Agnico Eagle Mines Limited · TSX:AEM

Agnico Eagle Mines — Gold Forum Americas 2022

44 slides from Agnico Eagle Mines's conference presentation, Sep 20, 2022

  1. Slide 1: Gold Forum Americas

    Gold Forum Americas September 18-21, 2022

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information in this presentation has been prepared as at September 15, 2022. Certain statements contained in this presentation constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-

  3. Slide 3: Strong Track Record of Value Creation

    STRONG TRACK RECORD OF VALUE CREATION Building a Portfolio of High-Quality Assets in Premier Mining Regions that Offer Superior Geological Potential 2005 - 2007 2008 - 2012 2013 - 2016 2017 - 2021 2022 - 2024 Acquisitions in Early- Construction of 5 Mines Consolidating the Abitibi Strengthening the

  4. Slide 4: Superior Leverage to the Gold Price on a Risk-Adjusted Basis

    SUPERIOR LEVERAGE TO THE GOLD PRICE ON A RISK-ADJUSTED BASIS  Continuing to build a profitable, high-quality, low-risk business based on:  Leading position in some of the world’s best gold mining jurisdictions as measured by: • Multi-mine, multi-decade geologic potential • Multi-decade political s

  5. Slide 5: Low-Risk Geographic Exposure

    LOW-RISK GEOGRAPHIC EXPOSURE Focused on Premier Mining Jurisdictions in North America, Europe and Australia 50.0 Moz Gold Reserves1 Quebec Mexico 13% Finland 2% 8% Australia 4% Ontario Nunavut 54% 19% 3.3 Moz Gold Production in 2022 (Guidance) 2 Mexico Finland 7% 7% Quebec 25% Australia 12% Nunavut

  6. Slide 6: Business Built on Industry Leading ESG Practices

    BUSINESS BUILT ON INDUSTRY LEADING ESG PRACTICES Essential to Deliver on our Regional Strategy and our Vision to Build a Growing, High-Quality, Low Risk, Sustainable Business ESG Stewardship Rating Agency Ranking Scale  Partner of choice within the mining industry and the MSCI Rating Leader (AAA, A

  7. Slide 7: Near Term Focus on Optimizing the Portfolio

    NEAR TERM FOCUS ON OPTIMIZING THE PORTFOLIO  Detour Lake  Technical evaluation brings mineral reserves to 20.4Moz*, improves production profile and increases mine life by 10 years  Assessing potential to increase production to 1.0Moz or more per year based on strong exploration upside to the west

  8. Slide 8: Assessing the Full Potential of the Portfolio Through Exploration

    ASSESSING THE FULL POTENTIAL OF THE PORTFOLIO THROUGH EXPLORATION Focus on Growing Mineral Reserves & Mineral Resources, Near Mine Opportunities and Pipeline Projects  Targeting growth of the Company's mineral reserves and mineral resources at year-end 2022 to a record level  Based on positive exp

  9. Slide 9: Detour Lake Mine – New Evaluation Shows a Longer Life and Improved Mine Plan

    DETOUR LAKE MINE – NEW EVALUATION SHOWS A LONGER LIFE AND IMPROVED MINE PLAN  Technical Evaluation Highlights:  Added 38% in gold reserves (+5.6Moz to 20.4Moz ), which increases the mine life by 10 years (until 2052)  Recovered gold increased by 38%:  + 0.4Moz added in 2028-2031 (reduces a produ

  10. Slide 10: Improved Production Profile with Opportunities for Additional Growth

    IMPROVED PRODUCTION PROFILE WITH OPPORTUNITIES FOR ADDITIONAL GROWTH Improved Improved Production Profile 1,000 Stockpile Reclaim Period Production Profile 2032-2042: +1.8Moz 2043-2052: +3.0Moz 2028-2031: +0.4Moz 800 Gold Production (koz) 600 400 200 0 2022 2024 2026 2028 2030 2032 2034 2036 2038 20

