Unimit Engineering Public Co., Ltd. · SET:UEC

Unimit Engineering Public — Investor Presentation (January 2026)

63 slides from Unimit Engineering Public's investor presentation, January 2026

  1. Slide 1: Company Presentation

    Unimit Engineering PCL. Company Presentation www.unimit.com ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, U, U2, S and R STAMP

  2. Slide 2: Content

    Content Content 01 Company Company Information Information Company information 02 Business Location Locationsegment 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower and Capacity Equipment and Certificates 05 Equipm

  3. Slide 3: Company Information

    01 Company Company information Information  Established: April 21, 1982  Capital: THB 143 Million Registered  Stock Ticker: “UEC” (MAI* Market) since Nov 2005 Headquarter  Bangkok Office: Paradise Place Building Factory  Factory I & II: Banbung, Chonburi  Factory III: Nikom Pattana, Rayong  W

  4. Slide 4: Timeline

    Timeline Timeline Factory I completed • Listed on MAI Factory II was built on • ISO 9001:2000 • ISO 14001:2004 built in Banbung, stock market. 40 acres to house all certification extended • OHSAS 18001:2007 Chonburi. • Registered Capital productions. to Factory II • ISO 3834-2:2005 • CSR-DIW Continu

  5. Slide 5: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Company Location Location information 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower and Capacity Equipment and Ce

  6. Slide 6: Location

    Location Location Distance to Export Port From Factory I, II to  LCB Port : 60 km.  Maptaphut Port : 90 km.  Sattahip Port : 100 km. From Factory III to  Maptaphut Port : 25 km.  Sattahip Port : 55 km. 6

  7. Slide 7: Plant Layout Factory 1 and 2

    PlantLayout Plant Layout Factory Factory 1 and12 and 2 7

  8. Slide 8: Factory 1

    Factory 1 (Front View) Description Factory 1 Total Area 70,400 m2 Number of Building ▪ Office 2 ▪ Workshop 5 Shop Floor 25,480 m2 Overhead Crane ( Max. ) 30 Ton Max. Height Under Crane Hook in Shop 9M Warehouse Space indoor - 8

  9. Slide 9: Factory 2

    Factory 2 Description Factory 2 (Front View) Total Area 123,216 m2 Number of Building ▪ Office 2 ▪ Workshop 5 Shop Floor 55,987 m2 Overhead Crane ( Max. ) 40 Ton Max. Height Under Crane 9M Hook in Shop Warehouse Space indoor 960 M2 9

  10. Slide 10: Factory 3

    Factory 3 Description Factory 3 Total Area 38,400 m2 Number of Building ▪ Office 1 ▪ Workshop 1 Shop Floor 2,160 m2 Overhead Crane ( Max. ) 15 Tons Max. Height Under Crane Hook in Shop 12 M 10

  11. Slide 11: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Location Location Organization, Manpower and Capacity 03 Business Business Segment Segment Company information 04 Organization, Organization, Manpower and Capacity Manpower and Capacity Equipment and Ce

  12. Slide 12: Business Segment

    Business Segment Pressure Vessel Non-Pressure Vessel Construction Work Plate Work and Other Standard Products  Oil tank  Tank installation Fan casing LPG tanks  Water tank  Equipment Wind tunnel Cryogenic tanks  SILO installations  Diverters Custom Products  Stack  Repair and Incinerato

  13. Slide 13: Pressure Vessel (LPG)

    PressureVessel Pressure Vessel(LPG) (LPG) 23.7 ton Self support 4.3 to 10 ton Above ground installation 25.4 ton Wagon Tank 16.4 ton Self support 93 ton Bullet tank 13

  14. Slide 14: Pressure Vessel (Cryogenic)

    PressureVessel Pressure Vessel(Cryogenic) (Cryogenic) Horizontal Tank LIN-310,000 Liters Vertical tank 3,000 liters Vertical Tank LIN / LOX - 350,000 Liters14

  15. Slide 15: Pressure Vessel (Spherical Tank)

    PressureVessel Pressure Vessel(Spherical (SphericalTank) tank) 6,000 M3 Scope of work and supply is design : Site location : • Material procurement • Khon Kaen Terminal • Shop fabrication • Surat thani Terminal • Site erection, Testing and commissioning • Songkhla [4,000 m3] 15

