Antioquia Gold Inc · OTC:AGDXF
Antioquia Gold — Investor Presentation (September 2017)
38 slides from Antioquia Gold's investor presentation, September 2017
Slide 1: Cisneros Project in Colombia
Cisneros Project in Colombia September 2017
Slide 2: Disclaimer
DISCLAIMER This presentation may contain forward-looking forward-looking statements. statements concerning the Company’s plans for its Forward-looking statements are made based on properties, operations and other matters. These management’s beliefs, estimates and opinions on the statements refer to
Slide 3: Cisneros location
Cisneros location Santa Rosa Red Eagle Cisneros Gramalote Antioquia Gold Anglo/B2Gold Medellin • Paved highway, <2 hours from Medellin • Good infrastructure including power, water and gas • Proximity to other notable gold projects TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 4: Management Team
Management Team Gonzalo de Losada Chairman, President and CEO, Director • Mr. De Losada is an Economist from the Universidad del Pacifico (Peru), and holds an MBA degree from Columbia University in New York and has over 20 years of experience in banking and business. He previously held senior execut
Slide 5: Background
Background • History • 2007 – Private investor group acquired core Guayabito property • 2008 – Formed Antioquia Gold Inc. via reverse takeover • 2009 - 2013 Exploration Programs • 2013 – Guaico Enviromental Permit approval • 2015 – Start of development Guaico Mine • 2016 – Guayabito Enviromental Per
Slide 6: Resource Estimate
Resource Estimate Cisneros Resources Highlights: Updated Mineral Resources for the Cisneros Properties, above cutoff grade for all mineralized structures consist of 509,508 tonnes of Measured + Indicated Mineral Resources with an average grade of 5.95 g/t Au and 495,771 tonnes of Inferred Mineral
Slide 7: Acquisitions
Acquisitions TSX-V: AGD www.antioquiagoldinc.com September 2017 7
Slide 8: Initial Mining Areas
Initial Mining Areas Guayabito Guaico TSX-V: AGD www.antioquiagoldinc.com September 2017 8
Slide 9: Current Status
Current Status • Guaico Infrastructure well advanced • Guayabito Tunnel & Infrastructure underway • Plant detailed engineering complete, major components on site or en route • Contractors working well • Other • Drilling to Increase Reserves • Guaico underground diamond drilling to define Nus vein st
Slide 10: Guaico Current Development Tunnels
Guaico Current Development Tunnels Ventilation Shaft Ramp Access – Niv1275 Explosives Magazine Level 1235 TOTAL DEVELOPMENT TUNNELS Secctions Total 1.5X1.5 140.0 1.8D 75.98 Level 1160 2.4D 136.1 2.7x3 1448.24 3X3 778.5 4.5x4 1098.41 4X4 1095.1 Total general 4772.2 TSX-V: AGD www.antioquiagoldinc.com
Slide 11: Guaico Development Plan
Guaico Development Plan GCO, FW3, FW5 (C&F) Nus shear Zone (B&F) TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 12: Nus Fault – Continuity along the strike
Nus Fault – Continuity along the strike and at depth LONG SECTION Development on 3 main levels at Guaico - Structure is open at depth TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 13: Guaico Vein - Continuity along depth
Guaico Vein - Continuity along depth LONG SECTION Development on Level 1160 and ongoing sampling in seven pivot ramps. The structure is open at depth. TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 14: Exploration Drilling Targets
Exploration Drilling Targets Exploration targets for 3,000 meter surface diamond drill program Q3, 2017 TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 15: Resource Enhancement Drilling
Resource Enhancemet Drilling TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 16: Mine Development Guaico Mine
Mine Development Guaico Mine • Mechanized underground mining with trackless equipment (35t trucks, 3.5yr3 scoops, jumbo drills) • Anticipated 250 tpd will be mined • At lest 3 tensional veins expected to be mined (Guaico, FW3 and fw5) by Cut & Fill Method. • Nus shear zone expected be mined by Bench
Slide 17: Jumbo Atlas Copco Boomer
Jumbo Atlas Copco Boomer 282 TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 18: 25 ton Dumper CAT
25 ton Dumper CAT 730 TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 19: 3.5 yd3 Atlas Copco Scoop
3.5 yr3 Atlas Copco Scoop TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 20: 3.5 yd3 Atlas Copco Scoop
3.5 yr3 Atlas Copco Scoop TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 21: Raise Boring
Raise Boring TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 22: Equipments
Equipments 3.5 SCOOPTRAM RBM CAT 730 BOOMER 282 TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 23: Guayabito
Guayabito • Mechanized underground mining with trackless equipment (25t trucks, 3.5yr3 scoops, jumbo drills) • Anticipated 250 tpd will be mined and processes at Cisneros plant • At lest 6 veins expected to be mined (El Bolo, GYB, GYB2, GYB3, GYBF, GYBF1) by Cut & Fill Method. • Mineralized to a dep
Slide 24: Guayabito Process Plant and other Civil Works
Guayabito Proces Plant and other Civil Works • 2.5 Km of Access Roads. • 185.000 M3 of earthworks • 7 years capacity for tailing storage • 9.4 km of pipeline for tailings transport. • 500 tpd process Plant • Top Soil Deposit TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 25: Cisneros Plant 3D View
Cisneros Plant 3D View 1 3 4 2 5 6 9 7 8 10 13 12 11 TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 26: Cisneros Plant Layout
Cisneros Plant Layout Process Plant Layout • 500 tpd process plant; 250 tpd first year, 500 tpd thereafter • Anticiapted 15,000 oz Au for first year, increase to 30,000+ oz Au/yr thereafter • Processing circuit with gravity separation, flotation • Metallurgical tests indicate >95% gold recovery TSX-
Slide 27: Cisneros Plant Flow Sheet
Cisneros Plant Flow Sheet TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 28: Guayabito Panorama
Guayabito Panorama Warehouse Camps Powder Magazine Top Soil Deposit Deposit Water Treatment Plant TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 29: Guayabito Panorama
Guayabito Panorama Process Pant Access Ramp Access Water Treatment Plant TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 30: Guayabito Panorama
Guayabito Panorama Process Pant Access Ramp Access PTARI Top Soil Deposit TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 31: Guayabito Panorama
Guayabito Panorama Top Soil Deposit Top Soil Deposit Temporal Equipment Platforms TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 32: Community Relations
Community Relations • Highlights • Education & Culture • Community Infrastructure TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 33: Community Relations
Community Relations • Highlights • Capacity Building • Stake holders Relationship • Health TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 34: Environmental Highlights
Environmental • Highlights • Water management • Landscape • Water and Air Quality Monitoring TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 35: Environmental Highlights
Environmental • Highlights • Flora management TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 36: Environmental Highlights
Environmental • Highlights • Fauna management TSX-V: AGD www.antioquiagoldinc.com September 2017
Slide 37: Next Steps
Next Steps • Additional surface and underground diamond drilling to confirm mineralization Q3 2017 • Continued ramp work and earthworks Q3 2017 • Delivery and installation of final equipment for Mill Q1 2018 • Equipment testing and final installation Q1 2018 • Mill commissioning and final testing Q2
Slide 38: Guaico Panorama
Guaico Panorama TSX-V: AGD www.antioquiagoldinc.com September 2017