  11. Slide 11: Ongoing Exploration Expected to Drive Future Mineral Resource Growth

    ONGOING EXPLORATION EXPECTED TO DRIVE FUTURE MINERAL RESOURCE GROWTH Potential to Continue Growing "Out-pit" Mineralization Two Kilometres West of the Current Resource Pit  Drilling extends Detour Lake deposit 2.0 km west of the current pit outline – Drilling has continued to intersect a key gold-b

  12. Slide 12: Odyssey Project

    ODYSSEY PROJECT Initial pre-commercial production expected in March 2023  Construction activities progressing on schedule and on budget. Key milestones include:  Initiate shaft sinking – Q4 2022  Odyssey South production start-up – March 2023  Completion of Shaft sinking – 2026  Start of produc

  13. Slide 13: Odyssey Project

    ODYSSEY PROJECT Focus on Infill Drilling and Expanding East Gouldie Zone to the East and West  Infill drilling progressing in the Odyssey South Zone with expectations of initial mineral reserves to be declared at year-end 2022  Recent drilling has extended East Gouldie to the west by ~225m and to

  14. Slide 14: Kirkland Lake Regional Mining Hub

    KIRKLAND LAKE REGIONAL MINING HUB  Macassa – The Company is assessing opportunities to incorporate the AK Zone into the mine plan starting in 2024  Upper Beaver – The Company believes that Upper Beaver has the potential to be a low-cost mine with annual production in the range of 150 – 250 koz of

  15. Slide 15: Macassa – Potential to Create a Regional Mining Complex

    MACASSA – POTENTIAL TO CREATE A REGIONAL MINING COMPLEX Exploration focused on extending and infilling the South Mine Complex and Main Break along strike and at depth  Underground Drilling at Macassa Intersects High Grade Gold Mineralization on Four Mine Levels  Drilling on the 5300 level focused

  16. Slide 16: Hope Bay – Mineralization at Doris Remains Open in All Directions

    HOPE BAY – MINERALIZATION AT DORIS REMAINS OPEN IN ALL DIRECTIONS  Expanding Doris deposit; Mineralization remains open in all directions  Excellent potential to increase mineral reserves and mineral resources in all deposit areas and regionally  Near term focus on exploration drilling and evalua

  17. Slide 17: Synergy and Optimization Benefits Ahead of Estimates

    SYNERGY AND OPTIMIZATION BENEFITS AHEAD OF ESTIMATES Merger-Related Synergies are Expected to Help Mitigate Inflationary Cost Pressures Opportunities Synergy Value 10 Year Synergy Targets  Streamlining personnel costs and  ~$40M achieved to date service contracts Corporate  $40-$50M annually Syne

  18. Slide 18: High-Quality, Low-Risk Senior Gold Producer

    HIGH-QUALITY, LOW-RISK SENIOR GOLD PRODUCER Generating Superior Long- Term Returns to Shareholders  Strong Growth in Operating Margin H1 2022 Total Operating Margin $1.6B  Strong Financial Position, with liquidity of $2.2B+ and net debt of $0.4B+  Investment grade balance sheet – credit ratings:

  19. Slide 19: Key Takeaways

    Key Takeaways  Delivering strong operational performance  Excellent operating results in H1 2022 – Record gold production and good cost control result-in strong earnings and cashflow  Gold production is underpinned by six cornerstone assets with production rates in excess of 300,000oz/yr – Detour

  20. Slide 20: Agnico Eagle's Vision

    Agnico Eagle’s Vision  Agnico Eagle is the choice for investors looking for superior leverage to the gold price, on a risk-adjusted basis  Agnico Eagle has a simple, consistent, disciplined and proven approach to value creation  Low costs, strong margins and cashflows  Robust production profile

