Gibb River Diamonds Limited · ASX:GIB
Gibb River Diamonds — Corporate Update (May 2023)
14 slides from Gibb River Diamonds's corporate update, May 25, 2023
Slide 1: Edjudina Gold Project
Edjudina Gold Project Eastern Goldfields, WA May 2023
Slide 2: Edjudina Gold Project – GIB 100%
Edjudina Gold Project – GIB 100% Eastern Goldfields, Western Australia • Shallow/outcropping gold lodes • Discovery of the Neta Prospect by GIB includes 36m @ 3.97g/t from 4m. Numerous high grade intersections • Excellent exploration potential with 13km of workings along strike. Many drill ready tar
Slide 3: Edjudina - Neta Prospect Discovery
Edjudina - Neta Prospect Discovery Neta Discovery Drill Intersections 36m at 3.97g/t from 4m 18m at 3.10g/t from 28m 24m at 1.44g/t from surface 8m at 2.91g/t from 26m 14m at 1.20g/t from 1m 21m at 1.74g/t from 38m 1m at 35.0g/t from 7m 29m at 0.86g/t from surface • High grade core at Carlsen Lode •
Slide 4: Neta Prospect - Historical Producer
Neta Prospect - Historical Producer 4
Slide 5: Edjudina Gold Project Neta Discovery
Edjudina Gold Project Neta Discovery Drilling at Neta Discovery Carlsen Lode: outcrop in artisanal workings 1m @ 5.95 g/t 5
Slide 6: Neta Prospect Cross Sections
Neta Prospect Cross Sections 6
Slide 7: Neta Prospect: Carlsen Lode Long Section
Neta Prospect: Carlsen Lode Long Section 7
Slide 8: Edjudina Gold Project – Historic Workings
Edjudina Gold Project – Historic Workings 13 km strike of historic workings prospective for further discoveries Edjudina Gold Project: some of the historic gold workings which extend for over 13km of strike Sample ER006, taken by GIB; sheared sericite-hematite- limonite-quartz vein; 12.7 g/t Au 8
Slide 9: Edjudina Gold Project – Targets
Edjudina Gold Project –Targets 1 Drill Targets Include: • Multiple parallel lines of nearly continuous historic gold workings over 12km • Follow-up of numerous GIB reconnaissance drilling hits including: i. Ace of Hearts: 7m @ 2.53g/t from 9m. Open strike for 900 metres ii. Gawler: 700m of substanti
Slide 10: Edjudina – Drill Targets
Edjudina –Drill Targets 2 Ace of Hearts Target: 7m @ 2.53g/t from 9m. Open along strike for 900 metres Gawler Prospect Main Shaft 10
Slide 11: Edjudina Gold Project – Drill Targets
Edjudina Gold Project –Drill Targets 3 Perseverance Prospect Targets For Follow-up Drilling 11
Slide 12: Edjudina Gold Project – Lookahead
Edjudina Gold Project – Lookahead Future Work • Report JORC Resource – currently being compiled • Progress mining lease application to grant • Assess old leach dumps • Numerous exploration Edjudina Gold targets for follow-up Project: some of drilling the historic gold workings which • Assess related
Slide 13: Disclaimer
Disclaimer This presentation is an overview of the Company prepared with good intention. It is not a prospectus and offers no securities for subscription or sale in any jurisdiction, nor a securities recommendation. All information necessary for investment decisions is not contained herein and inves
Slide 14: For further information
For further information Contact: Jim Richards Executive Chairman T +61 8 9422 9500 E info@gibbriverdiamonds.com 1/16 Ord Street, West Perth, WA 6005 gibbriverdiamonds.com ASX Code: GIB 14