Unimit Engineering Public Co., Ltd. · SET:UEC

Unimit Engineering Public — Investor Presentation (2018)

80 slides from Unimit Engineering Public's investor presentation, Aug 26, 2018

  1. Slide 1: Unimit Engineering Public Company Limited

    Unimit Engineering Public Company Limited ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007, U, U2, S and R STAMP www.unimit.com

  2. Slide 2: Agenda

    01 Company information Company information 02 Business segment Business segment 03 Organization, Manpower Organization, Manpower and Capacity and Capacity 04 Equipment and Equipment and Certificates Certificates 05 Location Location 06 Client Client &&end enduser user listlist 2

  3. Slide 3: Company information

    01 Company information  Established: April 21, 1982  Capital: THB 143 Million Registered  Stock Ticker: “UEC” (MAI* Market) since Nov 2005 Headquarter  Bangkok Office: Phrapradaeng, Samutprakran Factory  Factory I & II: Banbung, Chonburi  Factory III: Nikom Pattana, Rayong  Web site: www.unim

  4. Slide 4: Company history and milestones

    Factory I completed • Listed on MAI Factory II was built on • ISO 9001:2000 • ISO 14001:2004 built in Banbung, stock market. 40 acres to house all certification extended • OHSAS 18001:2007 Chonburi. • Registered Capital productions. to Factory II • ISO 3834-2:2005 increased to • Started Fabrication

  5. Slide 5: Revenue by year (Million THB)

    2,000 1,800 1,642 1,616 1,600 1,400 1,370 1,350 1,240 Million THB 1,200 1,200 1,078 990 1,000 936 800 800 600 400 200 - 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Year

  6. Slide 6: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & end user list 6

  7. Slide 7: Business segment

    02 Business segment 1. Pressure Vessel 2. Machinery Parts 3. Chemical Tanks 4. Structure Steel/Piping 5. Mechanical installation LPG Tank Cryogenic Tank 5.Mechanical Installation 23% 4.Structure Steel / Piping 0% 1.Pressure Vessel 3.Chemical Tanks 45% 10% 2.Machinery Parts 7% Local : 82 % Cryogenic

  8. Slide 8: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Stack and Diverters SILO Pipe Racks

  9. Slide 9: Tanks: self support, wagon and bullet tanks

    16.4 ton Self support 4.3 to 10 ton Above ground installation Under ground installation 25.4 ton Wagon Tank 93 ton Bullet tank 9

  10. Slide 10: 6,000 M3 tank project

    6,000 M3 Site location: Scope of work and supply is design • Material procurement • Khon Kaen Terminal • Shop fabrication • Surat thani Terminal • Songkhla [4,000 m3] • site erection, Testing and commissioning 10

  11. Slide 11: LIN/LOX cryogenic tanks

    LIN 5310;000 Litres LIN / LOX - 350,000 titres

  12. Slide 12: TPX Linear Alkyl Benzene project

    ID 5,300 mm., 46,700 TL-TL mm., 311,55 ton End user / EPC: Thai Paraxylene Company Limited / Hyundai Engineering Company Limited Project name: TPX Linear Alkylk Benzene [Year 2013-2014] 12

  13. Slide 13: Emission Improvement and PSA-3 project

    ID 3900/5700/2500 mm., 30,000 TL-TL mm., 122.55 ton End user / EPC: Thai Oil Public Company / Foster wheeler Project name: Emission Improvement and PSA-3 (Year 2011-2012) 13

  14. Slide 14: PTTGC BV Project

    ID 5,000 mm., 60,100 TL-TL mm., 252.0 ton End user / EPC: PTT Global Chemical Public Company Limited / Chiyoda (Thailand) Ltd. and Toyo-Thai Corporation PLC. Project name: Byproduct Valued Added (BV Project) [Year 2011] 14

