  1. Slide 1: Aruma Resources – Under Cover Exploration

    For personal use only ARUMA RESOURCES UNDER COVER EXPLORATION Peter Schwann Aruma Resources Limited – Paydirt’s Gold Conference Managing Director 19 April 2012 www.arumaresources.com.au ASX: AAJ

  2. Slide 2: Disclaimer / Competent Person's Statement

    Disclaimer /Competent Person’s Statement For personal use only The information in this presentation:  was prepared with due care and attention and is current at the date of the presentation;  is not an offer or recommendation to purchase or subscribe for securities in Aruma Resources Limited or to

  3. Slide 3: Company Rationale

    Company Rationale For personal use only • FOCUSSED ON GOLD IN W.A. • BUILDING A REGIONAL HUB AROUND GLANDORE • USING HYVISTA, PIMA AND FLUID FLOW STUDIES • UTILISING THIS NEW TECHNOLOGY TO – Test previously explored areas with known gold mineralisation – Test covered extensions of known gold mineral

  4. Slide 4: Company Snapshot

    Company Snapshot For personal use only Paul Boyatzis – Non Executive Chairman Strengths in capital and equity markets. Peter Schwann – Managing Director Experienced geologist in exploration and mining Ki Keong Chong – Non Executive Director Established Lawyer in Asian Finance and Investment Banking

  5. Slide 5: Project Locations

    Project Locations For personal use only  Glandore Project 40km east of Kalgoorlie-Boulder  Glandore Hub (60km radius) – Glandore, Bulong, Kurnalpi South and Gindalbie projects totalling over 500km2  Jundee South Project  20km south of Jundee Mine  Twin Hills Project  15km Anomalies ready to dr

  6. Slide 6: Glandore Gold Project

    Glandore Gold Project For personal use only  Land area >57km2  Strong gold system  5 Fluid Flow Targets  On major feeder structures  PoWs submitted  Mining leases granted  Ready for Drilling www.arumaresources.com.au ASX: AAJ

  7. Slide 7: Thickness and Grade

    Thickness and Grade For personal use only Location Intersection From Axial Planar Fault** 10m at 10.27 g/t Au 58m 4m at 18.8 g/t Au 103m Supergene Zone** 8m at 10.4 g/t Au 18m (**Both these zones 9m at 8.37 g/t Au 17m at the northern end 9m at 3.43 g/t Au 15m Of Initial Leases) 2m at 43 g/t Au 38m 5

  8. Slide 8: Glandore drilling targets from Fluid Flow

    Glandore drilling targets from Fluid Flow For personal use only  Major Structures in Blue  Warm Colours show gold targets  Fluid Flow Study Completed  PoW in for evaluation of targets www.arumaresources.com.au ASX: AAJ

  9. Slide 9: Glandore drilling targets on Google Earth

    Glandore drilling targets on Google Earth For personal use only  Major Structures in Blue  Warm Colours show gold targets  Yellow ellipses define Primary Targets  Historic intersections in Gold solids  PoW in for evaluation of targets www.arumaresources.com.au ASX: AAJ

  10. Slide 10: Regional Projects

    Regional Projects Twin Hills For personal use only  2400m RAB just completed, RC PoW submitted  Gindalbie PoW Approved, awaiting Heritage Survey  Laverton East Northern Leases has Hyvista trends to drill  Jundee South Drilling of two gold zones, assays to 18.6g/t  Darlot East  Leases granted a

  11. Slide 11: Additional Lease Areas Acquired

    Additional Lease Areas Acquired For personal use only New leases in a 60km radius of Glandore www.arumaresources.com.au ASX: AAJ

  12. Slide 12: Twin Hills Project

    Twin Hills Project For personal use only  Project Holding 187km2  15km of defined gold anomalies  Thick underexplored mineralisation Hole ID From Interval (m) g/t Au ppm Cu THR 301 25 22 1.04 NA THR 288 25 1 2.56 NA THR 331 50 20 0.54 NA WRC01 43 12 0.84 308 Including 53 1 1.79 2360 WRC03 32 28 0