  16. Slide 16: Pressure Vessel (Column)

    Pressure Vessel Pressure (Column) Vessel (Column) ID 5,000 mm., 60,100 TL-TL mm., 252.0 ton End user / EPC: PTT Global Chemical Public Company Limited / Chiyoda (Thailand) Ltd. and Toyo-Thai Corporation PLC. Project name: Byproduct Valued Added (BV Project) [Year 2011] 16

  17. Slide 17: Pressure Vessel (Column)

    Pressure Vessel Pressure (Column) Vessel (Column) ID 4,400 mm., 90,740 TL-TL mm. End user: Thai OLEFINS Public Company Limited Project Name : New Parallel C3 Train 17

  18. Slide 18: Pressure Vessel (Steam drum)

    Pressure Pressure Vessel Vessel (Power (Steam Plant) drum) HP Drum Maximum thickness (experience): 160 mm. 2,500 ID 11,000 mm TL-TL, 146.53 ton. LP Drum Internal Parts Installation Blow Down Tank 18

  19. Slide 19: Pressure Vessel (Deaerator)

    Pressure Vessel (Deaerator) Spray-type Process design by STORK THERMEQ Netherlands Tray-type Process design by Sterling Deaerator Company and Kansas City Deaerator Company 19

  20. Slide 20: Pressure Vessel (Heat Exchanger)

    Pressure Vessel (Heat Exchanger) Fixed tube type Waste Gas Pre- Tube Heat bundle 20

  21. Slide 21: Pressure Vessel (Offshore Product)

    Pressure Vessel (Offshore Product) Test separator Internal Parts Installation OD 3’-6” TL-TL11’ Material SA516 Gr.70N Thickness (Cone/Shell/Head) : 1-31/32” / 1-25/32” / 1-11/16” (47.9 mm. / 45 mm. / 42.86 mm.) 21

  22. Slide 22: Pressure Vessel (Reactor)

    Pressure Vessel (Reactor) Reactor Reactor 22

  23. Slide 23: Business Segment

    Business Segment Pressure Vessel Non-Pressure Vessel Construction Work Plate Work and Other Standard Products  Oil tank  Tank installation Fan casing LPG tanks  Water tank  Equipment Wind tunnel Cryogenic tanks installations Stack and Diverters  SILO Custom Products  Repair and Incinerat

  24. Slide 24: Storage Tanks

    Storage Tanks Project : EO/EG Expansion 1 , Rayong, Thailand Customer : SAMSUNG / Owner : TOCGC , Year 2008 24

  25. Slide 25: Storage Tanks

    Storage Tanks Project : Rungtawan II , Rayong , Thailand Customer : Hitachi Plant Technology ( Thailand ) Owner : JSR BST Elastomer Co.,Ltd , Year 2016 25

  26. Slide 26: Silo

    Silo Project : Sakura Project Customer : JGC Corporation Owner : AGC Vinythai Public Company Limited, Year 2023 26

  27. Slide 27: Business Segment

    Business Segment Pressure Vessel Non-Pressure Vessel Construction Work Plate Work and Other Standard Products  Oil tank  Tank installation Fan casing LPG tanks  Water tank  Equipment Wind tunnel Cryogenic tanks  SILO installations Stack and Diverters Custom Products  Stack  Repair and I

  28. Slide 28: Equipment Installation

    Equipment Installation Site Assembly and welding in Horizontal position ID 4,880 mm. X TL to TL. 38,350 Weight : 160 Tons Material (Top/Middle/Bottom) : SA516Gr.60+Monel 400 / SA516Gr.60 / SA516Gr.60+ SS316L Project : Bangchak Recondition P#3 Project [Year 2014] Purchaser : Bangchak Corporation Publ

  29. Slide 29: Equipment Installation

    Equipment Installation Project : Replacement Heat Exchanger 5 units and Piping modify at PTTGC3 , Rayong , Thailand Customer : PTTME Project : Material Upgrade for Evaporator Unit, Rayong , Thailand Owner : PTTGC., Year 2017 Owner : TOCGC / PTTGC., Year 2017 29

  30. Slide 30: Repair and modification work

    Repair and modification work 30

  31. Slide 31: Business Segment

    Business Segment Pressure Vessel Non-Pressure Vessel Construction Work Plate Work and Other Standard Products  Oil tank  Tank installation Fan casing LPG tanks  Water tank  Equipment Wind tunnel Cryogenic tanks  SILO installations Stack and Diverters Custom Products  Stack  Repair and Mo