  15. Slide 15: TPX Expansion Phase II

    ID 4,200 mm., 60,950 TL-TL mm., 244.10 ton End user: Thai Paraxylene Company limited Project name: TPX Expansion Phase II (Year 2011-2012) 15

  16. Slide 16: New Parallel C3 Train

    ID 4,400 mm., 90,740 TL-TL mm.., End user: Thai OLEFINS Public Company Limited Project name: New Parallel C3 Train 16

  17. Slide 17: HP Drum

    HP Drum Maximum thickness (experience): 160 mm. 2,500 ID 11,000 mm TL-TL, 146.53 ton. Internal Parts Installation Material: Carbon steel SA 516 -70, SA299-B 17

  18. Slide 18: LP Drum

    LP Drum Internal Parts Installation 18

  19. Slide 19: Blow down Tanks

    Pressure Vessel (Blow down tank) <i 16 12 201 BIG

  20. Slide 20: Deaerators: spray-type and tray-type

    Tray-type or cascade-type Spray-type Process design by STORK THERMEQ Netherlands Process design by Sterling Deaerator Company and Kansas City Deaerator Company 20

  21. Slide 21: Shell & Tube Heat Exchanger

    Waste Gas Fixed tube Tube Pre- type bundle Heat Shell & Tube Heat exchanger with Expansion WGPH - Year: 2010 Bellow Customer: SIPCHEM, Saudi Arabia 21

  22. Slide 22: Closed drain tank

    Closed drain Instrument tank gas filter OD 42” TL-TL 36’ Material SA516 Gr.70 ID 2’35/8’ TL-TL 9’-81/8” Material Carbon steel SA106Gr.B 22

  23. Slide 23: Test separator

    Test separator OD 3’-6” TL-TL11’ Material SA516 Gr.70N Internal Parts Installation 23

  24. Slide 24: Reactor

    Reactor Reactor 24

  25. Slide 25: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Furnace Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Pipe Racks Stack and SILO installations

  26. Slide 26: Furnace

    Furnace Furnace PROJECT: I-PRO CAPL MANUFACTURING PROJECT: NSGT CGL MANUFACTURING OWNER/EPC: TATA India/ SANKYU 1,023.80 tons Year 2011 OWNER/EPC: Nippon Steel / SANKYU 26

  27. Slide 27: Diverters

    Diverters Project: DEIR ALI II 701 MW., Damascus, Syria Project MEGALOPOLIS, Unit V 811 MW., Greece 27

  28. Slide 28: Boiler Fan Casing

    Boiler Fan Casing: 28

  29. Slide 29: Boiler Fan Casing, Rotors & Static Parts

    Buyer : Prony Australia Boiler Fan Casing, Rotors & Static Parts Buyer: Alcan Grove Australia 29

  30. Slide 30: Wind Tunnel

    Wind Tunnel PROJECT: BMW AVZ WIND TUNNEL FANS for HOWDEN GERMANY: Year 2006 30

  31. Slide 31: Stack

    Stack PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 31

  32. Slide 32: Stack (continue)

    Stack (continue) PROJECT: IRPC Fuel Gas Stack, Thailand Purchaser Zeeco, Inc. year 2013 32

  33. Slide 33: Incinerator

    Incinerator PROJECT: VCM 1 Equipment Replacement Owner: Thai Plastic and Chemical PLC.; year 2014 33

  34. Slide 34: Incinerator

    Incinerator PROJECT: VCM 1 Equipment Replacement, Owner: Thai Plastic and Chemical PLC.; Year 2014 34

  35. Slide 35: Drum Attrition & Homogenization

    Drum Attrition & Homogenization PROJECT: BMA Composting Plant, ONNUCH Bangkok Thailand; Year 2016 35

