  1. Slide 1: Pit to Port Infrastructure in SA: An Explorer's Perspective

    For personal use only Pit to Port Infrastructure in SA An Explorer’s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011

  2. Slide 2: Disclaimer & Competent Person's Statement

    LINCOLN MINERALS LIMITED Disclaimer & Competent Person’s Statement This presentation has been prepared by Lincoln Minerals Limited (“LML") as an aid to a spoken For personal use only explanation. The information contained in this presentation is a professional opinion only and is given in good faith

  3. Slide 3: Lincoln Minerals Limited

    LINCOLN MINERALS LIMITED  Listed on ASX March 2007  Market capitalisation (April 2011 @ 15 cents/share) $20.1 million For personal use only  Cash on hand March 2011 $2.9 million  Offices in Adelaide and Port Lincoln – total 10 staff  Significant assets (South Australia):  Gum Flat Iron Ore  E

  4. Slide 4: Gawler Craton Iron Ore Potential

    LINCOLN MINERALS LIMITED Gawler Craton For personal use only Iron Ore Potential Eastern Eyre Peninsula • Historically one of world’s major iron ore provinces • Middleback Ranges – over 240 Mt of high-grade lump hematite mined over past 100 years (BHP & OneSteel Ltd) • Potentially more than10 billion

  5. Slide 5: Port Options

    LINCOLN MINERALS LIMITED Port Options For personal use only In South Australia there are no ports capable of handling Cape-size ships (180,000+ tonnes) Port Lincoln: • Best port in SA • 15m draft & can load to ~100,000 tonnes • Proclaimed Port • Only 15% utilised • Road & rail access Port Bonython &

  6. Slide 6: Barns Prospect

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Barns Prospect For personal use only  Located in scrub land 20km from Port Lincoln (or 100km from proposed new Sheep Hill deep sea bulk commodities port)  103+ million tonne (Mt) iron ore resource including:  Barns Indicated Hematite-Goethite Resource: 1

  7. Slide 7: Scoping Study Development Options

    Gum Flat Iron Ore Scoping Study LINCOLN MINERALS LIMITED Development Options  Stage 1 – Hematite For personal use only  Mine & export 0.5 million tonnes per annum (Mtpa) DSO (55% Fe) from Port Lincoln  Stage 2 – Magnetite  Mine 10 Mtpa magnetite ore and process onsite to produce 2 Mtpa high grad

  8. Slide 8: Conceptual Stage Option – Hematite DSO

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Conceptual Stage 1 Option – Hematite DSO For personal use only  Mine & export 0.5 Mtpa DSO hematite-goethite (~55% Fe) from Port Lincoln  Road transport to Port Lincoln via B-Doubles or Road Trains (covered) – 3 trucks/hour, 12 hours a day, 5.5 days/week

  9. Slide 9: Conceptual Stage Ship Loading Options

    Gum Flat Iron Ore LINCOLN MINERALS LIMITED Conceptual Stage 1 Ship Loading Options Ore containers on road train, Esperance Port Lincoln Wharf For personal use only Option A: construct a 70,000 tonne negatively pressurised storage shed in the wharf area at Port Lincoln & connect to third party convey

  10. Slide 10: Opex & Capex

    LINCOLN MINERALS LIMITED Gum Flat Iron Ore Opex & Capex For personal use only Stage 1 Stage 2 Hematite DSO High Grade Magnetite Concentrate (67% Fe) Production 0.5 Mtpa 2 Mtpa concentrate Concentrate 55% Fe 67% Fe Grade Slurry Pipeline to Transport Road to PL Road to PL Rail to PL PL Overburden A$23

  11. Slide 11: Gum Flat Development Timeline

    LINCOLN MINERALS LIMITED Gum Flat Development Timeline 2010 2011 2012 2013 2014 For personal use only Stage 1 Drilling & Resource Barns DSO Baseline Evaluation Studies Mining Lease Application MARP Groundwater Approvals Remove Overburden Mine & Export DSO Hematite Pt Lincoln Community Development Bu

  12. Slide 12: Summary

    LINCOLN MINERALS LIMITED Summary Lincoln Minerals focussing on development of initial hematite-goethite DSO mine at Gum Flat within 2 years ** For personal use only Gum Flat is less than 20km from Port Lincoln Potential to be a low operating cost DSO operation (<$40 per tonne) with relatively low ca