  32. Slide 32: Plate Work: Furnace

    Plate Work Furnace Furnace PROJECT: I-PRO CAPL MANUFACTURING PROJECT: IRPC Fuel Gas Stack, Thailand OWNER/EPC: TATA India/ SANKYU 1,023.80 tons Year 2011 Purchaser Zeeco, Inc. year 2013 32

  33. Slide 33: Plate Work: Machinery Parts, Diverters

    Plate Work Machinery Parts Diverters Project: DEIR ALI II 701 MW., Damascus, Syria Boiler Fan Casing, Rotors & Static Parts 33

  34. Slide 34: Plate Work: Wind Tunnel

    Plate Work Wind Tunnel Drum Attrition & Homogenization PROJECT: BMW AVZ WIND TUNNEL FANS for HOWDEN GERMANY: Year 2006 PROJECT : BMA Composting Plant, ONNUCH Bangkok Thailand Year 2016 34

  35. Slide 35: Plate Work: Incinerator

    Plate Work Incinerator PROJECT: VCM 1 Equipment Replacement PROJECT: TTM New Incinerator Project , Thailand Owner: Thai Plastic and Chemical PLC.; year 2014 Purchaser Callidus / TRC., year 2017 35

  36. Slide 36: Pipe Spools

    Pipe Spools Pipe spools Pipe spools PROJECT: JRU –Malaysia Customer : Vetco aibel Project :Material Upgrade for Evaporator Unit, Rayong , Thailand Owner : TOCGC / PTTGC., Year 2017 36

  37. Slide 37: Pipe Spools

    Pipe Spools PROJECT: EGAT Bang Pakong CCPP (Units 1-2 Replacement) Project., Bang Pakong District, Chachoengsao Province, Thailand Customer : B&V , Owner : EGAT , Year 2018 37

  38. Slide 38: Platform & Ladder

    Platform & Ladder 38

  39. Slide 39: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Location Location Organization, Manpower and Capacity 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower and Capacity

  40. Slide 40: 03 Organization

    03 Organization Organization 40

  41. Slide 41: Manpower

    Manpower Manpower Total Manpower 2026 Total 486 (Update January 23, 2026) PLANNING / PROJECT TEAM 6 MANAGEMENT 21 Officer 5 Draftsman 13 Supervisor 3 Engineer 8 ENGINEERING 29 MARKETING 13 SAFETY 7 PROCUREMENT 9 QA/QC 41 ACCOUNTING / FINANCE 11 QUALIFIED WELDERS 53 HR & ADMIN 15 FABRICATION 176 32 2

  42. Slide 42: Production Capability

    Manpower Production Capability Shop Fabrication Rate Per Year Pressure Vessel / Equipment 8,000 Ton Structure Support / Plate Work 500 Ton Piping Fabrication 5,000 DB Construction / Site Installation Rate Per Year Pressure Vessel / Tank Erection 1,000 Ton Equipment Installation 1,000 Ton Steel Struc

  43. Slide 43: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Location Location Organization, Manpower and Capacity 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower Organization,

  44. Slide 44: Engineering Capability

    EngineeringCapability Engineering Capability • Applicable Design Code ➢ ASME Section VIII Div.1 / ASME Section VIII Div.2 ➢ API 620 / API 650 / API 653 ➢ TEMA & PD 5500 / UHX Tube Layout • Software Design Program Name Software Publisher Purpose Developer / Q’ty - Design Pressure Vessel: ASME Sec.VII

  45. Slide 45: Equipment: Cutting Machine

    Equipment Cutting Machine Plasma Cutting: Maximum thickness 38 mm. Work piece W 3 m. x L 15 m. Gas Cutting: Maximum thickness 300 mm. 45

  46. Slide 46: Equipment: Fiber Laser Cutting Machine

    Equipment Fiber Laser Cutting Machine FIBER LASER Cutting 12 KW : Maximum thickness 45 mm ( Carbon Steel ) and 50 mm ( Stainless Steel ) Work piece : W 3.5 m. x L 14 m 46

  47. Slide 47: Equipment: Hydraulic Pressing

    Equipment Equipment Hydraulic pressing 900 tons and 1,500 tons Pressing Capacity Max. Force 900 Tons Max Load 1,500 Tons Column Span 6000 mm. (inside) Max 6 Meters Span 47