  36. Slide 36: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  37. Slide 37: 37

    37

  38. Slide 38: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  39. Slide 39: Project: HDPE

    PROJECT: HDPE 4 Total weight 2,350 tons year 2007 39

  40. Slide 40: Project: JRU Malaysia

    PROJECT: JRU- Malaysia Total 521 tons Year: 2011 Contractor: Aibel 40

  41. Slide 41: Project: ABBOS Chinguetti

    Project: ABBOS-04-500-0 CHINGUETTI M12 Contractor: ABB limited Year : 2004 41

  42. Slide 42: Pipe spools

    Pipe spools PROJECT: JRU -Malaysia PROJECT: JRU -Malaysia 42

  43. Slide 43: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  44. Slide 44: 44

    44

  45. Slide 45: 45

    45

  46. Slide 46: Mechanical Installation

    Mechanical Installation,

  47. Slide 47: 47

    47

  48. Slide 48: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Environment, health & safety management and compliance 48

  49. Slide 49: Organization, Manpower and Capacity

    03 Organization Manpower and Capacity President Mr. John LU 49

  50. Slide 50: Manpower by function

    Management/Admin 137 2 Permanent = 711 Temporary = 111 Engineers/supervisors 71 - Total = 822 Construction 6 /3 Formen/Technicians 128 2 QA/QC 67 - Welder 88 17 Fabrication 214 87 - 50 100 150 200 250 300 350 50

  51. Slide 51: Production capacity

    • Vessels/Equipment: 14,000 ton/year • Steel Structures/Machinery Parts: 12,000 ton/year • Piping Fabrication: 100,000 Diameter inches per year • Vessels/Spherical Tanks Erection: 1,000 ton/year • Equipment Installation: 1,000 ton/year • Steel Structure Erection: 1,000 ton/year • Piping: 100,000 dia

  52. Slide 52: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 52

  53. Slide 53: Plasma and gas cutting

    Plasma Cutting: Maximum thickness 38 mm. Work piece W 3 m. x L 15 m. Gas Cutting: Maximum thickness 300 mm. 53

  54. Slide 54: Pressing capacity

    Pressing Capacity Max. Force 900 Tons Max Load 1,500 Tons Column Span 6000 mm. (inside) Max 6 Meters Span 54

  55. Slide 55: Plate bending

    Plate bending: Diameter of roller: 800 mm. (all 3 rollers) Capacity: 125 mm. (5”) x 3,675 mm Width. 55

  56. Slide 56: Automatic submerged arc welding

    • Automatic Submerged Semi-Automatic Longitudinal Welding with Manipulator Self-Alignment Power Rolling Machine 56

  57. Slide 57: Cold forming machines

    Cold forming machine: Max diameter: 6 m. Cold forming machine: Max diameter: 3.8 m. Max thickness: 40 mm. Max thickness: 22 mm. 57

  58. Slide 58: Equipment

    Equipment Head forming and spinning inadabi 58

  59. Slide 59: Double Column Vertical Boring Machine

    Double Column Vertical Boring Machine Specification: 1 M Wide x 3 M Long x 300 mm Thickness capability 59

  60. Slide 60: NC Hydraulic Profile Bending Machine

    NC Hydraulic Profile Bending Machine: Max FB 100 x 25t x 800r 60

  61. Slide 61: High Pressure Test Pump

    High Pressure Test Pump - Output (max) 10,000 psi Vacuum pump w/ Booster E2M275 EH1200 - Rotary pump speed: 275 Flow (max) 668 sq. inch m3/hr. Booster pump speed: 1200m3/hr. 61

  62. Slide 62: Furnace capacity

    Capacity: 5.3 m.(W) x 5.3 m.(H) x 18.0 m.(L) 100 Tons Capacity: 4.5 m.(W) x 3.5 m.(H) x 6.5 m.(L) 50 – 60 Tons Up to 1,200 C degree (LPG-fired) Up to 1,200 C degree (LPG-fired) 62

