Unimit Engineering Public Co., Ltd. · SET:UEC
Unimit Engineering Public — Investor Presentation (2018)
80 slides from Unimit Engineering Public's investor presentation, Aug 26, 2018
Slide 1: Unimit Engineering Public Company Limited
Unimit Engineering Public Company Limited ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007, U, U2, S and R STAMP www.unimit.com
Slide 2: Agenda
01 Company information Company information 02 Business segment Business segment 03 Organization, Manpower Organization, Manpower and Capacity and Capacity 04 Equipment and Equipment and Certificates Certificates 05 Location Location 06 Client Client &&end enduser user listlist 2
Slide 3: Company information
01 Company information Established: April 21, 1982 Capital: THB 143 Million Registered Stock Ticker: “UEC” (MAI* Market) since Nov 2005 Headquarter Bangkok Office: Phrapradaeng, Samutprakran Factory Factory I & II: Banbung, Chonburi Factory III: Nikom Pattana, Rayong Web site: www.unim
Slide 4: Company history and milestones
Factory I completed • Listed on MAI Factory II was built on • ISO 9001:2000 • ISO 14001:2004 built in Banbung, stock market. 40 acres to house all certification extended • OHSAS 18001:2007 Chonburi. • Registered Capital productions. to Factory II • ISO 3834-2:2005 increased to • Started Fabrication
Slide 5: Revenue by year (Million THB)
2,000 1,800 1,642 1,616 1,600 1,400 1,370 1,350 1,240 Million THB 1,200 1,200 1,078 990 1,000 936 800 800 600 400 200 - 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Year
Slide 6: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & end user list 6
Slide 7: Business segment
02 Business segment 1. Pressure Vessel 2. Machinery Parts 3. Chemical Tanks 4. Structure Steel/Piping 5. Mechanical installation LPG Tank Cryogenic Tank 5.Mechanical Installation 23% 4.Structure Steel / Piping 0% 1.Pressure Vessel 3.Chemical Tanks 45% 10% 2.Machinery Parts 7% Local : 82 % Cryogenic
Slide 8: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Stack and Diverters SILO Pipe Racks
Slide 9: Tanks: self support, wagon and bullet tanks
16.4 ton Self support 4.3 to 10 ton Above ground installation Under ground installation 25.4 ton Wagon Tank 93 ton Bullet tank 9
Slide 10: 6,000 M3 tank project
6,000 M3 Site location: Scope of work and supply is design • Material procurement • Khon Kaen Terminal • Shop fabrication • Surat thani Terminal • Songkhla [4,000 m3] • site erection, Testing and commissioning 10
Slide 11: LIN/LOX cryogenic tanks
LIN 5310;000 Litres LIN / LOX - 350,000 titres
Slide 12: TPX Linear Alkyl Benzene project
ID 5,300 mm., 46,700 TL-TL mm., 311,55 ton End user / EPC: Thai Paraxylene Company Limited / Hyundai Engineering Company Limited Project name: TPX Linear Alkylk Benzene [Year 2013-2014] 12
Slide 13: Emission Improvement and PSA-3 project
ID 3900/5700/2500 mm., 30,000 TL-TL mm., 122.55 ton End user / EPC: Thai Oil Public Company / Foster wheeler Project name: Emission Improvement and PSA-3 (Year 2011-2012) 13
Slide 14: PTTGC BV Project
ID 5,000 mm., 60,100 TL-TL mm., 252.0 ton End user / EPC: PTT Global Chemical Public Company Limited / Chiyoda (Thailand) Ltd. and Toyo-Thai Corporation PLC. Project name: Byproduct Valued Added (BV Project) [Year 2011] 14
Slide 15: TPX Expansion Phase II
ID 4,200 mm., 60,950 TL-TL mm., 244.10 ton End user: Thai Paraxylene Company limited Project name: TPX Expansion Phase II (Year 2011-2012) 15
Slide 16: New Parallel C3 Train
ID 4,400 mm., 90,740 TL-TL mm.., End user: Thai OLEFINS Public Company Limited Project name: New Parallel C3 Train 16
Slide 17: HP Drum
HP Drum Maximum thickness (experience): 160 mm. 2,500 ID 11,000 mm TL-TL, 146.53 ton. Internal Parts Installation Material: Carbon steel SA 516 -70, SA299-B 17
Slide 18: LP Drum
LP Drum Internal Parts Installation 18
Slide 19: Blow down Tanks
Pressure Vessel (Blow down tank) <i 16 12 201 BIG
Slide 20: Deaerators: spray-type and tray-type
