Aurelia Metals Limited · ASX:AMI

Aurelia Metals — Corporate Update (November 2026)

21 slides from Aurelia Metals's corporate update, Nov 9, 2026

  1. Slide 1: Peak/New Cobar CCC Presentation

    Slide 1: Peak/New Cobar CCC Presentation

    Peak/New Cobar CCC Presentation 9 November 2026 ASX Code: AMI

  2. Slide 2: Acknowledgement of Country

    Slide 2: Acknowledgement of Country

    Acknowledgement of Country • Aurelia Metals Ltd respectfully acknowledges the Ngiyampaa Nation as the Traditional Custodians of this land – both past and present. • We know this land has history, custodians and stories, spanning tens of thousands of years, that endure to this day. • We pay our respe

  3. Slide 3: July – September 2025 data CCC Presentation

    Slide 3: July – September 2025 data CCC Presentation

    July – September 2025 data CCC Presentation

  4. Slide 4: Safety is at the core of our business

    Slide 4: Safety is at the core of our business

    Safety is at the core of our business Work, Health and Safety July – September 2026 Peak Safety performance was less than desired for the quarter with 2 recordable injuries of low severity which required medical treatment (Stitches) and a lost time injury from a beam dropped on a workers ankle causi

  5. Slide 5: Environment & Community

    Slide 5: Environment & Community

    Environment & Community July – September 2026 ASX Code: AMI

  6. Slide 6: Social licence to operate

    Slide 6: Social licence to operate

    Social licence to operate Seeking to deliver mutual benefit July – September 2026 • Fencing completed on the Great Cobar slag dump to provide tours at the Festival of the Miners Ghost • Cobar Camels fundraiser attended • Cobar Public School Spring fair activity • Participated in Tourism Advisory Com

  7. Slide 7: Peak Mines Environmental Incidents, Complaints & Initiatives

    Slide 7: Peak Mines Environmental Incidents, Complaints & Initiatives

    Peak Mines Environmental Incidents, Complaints & Initiatives July – September 2026 • 1 complaint about unspecified operational concerns • 1 complaint about windscreen damage at the Kidman Way to Peak Way intersection July – September 2026 data CCC Presentation

  8. Slide 8: July – September 2026 data CCC Presentation

    Slide 8: July – September 2026 data CCC Presentation

    July – September 2026 data CCC Presentation

  9. Slide 9: Dust Deposition Gauges (EPL)

    Slide 9: Dust Deposition Gauges (EPL)

    Dust Deposition Gauges (EPL) 7 6 5 Insoluble Solids (g/m2/month) 4 3 2 1 0 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Axis Title DM1 DM2 DM3 DM4 Bimbimbie Dellavale DM1 annual Ave DM2 Annual Ave DM3 Annual Ave DM4 Annual Ave Bimbimbie Annual Ave Dellvale Annu

  10. Slide 10: Dust Deposition Gauges

    Slide 10: Dust Deposition Gauges

    Dust Deposition Gauges 4.5 4 3.5 3 Insoluble solids (g/m2/month) 2.5 2 1.5 1 0.5 0 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 GC1 GC2 GC3 GC4 GC1 annual Ave GC2 Annual Ave GC3 Annual Ave GC4 Annual Ave July – September 2026 data CCC Presentation

  11. Slide 11: July - September 2026 Blast Vibration

    Slide 11: July - September 2026 Blast Vibration

    mm/s 0 1 2 3 4 5 6 7 8 9 10 2/07/2026 4/07/2026 6/07/2026 8/07/2026 New Occ 10/07/2026 July – September 2026 data CCC Presentation 12/07/2026 14/07/2026 16/07/2026 Fort Bourke 18/07/2026 20/07/2026 22/07/2026 24/07/2026 Dellavale 26/07/2026 28/07/2026 30/07/2026 Salty 1/08/2026 3/08/2026 5/08/2026 7

  12. Slide 12: Projects Update

    Slide 12: Projects Update

    Projects Update July – September 2026 ASX Code: AMI

  13. Slide 13: Projects: Optimisation – Tails Thickener

    Slide 13: Projects: Optimisation – Tails Thickener

    Projects Optimisation –Tails Thickener

  14. Slide 14: Great Cobar on budget and schedule

    Slide 14: Great Cobar on budget and schedule

    GREAT COBAR ON BUDGET AND SCHEDULE Fresh air raise (FAR) works mark the next major development milestone Image: Great Cobar long ‘section looking west | south-west showing Mine development of 506m for the quarter Total of 2,380m completed to date Surface collar foundation for raisebore rig completed

  15. Slide 15: Great Cobar Development: FAR Collar Construction

    Slide 15: Great Cobar Development: FAR Collar Construction

    Projects Great Cobar Development FAR Collar Construction • Project on track for December raise bore commencement at FAR • Construction of the Raise Bore Collar is now complete. • Mobilisation of the drill rig will commence Mid November

  16. Slide 16: HV Access – Peak Way & Intersections

    Slide 16: HV Access – Peak Way & Intersections

    Projects HV Access – Peak Way & Intersections • Signage is on main road to Peak access. • Peak way sealing completed, • Signage and line marking will be completed once Kidman Way has settled.

  17. Slide 17: Priory Tank Road

    Slide 17: Priory Tank Road

    Projects Priory Tank Road • Priory Tank road has been completed. • Signage and line marking will be completed once settled.

  18. Slide 18: New Cobar Fuel Bay / Wheel Wash

    Slide 18: New Cobar Fuel Bay / Wheel Wash

    Projects New Cobar Fuel Bay / Wheel Wash • New Cobar Fuel bay is complete and will be tested then handed over for operational use. • Wheel wash is currently being installed • New Cobar Wheel wash exist has also been sealed.

  19. Slide 19: Historic Dewatering

    Slide 19: Historic Dewatering

    Projects Historic Dewatering • Electrical connection with Essential Energy in progress awaiting TfNSW to approve expecting approval Mid November • Electrical Infrastructure is installed and Pump will be installed once power supply from Essential Energy is established.

  20. Slide 20: July – September 2025 data CCC Presentation

    Slide 20: July – September 2025 data CCC Presentation

    July – September 2025 data CCC Presentation

  21. Slide 21: SSD 10419 MOD

    Slide 21: SSD 10419 MOD

    Projects SSD 10419 MOD 1 Peak is seeking to modify SSD 10419 (MOD 1) pursuant to section 4.55(1A) of the EP&A Act, to make minor changes to the operation of the site to improve performance and safety. • Regulate approved APOs under SSD 10419 • Changes to Vent Raise 1 and Vent Raise 2 • Reconfigurati