  13. Slide 13: Gindalbie Project

    Gindalbie Project For personal use only  Project Holding 150km2  45km north of Glandore  New Lease in Yellow  Chip samples up to 25 g/t  Prospects structures on sediment-greenstone contact  On major lineaments  PoW approved  Hyvista survey completed www.arumaresources.com.au ASX: AAJ

  14. Slide 14: Kurnalpi South Project

    Kurnalpi South Project For personal use only Christmas Well, Pineapple Dam, Pinnacles South and Steeple Hill  100km east of Kalgoorlie - Boulder  Ni Cu Blebby sulphides at Steeple Hill  Ni Cu Gossan on Pineapple Dam  PoW submitted for Pinnacles South  Large Projects north (Carosue) and south (A

  15. Slide 15: Laverton East Project

    Laverton East Project For personal use only  New Lease Granted  Leases under shallow cover  Rock chips samples define mineralisation trend  Hyvista maps goethite over Gold anomaly  Next figure in black square  Second pass drilling completed  2m at 4.28 g/t in LEAC 31 www.arumaresources.com.au

  16. Slide 16: Laverton East Project – Hyvista Target

    Laverton East Project – Hyvista Target For personal use only  Red anomaly is Goethite-Mica  Anomaly is 1km by 150m  Hyvista maps goethite over Gold anomaly  Drilling program split in two  Drilling program 667 of AC/RC over Hyvista and Geochem area  1981m of Aircore over Phase 2  New Gold Zone

  17. Slide 17: Jundee South Project

    Jundee South Project For personal use only  Drilling completed in December  Drilling verifies two soil anomalies  Best gold assay of 1m at 18.6 g/t  Gourdis - Vause Gold structure is extended to the west  Structural Disruption sites Identified  Gold Mineralisation evident in  Major structures

  18. Slide 18: Patricia Project

    Patricia Project For personal use only • Magnetics that indicate a 5km extension to the Edjudina Line (Red Dashed Line) • Under shallow soil cover, between granites • On a major E-W structure that cuts the Patricia gold mine to the east • Lease to be granted in July www.arumaresources.com.au ASX: AA

  19. Slide 19: Darlot East Project

    Darlot East Project • 4km east of multi million For personal use only ounce Darlot Mine • 7km Granite-Greenstone contact target • Gold hits in 1989 RC holes RW 1 - 1m @ 3.27g/t from 18m RW 2 - 4m @ 2.1g/t from 18m** RW 3 - 1m @ 0.75g/t from 25m RW 4 - 2m @ 0.33g/t from 25m RW 5 - 1m @ 10.2g/t from 2

  20. Slide 20: Aruma's progress to date

    Aruma’s progress to date  Leases total 1000km2 For personal use only  Fluid Flow and PoWs completed for Glandore  Twin Hills option, PoW and clearing completed – drilling completed  All new Projects now mapped by Hyvista with targets defined  Drilling at Laverton East, Jundee South and Steeple

  21. Slide 21: Aruma's Work Timeline

    Aruma’s Work Timeline For personal use only 2010 July 23 – AAJ listed on ASX – Glandore PoW approved November – Glandore drilling results with 29/42 anomalous holes 11m @ 2.32g/t from surface 2011 January – Glandore drilling results include 2m of 4.77g/t 23 of 26 holes anomalous February – >2km mine

  22. Slide 22: Aruma's Next Steps

    Aruma’s Next Steps  For personal use only GLANDORE • Fluid Flow Study defines targets on two major structures off the Majestic Structure • Initial drilling on the extension of the western target areas planned  TWIN HILLS • RAB drilling on the extension of the northern lease anomalies completed Apr

  23. Slide 23: Company Summary

    Company Summary For personal use only  Large prospective landholding in the proven Eastern Goldfields  Projects strategically located adjacent to established gold producers  Treasury at 19 April 2012 ~$2.5M – current program well funded  Steady progress:  Drilling hits Gold mineralisation  New

  24. Slide 24: Thank you

    For personal use only ARUMA RESOURCES Thank you. www.arumaresources.com.au ASX: AAJ