31 slides from Antioquia Gold's conference presentation, March 2016

  1. Slide 1: High-grade Gold Production Development in Colombia

    High-grade Gold Production Development in Colombia PDAC, March 2016

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation may contain forward-looking events or performance are not statements of statements concerning the Company’s plans for historical fact and may be “forward-looking its properties, operations and other matters. statements”. Should one or more of these risks These statements

  3. Slide 3: Cisneros location

    Cisneros location Santa Rosa Red Eagle Cisneros Gramalote Antioquia Gold Anglo/B2Gold Medellin • Paved highway, <2 hours from Medellin • Good infrastructure including power, water and gas • Proximity to other notable gold projects TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  4. Slide 4: Board of Directors

    Board of Directors Felipe Ferraro Clever Schrader Director and Chairman of the Board Director • B.Sc in agricultural engineering and MA in business • Seasoned professional with forty years of experience in administration from the University ESAN-Stanford University underground gold mine exploration

  5. Slide 5: Management Team

    Management Team Felipe Ferraro • Strong background in mining finance President and CEO, Director • Manager of Administration & Finance at Cori • B.Sc in agricultural engineering and MA in business Puno, a CMH subsidiary administration from the University ESAN-Stanford James (Jim) Decker, P. Eng. Uni

  6. Slide 6: Key Players

    Key Players TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  7. Slide 7: Background

    Background • History • 2007 – Private investor group acquired core Guayabito property • 2008 – Formed Antioquia Gold Inc. via reverse takeover • 2009 to present – project advancement • Acquisitions • Guayabito • La Manuela • Pacho Luis • Santo Domingo • Guayabito Sur • Exploration • Mapping/Sampling

  8. Slide 8: Acquisitions

    Acquisitions TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016 8

  9. Slide 9: Initial Mining Areas

    Initial Mining Areas Guayabito Guaico TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016 9

  10. Slide 10: Community Relations

    Community Relations • Highlights • Communication Network • Employment of Locals • Reclamation • Input for EIA permitting • Financial Support for Community Projects • Census of Land Owners/Residents TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  11. Slide 11: Resource Estimate

    Resource Estimate TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  12. Slide 12: Exploration Potential

    Exploration Potential TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  13. Slide 13: Mine Development

    Mine Development • Mechanized underground mining with trackless equipment (30t trucks, 3.5m3 scoops, jumbo drills) • 500 tpd mine and process plant; 250 tpd first 2 years, 500 tpd thereafter • 15,000 oz Au for first 2 years, increase to 30,000 oz Au/yr thereafter • Processing circuit with gravity, f

  14. Slide 14: Mine Plan

    Mine Plan Mining % Cost Cut-off * Equipment Backfill Method Production US$/t (g Au/t) Mechanized 67% 13.87 2.55 Jumbo & 70% Waste Backfill Cut and Fill 3.5 m3 Scoop 30% Hydraulic Backfill Cut and Fill 15% 21.31 2.84 Jackleg & 100% Hydraulic Backfill with Special 1 m3 Scoop Equipment Shrinkage 18% 25

  15. Slide 15: 3.5 m3 Cat Scoop

    3.5 m3 Cat Scoop TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  16. Slide 16: Single Jumbo

    Single Jumbo TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  17. Slide 17: Explosives Magazine

    Explosives Magazine TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  18. Slide 18: Guaico Tunnel – February 21

    Guaico Tunnel – February 21, 2016 TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  19. Slide 19: Guaico/Guayabito Tunnel Section View

    Guaico/Guayabito Tunnel Section View TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  20. Slide 20: Guaico Portal Area

    Guaico Portal Area TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  21. Slide 21: Guaico Long Section

    Guaico Long Section Key  +1.0 g/t Au  0.1-1.0 g/t Au 43.7 g/t Au GCFW5 GCO Structure Structure TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  22. Slide 22: Guaico Vein – 1.5m

    Guaico Vein – 1.5m TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  23. Slide 23: Guayabito Long Section

    Guayabito Long Section C C’ B’ B Key  +1.0 g/t Au  0.1-1.0 g/t Au 31.3 g/t Au El Bolo GYB2 Structure Structure TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  24. Slide 24: Guayabito Plant & Infrastructure Layout

    Guayabito Plant & Infrastructure Layout Plant Site Shop Guayabito Portal Hydraulic Backfill Plant Warehouse Office/Dry Complex TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  25. Slide 25: Guayabito Plant & Portal

    Guayabito Plant & Portal TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  26. Slide 26: Mine Development Renders

    Mine Development Renders Guaico Guayabito TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  27. Slide 27: Cisneros Metallurgy/Flotation Testing

    Cisneros Metallurgy/Flotation Testing Metallurgical tests indicate >95% gold Unit Guaico Guayabito recovery Mineral weight g 1,000 1,000 Au head grade g/t 5.3 6.7 analyzed Au head grade g/t 5.7 6.6 calculated Granulometry -200 % 60 60 mesh Density Kg/L 1.3 1.3 Conditioning time Min 5 5 100 Initial p

  28. Slide 28: Project Financing in Place

    Project Financing in Place • Capex US$18M • US$3M from cash flow from 1Q17 • Infinita unsecured US$15M loan • ~8% loan interest • Two-year grace period • US$6M drawn to date • US$12M to draw down in 2016 Value creation + = Reduced risk TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016

  29. Slide 29: Mine Development Timeline

    Mine Development Timeline Mine Ore Development Guaico Production Ongoing 2016 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2017 Env’l & Mining Infrastructure Ore Guayabito & Mine Production Permit Development Testing Detailed & Construction Plant Engineering Commissioning TSX-V: AGD OTCQX

  30. Slide 30: Current Status – Full Steam Ahead

    Current Status – Full Steam Ahead • Permits in hand for Guaico • Guaico Tunnel & Infrastructure close to completion • Guayabito Tunnel & Infrastructure awaiting permit • Plant detailed engineering ongoing • Contractors working well • Other • Guaico underground diamond drilling • Guayabito South Expl

  31. Slide 31: Thank You

    Conclusion Thank You TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016