Agnico Eagle Mines Limited · TSX:AEM

Agnico Eagle Mines — Mining Forum Americas 2026

22 slides from Agnico Eagle Mines's conference presentation, Sep 29, 2026

  1. Slide 1: Mining Forum Americas

    NYSE & TSX: AEM Mining Forum Americas September 29, 2026

  2. Slide 2: Notes to Investors

    Notes to Investors Forward-Looking Statements The information in this presentation has been prepared as at September 25, 2026. Certain statements contained in this presentation constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of

  3. Slide 3: Agnico Eagle – A High-Quality, Low-Risk Senior Gold Producer

    Agnico Eagle – A High-Quality, Low-Risk Senior Gold Producer NUNAVUT Second Largest Gold Producer; FINLAND Operations in Premier Jurisdictions with Kittilä Hope Bay Proven Geological Potential Ikkari CANADA Meadowbank 2005 2025 240 Gold Production (koz) 3,447 ~14x Pinos Altos Meliadine Gold Producti

  4. Slide 4: Strongest Position in Our History – Potential 20% to 30% Production Growth

    Strongest Position in Our History – Potential 20% to 30% Production Growth Detour Lake Canadian Malartic Pathway to 1Moz Annual Producer Pathway to 1Moz Annual Producer Continued Focus on Value Creation Delivered two decades of gold production growth per share Forecast another decade of gold product

  5. Slide 5: Hope Bay – Building the Next 400-435koz Annual Producer in Nunavut

    Hope Bay – Building the Next 400-435koz1 Annual Producer in Nunavut Initial production expected in 2030 with ramp-up to 6,000 tpd in 2032 Execution schedule de-risked by site preparedness and current detailed engineering at 70% Significant upside potential – Boston Doris camp dormitories Robert’s Ba

  6. Slide 6: Canadian Malartic – Pathway Towards 1Moz Annual Producer

    Canadian Malartic – Pathway Towards 1Moz Annual Producer Potential for additional 400-500koz per year with “fill-the-mill” strategy Ramping-up production from East Gouldie via ramp; initial production via shaft expected in Q2 2027 Advancing evaluation for increase in mining rate supported by second

  7. Slide 7: Detour Lake – Pathway Towards 1Moz Annual Producer

    Detour Lake – Pathway Towards 1Moz Annual Producer Potential for additional 300-350koz per year through development of underground mine and mill optimization to 29Mtpa Advancing exploration ramp and excavation of overburden for conveyor- ramp portal Optionality for an expanded mill and larger underg

  8. Slide 8: Upper Beaver – Potential for 200-220koz Annual Producer

    Upper Beaver – Potential for 200-220koz Annual Producer Underground project with potential annual production of ~210koz beginning in 2030 Advancing development of exploration ramp and exploration shaft Optionality for satellite deposits within Kirkland Lake camp Shaft headframe Underground portal Wa

  9. Slide 9: Disciplined Capital Allocation Strategy

    Disciplined Capital Allocation Strategy Operating Cash Flow Allocation* Core Value Creation Flexible Capital 1 Capital Uses 2 Investments 3 Returns * Chart segments are indicative only Growth capital Share buyback Core – Flexible – Sustaining capital Sustaining Capital, Share Buyback ~$1B annually ~

  10. Slide 10: Positioning the Portfolio for the Next Phase of Growth

    Positioning the Portfolio for the Next Phase of Growth San Nicolás Hammond Reef Ikkari 50% Joint Venture with Potential for a 250-300koz Potential for a 250+koz Teck Resources Annual Producer Annual Producer Cu-Zn-Ag-Au deposit located in Located in Northwestern Ontario Located 50km from Kittila, wi

  11. Slide 11: Appendix

    ee Appendix

  12. Slide 12: Hope Bay – Gold Mineral Reserves and Mineral Resources (May 19, 2026)

    Hope Bay – Gold Mineral Reserves and Mineral Resources (May 19, 2026)* Mineral Reserves as at May 19, 2026 Operation Proven & Probable Gold Mining 000 g/t 000 Metallurgical Method** Tonnes Oz Au Recovery (%) Hope Bay U/G — — — — Mineral Resources as at May 19, 2026 Operation Measured Indicated Measu

  13. Slide 13: 2025 Gold Mineral Reserves and Mineral Resources

    2025 Gold Mineral Reserves and Mineral Resources* As at December 31, 2025 As at December 31, 2024 Category Tonnes Grade Contained Gold Tonnes Grade Contained Gold (000s) (g/t Au) (000s oz) (000s) (g/t Au) (000s oz) Mineral Reserves Proven 212,796 0.98 6,731 215,249 0.93 6,433 Probable 1,116,755 1.36

  14. Slide 14: 2025 Mineral Reserves and Mineral Resources

    2025 Mineral Reserves and Mineral Resources Mineral Reserves as at December 31, 2025 Operation / Project Proven Probable Proven & Probable Mining 000 000 000 000 000 000 Metallurgical Gold g/t g/t g/t Method* Tonnes Oz Au Tonnes Oz Au Tonnes Oz Au Recovery (%) LaRonde mine1 U/G 2,469 4.65 369 8,158

  15. Slide 15: 2025 Mineral Reserves and Mineral Resources (continued)

    2025 Mineral Reserves and Mineral Resources (continued) Mineral Reserves as at December 31, 2025 Operation / Project Proven Probable Proven & Probable Mining Metallurgical Silver 000 Tonnes g/t 000 Oz Ag 000 Tonnes g/t 000 Oz Ag 000 Tonnes g/t 000 Oz Ag Method* Recovery (%) LaRonde mine U/G 2,469 10

  16. Slide 16: 2025 Mineral Reserves and Mineral Resources (continued)

    2025 Mineral Reserves and Mineral Resources (continued) Mineral Resources as at December 31, 2025 Operation / Project Measured Indicated Measured & Indicated Inferred Mining Gold Method 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au LaRonde mine U

  17. Slide 17: 2025 Mineral Reserves and Mineral Resources (continued)

    2025 Mineral Reserves and Mineral Resources (continued) Mineral Resources as at December 31, 2025 Operation / Project Measured Indicated Measured & Indicated Inferred Mining Gold 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au 000 Tonnes g/t 000 Oz Au Method Amaruq O/P — —

  18. Slide 18: 2025 Mineral Reserves and Mineral Resources (continued)

    2025 Mineral Reserves and Mineral Resources (continued) Mineral Resources as at December 31, 2025 Operation / Project Measured Indicated Measured & Indicated Inferred Silver Mining Method 000 Tonnes g/t 000 Oz Ag 000 Tonnes g/t 000 Oz Ag 000 Tonnes g/t 000 Oz Ag 000 Tonnes g/t 000 Oz Ag LaRonde mine

  19. Slide 19: Endnotes

    Endnotes Use of Mineral Resources The mineral reserve and mineral resource estimates contained in this presentation have been prepared in accordance with the Canadian Securities Administrators' (the "CSA") National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). The S

  20. Slide 20: Endnotes (continued)

    Endnotes (continued) Use of Mineral Resources NI 43-101 requires mining companies to disclose mineral reserves and mineral resources using the subcategories of "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral re

  21. Slide 21: Endnotes (continued)

    Endnotes (continued) Non-GAAP Measures of Performance This presentation discloses certain financial performance measures, including "EBITDA" which means earnings before interest, taxes, depreciation and amortization, that are not standardized measures under IFRS Accounting Standards. These measures

  22. Slide 22: Investor Relations

    NYSE & TSX: AEM Investor Relations 416-947-1212 investor.relations@agnicoeagle.com agnicoeagle.com