Tray-type or cascade-type Spray-type Process design by STORK THERMEQ Netherlands Process design by Sterling Deaerator Company and Kansas City Deaerator Company 20
Slide 21: Shell & Tube Heat Exchanger
Waste Gas Fixed tube Tube Pre- type bundle Heat Shell & Tube Heat exchanger with Expansion WGPH - Year: 2010 Bellow Customer: SIPCHEM, Saudi Arabia 21
Slide 22: Closed drain tank
Closed drain Instrument tank gas filter OD 42” TL-TL 36’ Material SA516 Gr.70 ID 2’35/8’ TL-TL 9’-81/8” Material Carbon steel SA106Gr.B 22
Slide 23: Test separator
Test separator OD 3’-6” TL-TL11’ Material SA516 Gr.70N Internal Parts Installation 23
Slide 24: Reactor
Reactor Reactor 24
Slide 25: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Furnace Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Pipe Racks Stack and SILO installations
Slide 26: Furnace
Furnace Furnace PROJECT: I-PRO CAPL MANUFACTURING PROJECT: NSGT CGL MANUFACTURING OWNER/EPC: TATA India/ SANKYU 1,023.80 tons Year 2011 OWNER/EPC: Nippon Steel / SANKYU 26
Slide 27: Diverters
Diverters Project: DEIR ALI II 701 MW., Damascus, Syria Project MEGALOPOLIS, Unit V 811 MW., Greece 27
Slide 28: Boiler Fan Casing
Boiler Fan Casing: 28
Slide 29: Boiler Fan Casing, Rotors & Static Parts
Buyer : Prony Australia Boiler Fan Casing, Rotors & Static Parts Buyer: Alcan Grove Australia 29
Slide 30: Wind Tunnel
Wind Tunnel PROJECT: BMW AVZ WIND TUNNEL FANS for HOWDEN GERMANY: Year 2006 30
Slide 31: Stack
Stack PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 31
Slide 32: Stack (continue)
Stack (continue) PROJECT: IRPC Fuel Gas Stack, Thailand Purchaser Zeeco, Inc. year 2013 32
Slide 33: Incinerator
Incinerator PROJECT: VCM 1 Equipment Replacement Owner: Thai Plastic and Chemical PLC.; year 2014 33
Slide 34: Incinerator
Incinerator PROJECT: VCM 1 Equipment Replacement, Owner: Thai Plastic and Chemical PLC.; Year 2014 34
Slide 35: Drum Attrition & Homogenization
Drum Attrition & Homogenization PROJECT: BMA Composting Plant, ONNUCH Bangkok Thailand; Year 2016 35
Slide 36: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 37: 37
37
Slide 38: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 39: Project: HDPE
PROJECT: HDPE 4 Total weight 2,350 tons year 2007 39
Slide 40: Project: JRU Malaysia
PROJECT: JRU- Malaysia Total 521 tons Year: 2011 Contractor: Aibel 40
Slide 41: Project: ABBOS Chinguetti
Project: ABBOS-04-500-0 CHINGUETTI M12 Contractor: ABB limited Year : 2004 41
Slide 42: Pipe spools
Pipe spools PROJECT: JRU -Malaysia PROJECT: JRU -Malaysia 42
Slide 43: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 44: 44
44
Slide 45: 45
45
Slide 46: Mechanical Installation
Mechanical Installation,
Slide 47: 47
47
Slide 48: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Environment, health & safety management and compliance 48
Slide 49: Organization, Manpower and Capacity
03 Organization Manpower and Capacity President Mr. John LU 49
Slide 50: Manpower by function
Management/Admin 137 2 Permanent = 711 Temporary = 111 Engineers/supervisors 71 - Total = 822 Construction 6 /3 Formen/Technicians 128 2 QA/QC 67 - Welder 88 17 Fabrication 214 87 - 50 100 150 200 250 300 350 50
Slide 51: Production capacity
• Vessels/Equipment: 14,000 ton/year • Steel Structures/Machinery Parts: 12,000 ton/year • Piping Fabrication: 100,000 Diameter inches per year • Vessels/Spherical Tanks Erection: 1,000 ton/year • Equipment Installation: 1,000 ton/year • Steel Structure Erection: 1,000 ton/year • Piping: 100,000 dia
Slide 52: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 52
Slide 53: Plasma and gas cutting
Plasma Cutting: Maximum thickness 38 mm. Work piece W 3 m. x L 15 m. Gas Cutting: Maximum thickness 300 mm. 53
Slide 54: Pressing capacity
Pressing Capacity Max. Force 900 Tons Max Load 1,500 Tons Column Span 6000 mm. (inside) Max 6 Meters Span 54
Slide 55: Plate bending
Plate bending: Diameter of roller: 800 mm. (all 3 rollers) Capacity: 125 mm. (5”) x 3,675 mm Width. 55
Slide 56: Automatic submerged arc welding
