Tambourah Metals Ltd · ASX:TMB
Tambourah Metals — Investor Presentation (February 2026)
22 slides from Tambourah Metals's investor presentation, Feb 17, 2026
Slide 1: Investor Presentation February 2026
Investor Presentation February 2026 Tambourah Metals Ltd Mines & Money Connect Melbourne ASX: TMB 1 February 2026 tambourahmetals.com.au
Slide 2: Forward Looking Statements and Disclaimer
Forward Looking Statements and Disclaimer The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products The information contained in this presentation is not investment or finan
Slide 3: Corporate Overview
Corporate Overview Rita Brooks • 30+ years’ experience in minerals exploration industry Executive Chairperson • Founding Director of gold and nickel explorer Berkeley Resources Ltd BA(Ed) • Director of several private companies and extensive experience across mineral exploration throughout Australia
Slide 4: Advanced Gold and Critical Minerals
Advanced Gold and Critical Minerals
Slide 5: Overview
Overview Beatty Park Sth Tambourah Goldfield Speewah Nth Project High Grade Gold Results Tambourah King Antimony-Silver-Copper-Gold High-grade gold intersection from a diamond drill hole Strong antimony, silver and copper results reported • 24m at 18.8g/t Au from 20m in BPAC028, collared along the n
Slide 6: Gold and Critical Minerals Exploration in Western Australia
Gold and Critical Minerals Exploration in Western Australia Tambourah Metals…. a strong focus on gold Tambourah Project Locations TMB is a uniquely positioned gold company with 100% owned gold projects in the Bryah Basin including Beatty Park Sth. The Bryah Basin is host to multiple gold mines inclu
Slide 7: The Bryah Basin Gold Projects
The Bryah Basin Gold Projects A large tenement portfolio in a Tier One address: Tambourah has a significant 467 km2 tenement package located 160km north of Meekatharra, Western Australia. • New high-grade gold discovery at Beatty Park Sth (E52/4332) • Results of a 55-line km high-resolution SAM (sub
Slide 8: Beatty Park Sth – Results of SAM Survey
Beatty Park Sth – Results of SAM Survey • A SAM (sub-audio magnetic) survey comprising 55-line km of data was completed in November by GAP Geophysics. • High resolution total magnetic intensity (TMI) magnetometric conductivity (MMC) data collected over a 2km by 1km area surrounding high grade gold i
Slide 9: Beatty Park Sth Gold
Beatty Park Sth Gold • First-pass drilling tested 120m of the approximately 500m long +20ppb gold in soil anomaly. • Extensive +0.1g/t mineralised halo intersected across all five air core traverses. • Mineralisation is open along strike and at depth. • The second phase of AC drilling completed at t
Slide 10: Beatty Park Sth – Drill Hole Re-Sampling
Beatty Park Sth – Drill Hole Re-Sampling • Eighty-three 1m samples were collected from aircore drill holes reporting significant gold from 4m composite sampling (BPAC027, 028, 030 and 031). • Re-sampling confirmed the exceptional shallow gold intersections in BPAC028 • 10m at 38.9g/t Au from 22m, in
Slide 11: Baxter Sth Gold
Baxter Sth Gold • Baxter Sth Project is 4km south of the historic Harmony mine (250,000 oz Au). • The project consists of a NW trending strongly folded Narracoota and Ravelstone Formation (Fm). • The contact of the Narracoota and Ravelstone Fms is a favoured site for gold mineralization in the Bryah
Slide 12: Gold in the Pilbara
Gold in the Pilbara Tambourah Goldfield Tambourah Pilbara Project Locations ✓ The Pilbara is well-known for gold discoveries in recent years including Northern Star’s Takeover of De Grey for $5B ✓ 13.6M Oz equates to ~$360+ per Oz ✓ De Grey focused on the Mallina Shear Zone following historic workin
Slide 13: Tambourah Goldfield
Tambourah Goldfield • Tambourah Goldfield has over 20 prospects which produced 1 oz per ton Au in the 1890s. • 5000 ounces of gold was mined from the 1890s • With over 3km of strike, the company has consolidated all the historic gold mines and prospects at Tambourah. • At Tambourah King the Company
Slide 14: Tambourah King Gold Summary
Tambourah King Gold Summary • Shallow in-fill RC drilling at Tambourah King confirms continuation of high-grade gold intersections. o 2m at 49.7g/t Au from 50m, including 1m at 97.6g/t from 51m in TBRC25035. o 2m at 7.7g/t Au from 37m, including 1m at 13g/t Au from 37m in TBRC25036. o 1m at 7.2g/t A
Slide 15: Exploration Resource Definition at the Tambourah King Gold
Exploration Resource Definition at the Tambourah King Gold Diamond drill core at Tambourah in 2025 Tambourah King looking east long section 15
Slide 16: Alexandria and Young Australian Gold Prospects
Alexandria and Young Australian Gold Prospects • The first diamond drill hole completed at Alexandria, TBRD25027, was collared 100m north of the closest RC drill hole (TBRC25029) and intersected high-grade gold associated with the quartz lode, reporting 0.2m at 23.6g/t Au from 67.7m from an interpre
Slide 17: Critical Minerals
Critical Minerals Speewah Nth - Antimony, Silver, Copper and Gold • Tambourah is the first company to focus on high-grade silver and antimony in the Speewah Dome with the polymetallic vein system developed over 7km of strike. • The tenement covers an area of 181km2 and is located over the northern h
Slide 18: Speewah Nth - Sb, Ag, Cu and Au
Speewah Nth - Sb, Ag, Cu and Au Speewah Nth – Rock Chip Assay Results • Historic exploration identified a large system of mesothermal-epithermal polymetallic veins within the Speewah Dome, near the contact of an upper granophyric unit of the Hart Dolerite and overlying sediments. • The Chapman-Hayde
Slide 19: Critical Minerals
Critical Minerals Speewah Nth - Antimony, Silver, Copper and Gold • Strong antimony, silver and copper results reported from two phases of surface sampling completed at the historic Catto, Hayden’s and Chapman’s prospects. High-grade polymetallic mineralisation was reported from mesothermal-epitherm
Slide 20: Proposed Work Programs 2026
Proposed Work Programs 2026 Projects Q1 2026 Q2 2026 Q3 2026 Q4 2026 • Mapping and sampling of new exploration licenses • Resource calculation of Beatty Park – Au • Beatty Park DD drilling • RC and DD drilling • Beatty Park drilling shallow gold targets continues • Follow up RC drilling • New drill
Slide 21: Pathway to Value Creation
Pathway to Value Creation CRITICAL MINERALS GOLD GOLD RESOURCE ➢ Lean organisation - ➢ New gold discovery DEVELOPMENT project generator at Beatty Park Sth ➢ Strong Gold price ➢ Using applied research• ➢PROJECT First RC drilling at ➢ Advancing Tambourah to develop critical • Extensive Beatty Park Sth
Slide 22: Contact Us
CONTACT US For more information please contact: Rita Brooks | Exec Chairperson Rita.Brooks@tambourahmetals.com.au +61 8 9481 8669 ASX:TMB Bill Clayton | Geology Manager Non–Executive Director Bill.Clayton@tambourahmetals.com.au +61 8 9481 8669 tambourahmetals.com.au linkedin.com/company/tambourahmet
Tambourah Metals — Investor Presentation (February 2026) on 6ix