  63. Slide 63: Blasting shop

    Abrasive material: Grit Shop dimension: L 25 m. x W 13 m. x H 7 m. 63

  64. Slide 64: ISO 9001:2015 certificate

    Uoyets Register Certificate of Approval Tis io omy that the Managemen! System of Unimit Engineering Public Company Limited 410/7-8 Mu 3 and 10/4 Mu 1, Chonburianbung-Pa-Yub Rd, Nongchak, Banbung, ‘chon Bur, 20170, Thailand hasbeen approved by LRGA to the folowing standarés 180 9001:2015 Charred Boso

  65. Slide 65: ASME Certificate of Authorization

    The American Society of Mechanical Engineers CERTIFICATE OF AUTHORIZATION u The named company is authorized by the American Society of Mechanical Engineers (ASME) for the scope of activly shown beloy in accordance with the applicable rules of the ASME Boller and Pressure Vessel Code. The use of the

  66. Slide 66: NBIC and ASME Certificates

    NBIC and ASME Certificates THE NATIONAL BOARD oF As CERTIFICATE OF Boller & PRESSURE VESSEL INSPECTORS {' Me AUTHORIZATION s Certificate of Authorization ‘The named company is authorized by the American Sociaty of Mechanical Engineers (ASME) forthe scope of activity shown below in accordance with th

  67. Slide 67: Certificates of Achievement

    CERTIFICATE oe ——— OF ACHIEVEMENT TIFICATE IS PROUDL GC BRANCH#6 INERY PLANT FOR TURNAROUND PROJECT MAY-JUNE 2016 ACHIVEMENT TO. UNIMIT ENGINEERING PUBLIC COMPANY LIMITED (GC6-RER-TAZ016-10A & 44: Piping Repair Work & Furnace Coil Replacement Service Package A AWARDED THIS DAY OF JUNE 30h, 2016 Mr.J

  68. Slide 68: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 68

  69. Slide 69: Location

    ation BANGKOK + Suvarnabhumi Airport, BANBUNG UNIMIT ENGINEERING PUBLIC COMPANY LIMITED Factory #1 and #2 * Factory #3 RAYONG __MAP,TA PHUT; 69

  70. Slide 70: Plant Layout Factory 1 and 2

    Plant Layout Factory 1| and 2

  71. Slide 71: Factory 1 layout

    Width = 155 m. (Front View) Length = 428 m. Area = 71,200 sq.m. Canteen 71

  72. Slide 72: Factory 2 layout

    Width = 270 m. Length = 645 m. Area = 123,216 sq.m. 72

  73. Slide 73: 73

    73

  74. Slide 74: Factory 3

    Factory 3 Start Operate in Year 2009 Width = 83 m. Length = 48 m. Area = 38,400 sq.m. 74

  75. Slide 75: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 75

  76. Slide 76: Client list

    lremtelesBisty(ERIG) f te aoe ansas City ey I" - riwa | MACCHI MITSUBISHI STEAM & POWER GENERATION Rae DUST IRGE ETE INENOOTERERIKSEN ——— e RCR Ener; ~ ad (| ———

  77. Slide 77: Client list

    @| vetcoaibel <= SAMSUNG ENGINEERING TOSHIBA © WET) ze A SS sik. Vine-seau, }urong Engineering Limited

  78. Slide 78: End user list (Petrochemical industry)

    End user List (End User) ( Petrochemical Industry ) Can Be er Vv €) Ths. wv M4// BOC bey . —- Aber of The Linde Group Oo : BASF The Chemical Company Aintle Kas -APRAUUIR Cleici¢ Air-Gas Industry em a 7 oe @lscc <> INDORAMA == PRPS yo F even OP rcwien

  79. Slide 79: End user list (continue)

    End user List (continue) uSUn ursarnTlasiaay dia (UMBU) b y J| The Bangchak Petroleum Public Company Limited TATA TATA STEEL 0K Mubadala | Petroleum

  80. Slide 80: Thank you

    Thank you

Unimit Engineering Public Company — Investor Presentation (2018) on 6ix