  21. Slide 21: Operation Appendix

    OPERATION APPENDIX

  22. Slide 22: Abitibi Quebec – A Long Term Operating Platform

    ABITIBI QUEBEC – A LONG TERM OPERATING PLATFORM MINESITES & PIPELINE PROJECTS LaRonde Complex Proven & probable Measured & indicated Inferred gold resource • Production start-up in 1988 gold reserves (million gold resources (million (million oz) • UG Operation: ~7.8ktpd oz) oz) • Expanded 5 times •

  23. Slide 23: Abitibi Region – Quebec

    ABITIBI REGION – QUEBEC Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically for use intensity per oz of GHG Scope 1&2 disturbed by mine of gold** emissions produced per activity** oz of gold** 7.12 m3/oz AU 0.09 1,090 ha Total GHG Emissions (Scope 1 GHG Reduction Initiatives and 2) an

  24. Slide 24: Abitibi Ontario – Company's Largest Production Platform with Room to Grow

    ABITIBI ONTARIO – COMPANY’S LARGEST PRODUCTION PLATFORM WITH ROOM TO GROW MINESITES & PIPELINE PROJECTS Detour Lake Proven & probable Measured & indicated Inferred gold resource • Produced 5.0Moz to date gold reserves (million gold resources (million (million oz) • OP operation with target to increa

  25. Slide 25: Abitibi Region – Ontario

    ABITIBI REGION – ONTARIO Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically for use intensity per oz of GHG Scope 1&2 disturbed by mine AU emissions produced per actvity oz of gold 1.04 m3/oz AU 0.36 3,899 ha Total GHG Emissions (Scope 1 GHG Reduction Initiatives and 2) and Emission

  26. Slide 26: Nunavut – Largest Gold Producer in the Canadian Arctic

    NUNAVUT – LARGEST GOLD PRODUCER IN THE CANADIAN ARCTIC MINESITES & PIPELINE PROJECTS Meadowbank Complex Proven & probable Measured & indicated Inferred gold resource • Acquisition in 2007 gold reserves (million gold resources (million (million oz) • Meadowbank mine produced 3Moz (2010- oz) oz) 2019)

  27. Slide 27: Nunavut

    NUNAVUT Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically for use intensity per oz of GHG Scope 1&2 disturbed by mine AU emissions produced per activity oz of gold 2.19 m3/oz AU 0.54 4,311 ha Total GHG Emissions (Scope 1 and 2) and Emission Intensity GHG Reduction Initiatives 500 K

  28. Slide 28: Finland – Kittila – Largest Primary Gold Producing Mine in Europe

    FINLAND – KITTILA – LARGEST PRIMARY GOLD PRODUCING MINE IN EUROPE MINESITES & PROJECTS ESG Proven & probable Measured & indicated Inferred gold resource Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically gold reserves (million gold resources (million (million oz) for use intensity pe

  29. Slide 29: Australia – High Grade, Low Cost Underground Operation

    AUSTRALIA – HIGH GRADE, LOW COST UNDERGROUND OPERATION MINESITE & PROJECTS ESG Proven & probable Measured & indicated Inferred gold resource Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically gold reserves (million gold resources (million (million oz) for use intensity per oz of GHG

  30. Slide 30: Mexico – A Significant Source of Precious Metals Production Since 2009

    MEXICO – A SIGNIFICANT SOURCE OF PRECIOUS METALS PRODUCTION SINCE 2009 MINESITES & PIPELINE PROJECTS ESG Proven & probable Measured & indicated Inferred gold resource Freshwater withdrawn Tonnes (CO2 equivalent) Total area physically gold reserves (million gold resources (million (million oz) for us

  31. Slide 31: Mineral Reserves and Mineral Resources

    Mineral Reserves and Mineral Resources

  32. Slide 32: Notes to Investors Regarding the Use of Mineral Resources

    NOTES TO INVESTORS REGARDING THE USE OF MINERAL RESOURCES NI 43-101 requires mining companies to disclose mineral reserves and mineral resources using the subcategories of "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferre

