78. Slide 78: The Norwegian petroleum tax system

    The Norwegian petroleum tax system An overview ▪ Stable 78% tax rate, consisting of corporate tax (CT) and special petroleum tax (SPT) Ordinary tax system ▪ Cash flow-based tax system from 2022 ▪ Immediate deductions for offshore investments in SPT and refund of tax losses ▪ An additional 12.4 % ded

  79. Slide 79: Technical goodwill explained

    Technical goodwill explained Accounting effect arising from M&A transactions Illustrative example of goodwill formation and impairments Step 1 Step 2 Step 3 The M&A Deferred tax leads to The balance transaction technical goodwill sheet Deferred tax Technical goodwill ▪ Technical goodwill, allocated

  80. Slide 80: Disclaimer

    Disclaimer This Document includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Document are based on current expectations, estimates and projections about globa

  81. Slide 81: www.akerbp.com

    AkerBP www.akerbp.com