• Automatic Submerged Semi-Automatic Longitudinal Welding with Manipulator Self-Alignment Power Rolling Machine 56
Slide 57: Cold forming machines
Cold forming machine: Max diameter: 6 m. Cold forming machine: Max diameter: 3.8 m. Max thickness: 40 mm. Max thickness: 22 mm. 57
Slide 58: Equipment
Equipment Head forming and spinning inadabi 58
Slide 59: Double Column Vertical Boring Machine
Double Column Vertical Boring Machine Specification: 1 M Wide x 3 M Long x 300 mm Thickness capability 59
Slide 60: NC Hydraulic Profile Bending Machine
NC Hydraulic Profile Bending Machine: Max FB 100 x 25t x 800r 60
Slide 61: High Pressure Test Pump
High Pressure Test Pump - Output (max) 10,000 psi Vacuum pump w/ Booster E2M275 EH1200 - Rotary pump speed: 275 Flow (max) 668 sq. inch m3/hr. Booster pump speed: 1200m3/hr. 61
Slide 62: Furnace capacity
Capacity: 5.3 m.(W) x 5.3 m.(H) x 18.0 m.(L) 100 Tons Capacity: 4.5 m.(W) x 3.5 m.(H) x 6.5 m.(L) 50 – 60 Tons Up to 1,200 C degree (LPG-fired) Up to 1,200 C degree (LPG-fired) 62
Slide 63: Blasting shop
Abrasive material: Grit Shop dimension: L 25 m. x W 13 m. x H 7 m. 63
Slide 64: ISO 9001:2015 certificate
Uoyets Register Certificate of Approval Tis io omy that the Managemen! System of Unimit Engineering Public Company Limited 410/7-8 Mu 3 and 10/4 Mu 1, Chonburianbung-Pa-Yub Rd, Nongchak, Banbung, ‘chon Bur, 20170, Thailand hasbeen approved by LRGA to the folowing standarés 180 9001:2015 Charred Boso
Slide 65: ASME Certificate of Authorization
The American Society of Mechanical Engineers CERTIFICATE OF AUTHORIZATION u The named company is authorized by the American Society of Mechanical Engineers (ASME) for the scope of activly shown beloy in accordance with the applicable rules of the ASME Boller and Pressure Vessel Code. The use of the
Slide 66: NBIC and ASME Certificates
NBIC and ASME Certificates THE NATIONAL BOARD oF As CERTIFICATE OF Boller & PRESSURE VESSEL INSPECTORS {' Me AUTHORIZATION s Certificate of Authorization ‘The named company is authorized by the American Sociaty of Mechanical Engineers (ASME) forthe scope of activity shown below in accordance with th
Slide 67: Certificates of Achievement
CERTIFICATE oe ——— OF ACHIEVEMENT TIFICATE IS PROUDL GC BRANCH#6 INERY PLANT FOR TURNAROUND PROJECT MAY-JUNE 2016 ACHIVEMENT TO. UNIMIT ENGINEERING PUBLIC COMPANY LIMITED (GC6-RER-TAZ016-10A & 44: Piping Repair Work & Furnace Coil Replacement Service Package A AWARDED THIS DAY OF JUNE 30h, 2016 Mr.J
Slide 68: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 68
Slide 69: Location
ation BANGKOK + Suvarnabhumi Airport, BANBUNG UNIMIT ENGINEERING PUBLIC COMPANY LIMITED Factory #1 and #2 * Factory #3 RAYONG __MAP,TA PHUT; 69
Slide 70: Plant Layout Factory 1 and 2
Plant Layout Factory 1| and 2
Slide 71: Factory 1 layout
Width = 155 m. (Front View) Length = 428 m. Area = 71,200 sq.m. Canteen 71
Slide 72: Factory 2 layout
Width = 270 m. Length = 645 m. Area = 123,216 sq.m. 72
Slide 73: 73
73
Slide 74: Factory 3
Factory 3 Start Operate in Year 2009 Width = 83 m. Length = 48 m. Area = 38,400 sq.m. 74
Slide 75: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 75
Slide 76: Client list
lremtelesBisty(ERIG) f te aoe ansas City ey I" - riwa | MACCHI MITSUBISHI STEAM & POWER GENERATION Rae DUST IRGE ETE INENOOTERERIKSEN ——— e RCR Ener; ~ ad (| ———
Slide 77: Client list
@| vetcoaibel <= SAMSUNG ENGINEERING TOSHIBA © WET) ze A SS sik. Vine-seau, }urong Engineering Limited
Slide 78: End user list (Petrochemical industry)
End user List (End User) ( Petrochemical Industry ) Can Be er Vv €) Ths. wv M4// BOC bey . —- Aber of The Linde Group Oo : BASF The Chemical Company Aintle Kas -APRAUUIR Cleici¢ Air-Gas Industry em a 7 oe @lscc <> INDORAMA == PRPS yo F even OP rcwien
Slide 79: End user list (continue)
End user List (continue) uSUn ursarnTlasiaay dia (UMBU) b y J| The Bangchak Petroleum Public Company Limited TATA TATA STEEL 0K Mubadala | Petroleum
Slide 80: Thank you
Thank you
Unimit Engineering Public Company — Investor Presentation (2018) on 6ix