Slide 1: Scotiabank Mining Conference
Scotiabank Mining Conference December 1-2, 2015 Steve Letwin President & CEO TSX: IMG NYSE: IAG
Slide 2: Cautionary Statement on Forward-Looking Information
Cautionary Statement on Forward-Looking Information All information included in this presentation, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than state
Slide 3: Strong Foundation Enables Adaptability and Flexibility
Strong Foundation Enables Adaptability and Flexibility Four producing >$175M cost Strong balance Robust gold mines on reductions since sheet - $780M in exploration three continents 2013 cash & bullion portfolio Near Term Strategy • Further reduce costs by mine optimization, productivity improvements
Slide 4: Strong Financial Position
Strong Financial Position $783M cash, cash equivalents and gold bullion $500M $633M $635M long-term debt due 2020 1 $1,283M As at Sep 30, 2015 In discussions to refinance and extend credit facility 2 Net Debt/EBITDA (TTM)3 0x $150M Cash & Cash Equivalents Net Cash $148M Gold Bullion at Market Unused
Slide 5: Disciplined Capital Spending
Disciplined Capital Spending 800 54% of the decrease from 2014 to 2015 due to 700 $669M reduced spending on gold assets; balance due to sale 600 of Niobec. 500 $ Millions Development / 400 Expansion $325M 300 Sustaining $230M 1 200 100 0 2013 2014 2015 Guidance 1 Plus or minus 10% 5
Slide 6: All-In Sustaining Costs
All-In Sustaining Costs1,2 1,400 All figures in $/oz. sold 1,272 1,221 1,200 1,201 1,194 1,121 3 1,115 1,113 1,076 3,4 1,000 1,021 1,027 3,4 800 600 400 200 0 ` Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Total Cash Costs1,2 Average Realized Gold Price1 1 This is a non-GAAP measure. Refer to the non-GAA
Slide 7: Debt Covenant Requirements - Use of Proceeds
Debt Covenant Requirements - Use of Proceeds Under the indenture governing IAMGOLD’s senior unsecured notes, the proceeds of certain asset sales are to be used to reinvest, or commit to reinvest, in its business within 365 days after the date of sale. After that period, if 1. there remains proceeds
Slide 8: Operations Review
Operations Review #1AMGOLD
Slide 9: Essakane – Burkina Faso
Essakane – Burkina Faso 120 1250 Open-pit mine in 5th year of production; 10 years remaining 1149 April 2015 – updated resource estimate at Falagountou increased indicated resources by 84% to 613,000 oz. and grade by 10% to 1022 1.5 g/t Au 100 988 955 1000 › Expected to extend Essakane’s peak pr
Slide 10: Rosebel – Suriname
Rosebel – Suriname 100 1250 Multiple open-pit mine 1104 1111 Produced ~4 million ounces in first 11 years 90 1048 1037 Hard rock comprises ~32% of ore mix and will increase to 80% by 2018 80 1000 916 Joint venture with Government of Suriname to target 70 higher-grade, softer rock › >$0.11/kW
Slide 11: Westwood – Canada
Westwood – Canada 40 1751 Commercial production July 1, 2014 Thorough review following seismic event on May 26 completed by th 35 1507 1600 internal and external experts › Study reviewed seismic history, stress distribution and mine sequencing 30 1119 › Developed recovery plan for rehabilitation
Slide 12: Sadiola – Mali
Sadiola – Mali 25 1200 1077 1100 Open-pit mine has produced 7M oz. over 20 years Decline in cash costs for 2015 due to lower fuel and consumable prices and favourable FX rates 20 914 1000 RC drilling program testing oxide targets; encouraging results Potential to continue mining and milling
Slide 13: Exploration Review
Exploration Review s1AMGOLD
Slide 14: Monster Lake (Quebec) – JV with TomaGold
