Aruma Resources Limited · ASX:AAJ
Aruma Resources — RIU Sydney Resources Roundup 2026
14 slides from Aruma Resources's conference presentation, May 2026
Slide 1: This is the Tillex Copper Project
ASX : AAJ This is the Tillex Copper Project An emerging high-grade copper sulphide asset, Timmins Minerals District, Canada Aruma Resources Limited RIU Sydney Resources Roundup, May 2026 1
Slide 2: Disclaimer
DISCLAIMER DISCLAIMER AND FORWARD-LOOKING STATEMENTS COMPETENT PERSONS STATEMENT This presentation has been authorised for release by the Board of Aruma Resources Limited. It is not a The information in this report regarding exploration results, exploration targets and the mineral prospectus nor an
Slide 3: Corporate Snapshot
CORPORATE SNAPSHOT Share price Share price performance as at 1 May 2026 $0.013 1 May 2026 52 week high $0.04, low $0.007 Market capitalisation ~$9.5m 1 May 2026 Shares on issue 733.7m *Options Board and Management Major Shareholders 506m James Moses, Non-Executive Chairman Top 20: 29.16% Grant Fergu
Slide 4: Project Highlights
Project Highlights • Tillex Project is a well-defined high-grade copper sulphide deposit with major exploration potential; acquisition comes at a time of surging copper prices and strong supply-demand metrics for copper • Total of 10,283.6m of diamond drilling completed by previous operators, consis
Slide 5: Project Location & Infrastructure
Project Location & Infrastructure • Located in prolific Tier-1 Timmins mining district, Ontario, Canada; major gold producing region, significant VMS and strata-bound copper projects • 57km east of city of Timmins and ~60km from Glencore’s Kidd Creek Copper Project; produces ave. 40,000t Cu and 70,0
Slide 6: High-grade Copper & Silver Drilling Intersections
High-grade Copper & Silver Drilling Intersections Tillex Project discovered in 1973 and acquired by TSX-V listed Metals Creek Resources (MEK) in 2008 – 10,283.6m diamond drilling completed. Highlight copper and silver intersections from MEK drilling include; o 110m @ 1.69% Cu and 7.05g/t Ag from 34m
Slide 7: High-grade Copper & Silver Drilling Intersections
High-grade Copper & Silver Drilling Intersections o 42.46m @ 2.12% Cu and 53.45g/t Ag from 53.77m (TX11-008), incl; ▪ 5m @ 5.55% Cu and 355.30g/t Ag from 89m; and ▪ 36.25m @ 1.39% Cu and 14.96g/t Ag from 104m o 39.2m @ 1.91% Cu and 3.98g/t Ag from 31.80m (TX25-031), incl; ▪ 19.2m @ 3.39% Cu and 5.64
Slide 8: Plan view; high-grade copper & silver drilling intersections
Plan view; high-grade copper & silver drilling intersections “We are excited by the scale, geometry and growth potential of the Project, and by the strong body of high-grade results delivered to date. We see great potential for the discovery of additional strata- bound-hosted or VMS copper mineralis
Slide 9: EM Survey
EM Survey • Extensive EM Survey conducted by Aruma over majority of project area returns positive outcomes • The EM Survey has identified two significant EM conductors: • Main Conductor, incorporates the drill-defined high-grade Tillex Copper-Silver Deposit, defined over a strike length of 600m and
Slide 10: Maiden Diamond Drilling Program Commenced & Ongoing
Maiden Diamond Drilling Program Commenced & Ongoing • Maiden Drilling campaign commenced with an initial ~1,500m of diamond drilling. Diamond Drilling Program Targets: • Tillex’s high-grade copper mineralised footprint along strike, testing EM identified strike extensions; and • Depth extension pote
Slide 11: Project Strategy
Project Strategy Aruma is undertaking a dual, exploration and resource development, strategy; • expand the Project’s mineralised footprint along strike - to the north, south and west, and at depth; • test for similar parallel mineralised structures within the wider project area; and • confirm a maid
Slide 12: Aggressive Exploration Strategy to Drive Value
Aggressive Exploration Strategy to Drive Value Exciting game changing copper sulphide project; acquisition has generated a strong start to 2026, with the Company focused on significant expansion of known mineralisation • Tillex Copper-Silver Project Acquisition announced – 22 January 2026 • Tillex C
Slide 13: Works Program
Works Program ACTIVITY STATUS APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER Reinterpretation of historical geophysics Collection and relogging of available historical core Ground Based EM Diamond Drilling – Phase 1 Assay Results Diamond Drilling – Phase 2* Metallurgical Analysis *Diamond Drilling Pro
Slide 14: Contact Details
Contact Details Grant Ferguson, Managing Director Aruma Resources Limited Telephone: +61 401 479 740 E: info@arumaresources.com 14