Aurelia Metals Limited · ASX:AMI
Aurelia Metals — Corporate Update (November 2026)
21 slides from Aurelia Metals's corporate update, Nov 9, 2026

Slide 1: Peak/New Cobar CCC Presentation
Peak/New Cobar CCC Presentation 9 November 2026 ASX Code: AMI

Slide 2: Acknowledgement of Country
Acknowledgement of Country • Aurelia Metals Ltd respectfully acknowledges the Ngiyampaa Nation as the Traditional Custodians of this land – both past and present. • We know this land has history, custodians and stories, spanning tens of thousands of years, that endure to this day. • We pay our respe

Slide 3: July – September 2025 data CCC Presentation
July – September 2025 data CCC Presentation

Slide 4: Safety is at the core of our business
Safety is at the core of our business Work, Health and Safety July – September 2026 Peak Safety performance was less than desired for the quarter with 2 recordable injuries of low severity which required medical treatment (Stitches) and a lost time injury from a beam dropped on a workers ankle causi

Slide 5: Environment & Community
Environment & Community July – September 2026 ASX Code: AMI

Slide 6: Social licence to operate
Social licence to operate Seeking to deliver mutual benefit July – September 2026 • Fencing completed on the Great Cobar slag dump to provide tours at the Festival of the Miners Ghost • Cobar Camels fundraiser attended • Cobar Public School Spring fair activity • Participated in Tourism Advisory Com

Slide 7: Peak Mines Environmental Incidents, Complaints & Initiatives
Peak Mines Environmental Incidents, Complaints & Initiatives July – September 2026 • 1 complaint about unspecified operational concerns • 1 complaint about windscreen damage at the Kidman Way to Peak Way intersection July – September 2026 data CCC Presentation

Slide 8: July – September 2026 data CCC Presentation
July – September 2026 data CCC Presentation

Slide 9: Dust Deposition Gauges (EPL)
Dust Deposition Gauges (EPL) 7 6 5 Insoluble Solids (g/m2/month) 4 3 2 1 0 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Axis Title DM1 DM2 DM3 DM4 Bimbimbie Dellavale DM1 annual Ave DM2 Annual Ave DM3 Annual Ave DM4 Annual Ave Bimbimbie Annual Ave Dellvale Annu

Slide 10: Dust Deposition Gauges
Dust Deposition Gauges 4.5 4 3.5 3 Insoluble solids (g/m2/month) 2.5 2 1.5 1 0.5 0 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 GC1 GC2 GC3 GC4 GC1 annual Ave GC2 Annual Ave GC3 Annual Ave GC4 Annual Ave July – September 2026 data CCC Presentation

Slide 11: July - September 2026 Blast Vibration
mm/s 0 1 2 3 4 5 6 7 8 9 10 2/07/2026 4/07/2026 6/07/2026 8/07/2026 New Occ 10/07/2026 July – September 2026 data CCC Presentation 12/07/2026 14/07/2026 16/07/2026 Fort Bourke 18/07/2026 20/07/2026 22/07/2026 24/07/2026 Dellavale 26/07/2026 28/07/2026 30/07/2026 Salty 1/08/2026 3/08/2026 5/08/2026 7

Slide 12: Projects Update
Projects Update July – September 2026 ASX Code: AMI

Slide 13: Projects: Optimisation – Tails Thickener
Projects Optimisation –Tails Thickener

Slide 14: Great Cobar on budget and schedule
GREAT COBAR ON BUDGET AND SCHEDULE Fresh air raise (FAR) works mark the next major development milestone Image: Great Cobar long ‘section looking west | south-west showing Mine development of 506m for the quarter Total of 2,380m completed to date Surface collar foundation for raisebore rig completed

Slide 15: Great Cobar Development: FAR Collar Construction
Projects Great Cobar Development FAR Collar Construction • Project on track for December raise bore commencement at FAR • Construction of the Raise Bore Collar is now complete. • Mobilisation of the drill rig will commence Mid November

Slide 16: HV Access – Peak Way & Intersections
Projects HV Access – Peak Way & Intersections • Signage is on main road to Peak access. • Peak way sealing completed, • Signage and line marking will be completed once Kidman Way has settled.

Slide 17: Priory Tank Road
Projects Priory Tank Road • Priory Tank road has been completed. • Signage and line marking will be completed once settled.

Slide 18: New Cobar Fuel Bay / Wheel Wash
Projects New Cobar Fuel Bay / Wheel Wash • New Cobar Fuel bay is complete and will be tested then handed over for operational use. • Wheel wash is currently being installed • New Cobar Wheel wash exist has also been sealed.

Slide 19: Historic Dewatering
Projects Historic Dewatering • Electrical connection with Essential Energy in progress awaiting TfNSW to approve expecting approval Mid November • Electrical Infrastructure is installed and Pump will be installed once power supply from Essential Energy is established.

Slide 20: July – September 2025 data CCC Presentation
July – September 2025 data CCC Presentation

Slide 21: SSD 10419 MOD
Projects SSD 10419 MOD 1 Peak is seeking to modify SSD 10419 (MOD 1) pursuant to section 4.55(1A) of the EP&A Act, to make minor changes to the operation of the site to improve performance and safety. • Regulate approved APOs under SSD 10419 • Changes to Vent Raise 1 and Vent Raise 2 • Reconfigurati
Source: company website
More decks from Aurelia Metals Limited
Shareholder Meeting (November 2026)18 slides · Nov 17, 2026
Q1 FY27 Earnings Presentation12 slides · Oct 28, 2026
ASX Small and Mid-Cap Conference 202617 slides · Sep 23, 2026
FY2026 Earnings Presentation18 slides · Aug 27, 2026
Corporate Update (August 2026)25 slides · Aug 18, 2026
Corporate Update (August 2026)20 slides · Aug 17, 2026