The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. A.J. Monhemius Anglo Asian Mining plc 1
Slide 2: Disclaimer
Disclaimer The information in this document is subject to updating, revision and amendment. This document neither constitutes nor forms nor should beconstructed as constituting or forming part of any offer or invitation to sell or any solicitation of any offer to purchase or to subscribe for any sec
Slide 3: Azerbaijan Geography
Azerbaijan Geography *Gedabek 3
Slide 4: Flow diagram of the ore processing facilities at Gedabek
Flow diagram of the ore processing facilities at Gedabek O/F Gedabek Leach Open Pit Grinding Thickener High Mine Grade U/F Ore Low Grade Ore U/F Tailings Resin-in- Agitation Thickener Pulp Leach Plant O/F Loaded Eluted Resin Resin SART Cu/Ag ADR PLS Sulphide Pond Conc. Gold Doré BLS Heap Pond Leach
Slide 5: Gedabek Process Plant
Gedabek Process Plant eis. EXtRACTIO {\\ August 26-29, 2028 - Ottawa, Ontario, Canada 0902018
Slide 6: Typical Process Solution Compositions
Typical Process Solution Compositions • Copper - 500 – 1000 mg/L • Gold - 0 - 0.25 mg/L • Silver - 1.0 mg/L • Cyanide - WAD CN 600 - 1200 mg/L Free CN 0 - 100 mg/L • Calcium - 600 mg/L • Sulphate - 2000 mg/L 6
Slide 7: Flow diagram for the pilot plant tests
A bleed stream of the tailings dam return water was fed to the plant as illustrated in the block flow diagram (Figure 2) and described below. Flow diagram for the pilot plant tests Tailings Dam Return Water Process water UF PLANT Suspended Solids RO Plant Feed Bufferwater Process Tank RO Plant Anti-
Slide 8: Results from pilot plant tests
Results from pilot plant tests 8
Slide 9: Flow diagram of the industrial UF/RO plant
Flow diagram of the industrial UF/RO plant Process water 9
Slide 10: Gedabek Process Plant
Gedabek Process Plant EXTRACTION (August 26-29, 2028 - Ottawa, Ontario, Canada organized by, < MET ESOC 0902018
Slide 11: Blank
August 26-29, 2028 - Ottawa, Ontario, Canada
Slide 12: Blank
[\\ August 26-29, 2028 - Ottawa, Ontario, Canada
Slide 13: Sand Filters
Sand Filters ™ \ August 26-29, 2028 - Ottawa, Ontario, Canada
Slide 14: Ultrafiltration Modules
Ultrafiltration Modules Blank 14
Slide 15: Reverse Osmosis Modules
Reverse Osmosis Modules Blank 15
Slide 16: Blank
EXIRAC THOR August 26-20, 2028 - ottawa, Ontario, Canada 0902018
Slide 17: Mean results from the industrial UF/RO plant (May 2018)
Mean results from the industrial UF/RO plant (May 2018) Average clean water output: 400m3/day * The CN is free cyanide in all cases except for Final output which is the sum of Free + WAD cyanide 17
Slide 18: UF/RO Water Treatment Plant Cost Data
UF/RO Water Treatment Plant Cost Data Data for May 2018 Power consumption (month) = 67000 kwh Power cost (month) = 5140 AZN (USD 1 = 1.7 AZN) Clean water production (month) = 12500 m3 (403 m3/day) Power consumption = 5 kwh/m3 Unit cost = 0.41 AZN/m3 = 24 cents US/m3 c.f. Transported water from river
Slide 19: Conclusions
Conclusions • Laboratory and pilot plant tests showed that a combination of ultrafiltration and reverse osmosis can be used to produce clean water from cyanide leach solutions that are saturated with calcium and contain up to at least one gram per litre of copper. • An industrial-scale UF/RO plant h