  33. Slide 33: 2021 Gold Mineral Reserves and Mineral Resources

    2021 GOLD MINERAL RESERVES AND MINERAL RESOURCES Gold Mineral Reserves Increase to Record Level AGNICO EAGLE As of December 31, 2020 As of December 31, 2021 Category Tonnes Grade Contained Gold Tonnes Grade Contained Gold (000s) (g/t Au) (000 oz) (000s) (g/t Au) (000 oz) Mineral Reserves Proven 44,0

  34. Slide 34: Mineral Reserves as at December 31, 2021 for Properties Held by Agnico Eagle Prior to the Merger

    MINERAL RESERVES AS AT DECEMBER 31, 2021 FOR PROPERTIES HELD BY AGNICO EAGLE PRIOR TO THE MERGER Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may differ from

  35. Slide 35: Mineral Resources as at December 31, 2021 for Properties Held by Agnico Eagle Prior to the Merger

    MINERAL RESOURCES AS AT DECEMBER 31, 2021 FOR PROPERTIES HELD BY AGNICO EAGLE PRIOR TO THE MERGER Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may differ fro

  36. Slide 36: Mineral Resources as at December 31, 2021 for Properties Held by Agnico Eagle Prior to the Merger

    MINERAL RESOURCES AS AT DECEMBER 31, 2021 FOR PROPERTIES HELD BY AGNICO EAGLE PRIOR TO THE MERGER Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may differ fro

  37. Slide 37: Mineral Reserves as at December 31, 2021 for Properties Held by Kirkland Lake Gold Prior to the Merger

    MINERAL RESERVES AS AT DECEMBER 31, 2021 FOR PROPERTIES HELD BY KIRKLAND LAKE GOLD PRIOR TO THE MERGER Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may diffe

  38. Slide 38: Mineral Resources as at December 31, 2021 for Properties Held by Kirkland Lake Gold Prior to the Merger

    MINERAL RESOURCES AS AT DECEMBER 31, 2021 FOR PROPERTIES HELD BY KIRKLAND LAKE GOLD PRIOR TO THE MERGER Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may diff

  39. Slide 39: Notes to Investors Regarding the Use of Mineral Resources

    NOTES TO INVESTORS REGARDING THE USE OF MINERAL RESOURCES Notes to Investors Regarding the Use of Mineral Resources The mineral reserve and mineral resource estimates contained in this presentation have been prepared in accordance with The Canadian Securities Administrators' NI 43-101. These standar

  40. Slide 40: Mineral Reserves and Mineral Resources as at March 31, 2022 for Detour Lake Property

    MINERAL RESERVES AND MINERAL RESOURCES AS AT MARCH 31, 2022 FOR DETOUR LAKE PROPERTY Mineral reserves are not a subset of mineral resources. Tonnage amounts and contained metal amounts presented in this table have been rounded to the nearest thousand, so aggregate amounts may differ from column tota

  41. Slide 41: Notes to Investors Regarding the Use of Mineral Resources

    NOTES TO INVESTORS REGARDING THE USE OF MINERAL RESOURCES CIM definitions (2014) were followed in the estimation of mineral reserves and mineral resources. Mineral reserves are exclusive of mineral resources. Tonnes and gold ounce information is rounded to the nearest thousand. Discrepancies in tota

  42. Slide 42: Notes to Investors

    NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This presentation discloses certain financial performance measures, including "total cash costs per ounce", "all-in sustaining costs per ounce", "minesite costs per tonne", "net debt", "adjusted net income", "adjusted net incom

  43. Slide 43: Notes to Investors

    NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures Management also performs sensitivity analyses in order to quantify the effects of fluctuating foreign exchange rates and metal prices. This presentation also contains information as to estimated future total cash costs per ounc

  44. Slide 44: agnicoeagle.com

    Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-947-1212 info@agnicoeagle.com agnicoeagle.com

Agnico Eagle Mines — Gold Forum Americas 2022 on 6ix