Monster Lake (Quebec) – JV with TomaGold • October 30, 2015 - Amended earn-in option agreement with TomaGold › Acquired 50% interest in exchange for C$3.2M cash payment Monster Lake › Option to increase interest to 75% with further C$10M in exploration expenditures by 2021 • June 25, 2015 - Highligh
Slide 15: Siribaya (Mali) – JV with Merrex Gold
Siribaya (Mali) – JV with Merrex Gold • Focused on Diakha prospect - extension of trend hosting Boto Gold deposit Fekola -B2Gold • Highlights from infill delineation drilling 4.3Moz @ 2.16 g/t Au* completed in H1/15 include: Boto-Malikoundi › 34 m at 11.99 g/t Au, including 18 m at 18.10 Mali 1.2Moz
Slide 16: Boto Gold Project (Senegal)
Boto Gold Project (Senegal) • Estimated indicated resource of 1.2 M oz at 1.7 g/t Au and inferred resource of 0.64 M oz at 1.8 g/t Au • Infill drilling at Malikoundi deposit completed Q2/15 Deposit • July 20, 2015 - Final 2015 assay results reported include: Open › 36 m at 3.59 g/t Au, including 7 m
Slide 17: Pitangui Project (Brazil)
Pitangui Project (Brazil) • April 2014 – maiden inferred resource estimate of 0.64 M oz at 4.88 g/t Au • Assay results highlights reported July 7, 2015: › 11.9 m at 6.84 g/t Au, including 3.5 m at 17.02 g/t Au › 7.6 m at 9.78 g/t Au and 4.4 m at 16.56 g/t Au › 7.4 m at 8.12 g/t Au > 40M oz. historic
Slide 18: Eastern Borosi (Nicaragua) – JV with Calibre Mining
Eastern Borosi (Nicaragua) – JV with Calibre Mining • Drilling program in 2015 focused on further testing discoveries from 2014 as well as exploring additional vein systems • Q3/15 received final assay results from diamond drilling in Q2/15 • May 6, 2015 – Blag vein system drilling1: Bonanza E. Boro
Slide 19: Thank you
Thank you TSX: IMG NYSE: IAG
Slide 20: Appendices
Appendices CORPORATION
Slide 21: 2015 Capital Expenditure Outlook
2015 Capital Expenditure Outlook 1 Development/ ($ millions) Sustaining Expansion Total (Non-sustaining) Rosebel 65 10 75 Essakane 55 5 60 Westwood 20 60 80 Total gold segments 140 75 215 Côté Gold - 5 5 Total consolidated 140 80 220 Joint ventures 5 5 10 Total (±10%) 145 85 230 1 Does not include c
Slide 22: 2015 Production and Cost Guidance
2015 Production and Cost Guidance 1 2 Previous Revised Rosebel (000s oz.) 290 - 300 290 – 300 Essakane (000s oz.) 360 - 370 365 - 380 Westwood (000s oz.) 60 - 75 55 - 65 Total owner-operated production (000s oz.) 710 - 745 710 - 745 Joint ventures (000s oz.) 70 70 Total attributable production (000s
Slide 23: Capitalization
Capitalization Position (as at September 30, 2015) M$ Cash and cash equivalents 633 Bullion (at market) 151 LTD - senior unsecured notes 635 Shareholder’s Equity (incl. non-controlling interests) 2,620 Total Capitalization 3,255 Net Cash 149 Credit Metrics EBITDA (TTM) $240M Net Debt/EBITDA (TTM)1 0
Slide 24: Taxes & Royalties
Taxes & Royalties Africa Americas Burkina Faso Mali Canada Suriname 36% includes 17.50% Quebec mining duty taxes which Corp. Tax Rate 30% 36% are deductible for mining tax Statutory corporate income tax rate of 27.5% purposes less 10% per Mining Agreement 6.5% (Au price 3%- Au price <$1000/oz >$425/
Slide 25: Summary of Outstanding Derivative (Hedge) Contracts
Summary of Outstanding Derivative (Hedge) Contracts1 Contracts 2015 2016 2017 2018 Foreign currency Canadian dollar contracts (M of C$) 30.0 90.0 – – Contract rate range (C$/$) 1.12 – 1.17 1.12 – 1.29 – – Hedge ratio2 38% 30% – – Euro contracts (M of €) 9.0 18.0 – – Contract rate range ($/€) 1.21 –