  48. Slide 48: Equipment: Plate Bending

    Equipment Equipment Plate bending Plate bending: Capacity: 70 mm (Cold bend) and 125 mm (Hot Diameter of roller: 800 mm. (all 3 rollers) bend) x 3,675 mm Width. 48

  49. Slide 49: Equipment: Welding

    Equipment Equipment Welding • Automatic Submerged Semi-Automatic Longitudinal Welding with Manipulator Self-Alignment Power Rolling Machine 49

  50. Slide 50: Equipment: Head Forming and Spinning

    Equipment Equipment Head forming and spinning machine Cold forming machine: Max diameter: 6 m. Cold forming machine: Max diameter: 3.8 m. Max thickness: 40 mm. Max thickness: 22 mm. 50

  51. Slide 51: Equipment: CNC Machine Center

    Equipment Equipment CNC machine center Double Column Vertical Boring Machine Specification: 1 M Wide x 3 M Long x 300 mm Thickness capability 51

  52. Slide 52: Equipment: Vacuum and Test Pump

    Equipment Equipment Vacuum pump and High Pressure Test Pump High Pressure Test Pump - Output (max) 10,000 psi Vacuum pump w/ Booster E2M275 EH1200 Flow (max) 668 sq. inch Rotary pump speed: 275 m3/hr. Booster pump speed: 1200m3/hr. 52

  53. Slide 53: Equipment: PWHT Furnace

    Equipment Equipment Furnace for PWHT (Post Weld Heat Treatment) Capacity: 5.3 m.(W) x 5.3 m.(H) x 18.0 m.(L) 100 Tons Capacity: 4.5 m.(W) x 3.5 m.(H) x 6.5 m.(L) 50 – 60 Tons Up to 1,200 C degree (LPG-fired) Up to 1,200 C degree (LPG-fired) 53

  54. Slide 54: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Location Location Organization, Manpower and Capacity 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower Organization,

  55. Slide 55: Material Experienced

    MaterialExperienced Material Experienced Thickness Material (Plate) Specifications Sourcing Range (mm) SA516 Gr. 60 / 60N Thailand : SPM , LPN SA516 Gr. 70 / 70N Japan: NSCC, KOBE, JFE Carbon Steel SA516 Gr. 60 / 60N + HIC 6-125 Korea: POSCO, Dongkuk, Hyundai SA516 Gr. 70 / 70N + HIC Taiwan: CSC Eur

  56. Slide 56: Reference Work

    Reference Work Reference Experience Fabrication Largest Diameter Inside Diameter 6,000 mm (Year 2008) High Pressure Blow Down Vessel for SKE&C Longest Length 120 m including skirt support (Year 2004) Column for Thai Olefins Public Company Limited Heaviest Shell Thickness - Carbon Steel 156 mm HP Ste

  57. Slide 57: Company Certificates

    Company Certificates ISO Certificate Certificate Subject Issued Date Expired Date Certificate Issued By Number ISO 9001:2015 Quality Management System 22-Nov-25 21-Nov-28 10724335 LRQA Limited Environmental Management ISO 14001:2015 25-Jan-26 24-Jan-29 10741881 LRQA Limited System Health & Safety Ma

  58. Slide 58: Content

    Content Content 01 Company Company Information Information Organization, Manpower and Capacity 02 Location Location Organization, Manpower and Capacity 03 Business Business Segment Segment Organization, Manpower and Capacity 04 Organization, Organization, Manpower and Capacity Manpower Organization,

  59. Slide 59: Client Lists (EPC)

    Unimit Engineering Public Company Limited Kansas City Deaerator COMPANY STERLING DEAERATOR COMPANY © ALSTOM eM PoweR-srsTEeMs Reser: @ Babcock Power Howde ROR Ener, “ae By @ VEOUA | BLACK & VEATCH INENOOTERERIKSEN SIEMENS lagenuity for fe

  60. Slide 60: Client List (EPC) continue

    Client Lists Client List(EPC) (EPC) continue 60

  61. Slide 61: End User Lists

    End User End user Lists List Air-Gas Industry Petrochemical Industry

  62. Slide 62: End User Lists (continue)

    End User Lists (continue) Oil & Gas and Refinery Industry Other Industry 62

  63. Slide 63: Thank you

    Thank you 63

Unimit Engineering Public Company — Investor Presentation (January 2026) on 6ix