Aruma Resources Limited · ASX:AAJ
Aruma Resources — Paydirt's Gold Conference 2012
24 slides from Aruma Resources's conference presentation, Apr 19, 2012
Slide 1: Aruma Resources – Under Cover Exploration
For personal use only ARUMA RESOURCES UNDER COVER EXPLORATION Peter Schwann Aruma Resources Limited – Paydirt’s Gold Conference Managing Director 19 April 2012 www.arumaresources.com.au ASX: AAJ
Slide 2: Disclaimer / Competent Person's Statement
Disclaimer /Competent Person’s Statement For personal use only The information in this presentation: was prepared with due care and attention and is current at the date of the presentation; is not an offer or recommendation to purchase or subscribe for securities in Aruma Resources Limited or to
Slide 3: Company Rationale
Company Rationale For personal use only • FOCUSSED ON GOLD IN W.A. • BUILDING A REGIONAL HUB AROUND GLANDORE • USING HYVISTA, PIMA AND FLUID FLOW STUDIES • UTILISING THIS NEW TECHNOLOGY TO – Test previously explored areas with known gold mineralisation – Test covered extensions of known gold mineral
Slide 4: Company Snapshot
Company Snapshot For personal use only Paul Boyatzis – Non Executive Chairman Strengths in capital and equity markets. Peter Schwann – Managing Director Experienced geologist in exploration and mining Ki Keong Chong – Non Executive Director Established Lawyer in Asian Finance and Investment Banking
Slide 5: Project Locations
Project Locations For personal use only Glandore Project 40km east of Kalgoorlie-Boulder Glandore Hub (60km radius) – Glandore, Bulong, Kurnalpi South and Gindalbie projects totalling over 500km2 Jundee South Project 20km south of Jundee Mine Twin Hills Project 15km Anomalies ready to dr
Slide 6: Glandore Gold Project
Glandore Gold Project For personal use only Land area >57km2 Strong gold system 5 Fluid Flow Targets On major feeder structures PoWs submitted Mining leases granted Ready for Drilling www.arumaresources.com.au ASX: AAJ
Slide 7: Thickness and Grade
Thickness and Grade For personal use only Location Intersection From Axial Planar Fault** 10m at 10.27 g/t Au 58m 4m at 18.8 g/t Au 103m Supergene Zone** 8m at 10.4 g/t Au 18m (**Both these zones 9m at 8.37 g/t Au 17m at the northern end 9m at 3.43 g/t Au 15m Of Initial Leases) 2m at 43 g/t Au 38m 5
Slide 8: Glandore drilling targets from Fluid Flow
Glandore drilling targets from Fluid Flow For personal use only Major Structures in Blue Warm Colours show gold targets Fluid Flow Study Completed PoW in for evaluation of targets www.arumaresources.com.au ASX: AAJ
Slide 9: Glandore drilling targets on Google Earth
Glandore drilling targets on Google Earth For personal use only Major Structures in Blue Warm Colours show gold targets Yellow ellipses define Primary Targets Historic intersections in Gold solids PoW in for evaluation of targets www.arumaresources.com.au ASX: AAJ
Slide 10: Regional Projects
Regional Projects Twin Hills For personal use only 2400m RAB just completed, RC PoW submitted Gindalbie PoW Approved, awaiting Heritage Survey Laverton East Northern Leases has Hyvista trends to drill Jundee South Drilling of two gold zones, assays to 18.6g/t Darlot East Leases granted a
Slide 11: Additional Lease Areas Acquired
Additional Lease Areas Acquired For personal use only New leases in a 60km radius of Glandore www.arumaresources.com.au ASX: AAJ
Slide 12: Twin Hills Project
Twin Hills Project For personal use only Project Holding 187km2 15km of defined gold anomalies Thick underexplored mineralisation Hole ID From Interval (m) g/t Au ppm Cu THR 301 25 22 1.04 NA THR 288 25 1 2.56 NA THR 331 50 20 0.54 NA WRC01 43 12 0.84 308 Including 53 1 1.79 2360 WRC03 32 28 0
