  1. Slide 1: The Industrial Application of Ultrafiltration and Reverse Osmosis for the Recovery of Cu, Ag and CN

    The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. A.J. Monhemius Anglo Asian Mining plc 1

  2. Slide 2: Disclaimer

    Disclaimer The information in this document is subject to updating, revision and amendment. This document neither constitutes nor forms nor should beconstructed as constituting or forming part of any offer or invitation to sell or any solicitation of any offer to purchase or to subscribe for any sec

  3. Slide 3: Azerbaijan Geography

    Azerbaijan Geography *Gedabek 3

  4. Slide 4: Flow diagram of the ore processing facilities at Gedabek

    Flow diagram of the ore processing facilities at Gedabek O/F Gedabek Leach Open Pit Grinding Thickener High Mine Grade U/F Ore Low Grade Ore U/F Tailings Resin-in- Agitation Thickener Pulp Leach Plant O/F Loaded Eluted Resin Resin SART Cu/Ag ADR PLS Sulphide Pond Conc. Gold Doré BLS Heap Pond Leach

  5. Slide 5: Gedabek Process Plant

    Gedabek Process Plant eis. EXtRACTIO {\\ August 26-29, 2028 - Ottawa, Ontario, Canada 0902018

  6. Slide 6: Typical Process Solution Compositions

    Typical Process Solution Compositions • Copper - 500 – 1000 mg/L • Gold - 0 - 0.25 mg/L • Silver - 1.0 mg/L • Cyanide - WAD CN 600 - 1200 mg/L Free CN 0 - 100 mg/L • Calcium - 600 mg/L • Sulphate - 2000 mg/L 6

  7. Slide 7: Flow diagram for the pilot plant tests

    A bleed stream of the tailings dam return water was fed to the plant as illustrated in the block flow diagram (Figure 2) and described below. Flow diagram for the pilot plant tests Tailings Dam Return Water Process water UF PLANT Suspended Solids RO Plant Feed Bufferwater Process Tank RO Plant Anti-

  8. Slide 8: Results from pilot plant tests

    Results from pilot plant tests 8

  9. Slide 9: Flow diagram of the industrial UF/RO plant

    Flow diagram of the industrial UF/RO plant Process water 9

  10. Slide 10: Gedabek Process Plant

    Gedabek Process Plant EXTRACTION (August 26-29, 2028 - Ottawa, Ontario, Canada organized by, < MET ESOC 0902018

  11. Slide 11: Blank

    August 26-29, 2028 - Ottawa, Ontario, Canada

  12. Slide 12: Blank

    [\\ August 26-29, 2028 - Ottawa, Ontario, Canada

  13. Slide 13: Sand Filters

    Sand Filters ™ \ August 26-29, 2028 - Ottawa, Ontario, Canada

  14. Slide 14: Ultrafiltration Modules

    Ultrafiltration Modules Blank 14

  15. Slide 15: Reverse Osmosis Modules

    Reverse Osmosis Modules Blank 15

  16. Slide 16: Blank

    EXIRAC THOR August 26-20, 2028 - ottawa, Ontario, Canada 0902018

  17. Slide 17: Mean results from the industrial UF/RO plant (May 2018)

    Mean results from the industrial UF/RO plant (May 2018) Average clean water output: 400m3/day * The CN is free cyanide in all cases except for Final output which is the sum of Free + WAD cyanide 17

  18. Slide 18: UF/RO Water Treatment Plant Cost Data

    UF/RO Water Treatment Plant Cost Data Data for May 2018 Power consumption (month) = 67000 kwh Power cost (month) = 5140 AZN (USD 1 = 1.7 AZN) Clean water production (month) = 12500 m3 (403 m3/day) Power consumption = 5 kwh/m3 Unit cost = 0.41 AZN/m3 = 24 cents US/m3 c.f. Transported water from river

  19. Slide 19: Conclusions

    Conclusions • Laboratory and pilot plant tests showed that a combination of ultrafiltration and reverse osmosis can be used to produce clean water from cyanide leach solutions that are saturated with calcium and contain up to at least one gram per litre of copper. • An industrial-scale UF/RO plant h