Slide 13: Gindalbie Project
Gindalbie Project For personal use only Project Holding 150km2 45km north of Glandore New Lease in Yellow Chip samples up to 25 g/t Prospects structures on sediment-greenstone contact On major lineaments PoW approved Hyvista survey completed www.arumaresources.com.au ASX: AAJ
Slide 14: Kurnalpi South Project
Kurnalpi South Project For personal use only Christmas Well, Pineapple Dam, Pinnacles South and Steeple Hill 100km east of Kalgoorlie - Boulder Ni Cu Blebby sulphides at Steeple Hill Ni Cu Gossan on Pineapple Dam PoW submitted for Pinnacles South Large Projects north (Carosue) and south (A
Slide 15: Laverton East Project
Laverton East Project For personal use only New Lease Granted Leases under shallow cover Rock chips samples define mineralisation trend Hyvista maps goethite over Gold anomaly Next figure in black square Second pass drilling completed 2m at 4.28 g/t in LEAC 31 www.arumaresources.com.au
Slide 16: Laverton East Project – Hyvista Target
Laverton East Project – Hyvista Target For personal use only Red anomaly is Goethite-Mica Anomaly is 1km by 150m Hyvista maps goethite over Gold anomaly Drilling program split in two Drilling program 667 of AC/RC over Hyvista and Geochem area 1981m of Aircore over Phase 2 New Gold Zone
Slide 17: Jundee South Project
Jundee South Project For personal use only Drilling completed in December Drilling verifies two soil anomalies Best gold assay of 1m at 18.6 g/t Gourdis - Vause Gold structure is extended to the west Structural Disruption sites Identified Gold Mineralisation evident in Major structures
Slide 18: Patricia Project
Patricia Project For personal use only • Magnetics that indicate a 5km extension to the Edjudina Line (Red Dashed Line) • Under shallow soil cover, between granites • On a major E-W structure that cuts the Patricia gold mine to the east • Lease to be granted in July www.arumaresources.com.au ASX: AA
Slide 19: Darlot East Project
Darlot East Project • 4km east of multi million For personal use only ounce Darlot Mine • 7km Granite-Greenstone contact target • Gold hits in 1989 RC holes RW 1 - 1m @ 3.27g/t from 18m RW 2 - 4m @ 2.1g/t from 18m** RW 3 - 1m @ 0.75g/t from 25m RW 4 - 2m @ 0.33g/t from 25m RW 5 - 1m @ 10.2g/t from 2
Slide 20: Aruma's progress to date
Aruma’s progress to date Leases total 1000km2 For personal use only Fluid Flow and PoWs completed for Glandore Twin Hills option, PoW and clearing completed – drilling completed All new Projects now mapped by Hyvista with targets defined Drilling at Laverton East, Jundee South and Steeple
Slide 21: Aruma's Work Timeline
Aruma’s Work Timeline For personal use only 2010 July 23 – AAJ listed on ASX – Glandore PoW approved November – Glandore drilling results with 29/42 anomalous holes 11m @ 2.32g/t from surface 2011 January – Glandore drilling results include 2m of 4.77g/t 23 of 26 holes anomalous February – >2km mine
Slide 22: Aruma's Next Steps
Aruma’s Next Steps For personal use only GLANDORE • Fluid Flow Study defines targets on two major structures off the Majestic Structure • Initial drilling on the extension of the western target areas planned TWIN HILLS • RAB drilling on the extension of the northern lease anomalies completed Apr
Slide 23: Company Summary
Company Summary For personal use only Large prospective landholding in the proven Eastern Goldfields Projects strategically located adjacent to established gold producers Treasury at 19 April 2012 ~$2.5M – current program well funded Steady progress: Drilling hits Gold mineralisation New
Slide 24: Thank you
For personal use only ARUMA RESOURCES Thank you. www.arumaresources.com.au ASX: AAJ