Gibb River Diamonds Limited · ASX:GIB

Gibb River Diamonds — Shareholder Meeting (November 2022)

19 slides from Gibb River Diamonds's shareholder meeting presentation, Nov 17, 2022

  1. Slide 1: AGM Presentation

    AGM Presentation 17 November 2022

  2. Slide 2: GIB is an ASX Listed, Multi-commodity Exploration and Development Company

    GIB is an ASX Listed, Multi-commodity Exploration and Development Company ASX Code: GIB Total Shares on Issue 211,509,445 % of Major Shareholders Shares Capital Market Capitalisation Jim Richards 41,683,592 19.7 $12.3 M (undiluted at $0.058/share) Other Directors 9,273,888 4.4 Cash on Hand (31 Sept)

  3. Slide 3: Board of Directors & Management

    Board of Directors & Management Mr. Jim Richards BSc Hons (Geology), Executive Chairman 28 years experience in mining and exploration Non-Executive Non-Executive Exploration Director & Company Director Manager Secretary Tom Reddicliffe Michael Denny Grant Mooney 3

  4. Slide 4: Projects Summary

    Projects Summary 1. Lithium Generative Project, WA GIB 100% • 2,045km2 of tenements prospective for lithium/REE in WA • Identified as prospective based upon data reviews, remote sensing and/or proximity to existing lithium-REE mines/occurrences • Ongoing field follow-up, pegmatites identified at Mou

  5. Slide 5: Lithium Generative Project (LGP) GIB 100%

    Lithium Generative Project (LGP) GIB 100% • LGP aims to generate and/or acquire lithium-REE projects • 16 tenements for 2,045 km2 • Prospectivity based upon data reviews, remote sensing and/or proximity to existing lithium-REE mines/occurrences • Ongoing systematic field follow-up • Five new pegmati

  6. Slide 6: Edjudina Gold Project – GIB 100%

    Edjudina Gold Project – GIB 100% Eastern Goldfields, Western Australia • Shallow/outcropping gold lodes • Discovery of Neta Lodes prospect includes 36m @ 3.97g/t from 4m. Numerous high grade intersections • New target generated at Ace of Hearts includes 7m @ 2.53g/t from 9m. Open for 900m N-S • 8 dr

  7. Slide 7: Edjudina Gold Project – Discovery at Neta Lodes

    Edjudina Gold Project – Discovery at Neta Lodes GIB Discovery at Neta Lodes 36m at 3.97g/t from 4m 18m at 3.10g/t from 28m 24m at 1.44g/t from surface 8m at 2.91g/t from 26m 14m at 1.20g/t from 1m 21m at 1.74g/t from 38m 1m at 35.0g/t from 7m 29m at 0.86g/t from surface • High grade core at Carlsen

  8. Slide 8: Edjudina Gold Project Neta Lodes Discovery

    Edjudina Gold Project Neta Lodes Discovery Drilling at Neta Lodes Discovery Carlsen Lode: outcrop in artisanal workings 1m @ 5.95 g/t 8

  9. Slide 9: Neta Prospect Cross Sections

    Neta Prospect Cross Sections 9

  10. Slide 10: Neta Prospect: Carlsen Lode Long Section

    Neta Prospect: Carlsen Lode Long Section 10

  11. Slide 11: Edjudina Gold Project – Lookahead

    Edjudina Gold Project – Lookahead Future work • Report results from metallurgical testing • Progress permitting and mining lease application • Follow-up Ace of Hearts target generated from Phase 8 drilling including 7m @ 2.53g/t from 9m. Open 900m north- Edjudina Gold south Project: some of the hist

  12. Slide 12: Highland Plains Phosphate Project - GIB 100%

    Highland Plains Phosphate Project - GIB 100% 12

  13. Slide 13: Highland Plains Resource

    Highland Plains Resource • JORC (2004) Inferred Resource: 56 million tonnes at 16% P2O5 with a 10% P2O5 cut • The Western Mine Target Zone (WMTZ) is shallower and has a higher grade JORC Inferred Resource of 14 million tonnes at 20% P2O5 with a 15% P2O5 cut (a sub-set of the total resource) • Low le

  14. Slide 14: Highland Plains Lookahead

    Highland Plains Lookahead • Find a strategic partner investment partner to progress the project through feasibility studies and into production. Work to include: • Drilling to upgrade the deposit to a JORC (2012) Resource & further exploration • Geotechnical studies • Metallurgical pilot plant testi

  15. Slide 15: Ellendale Diamond Project, Kimberley, WA

    Ellendale Diamond Project, Kimberley, WA GIB 100% with BDM Option to purchase 100% 15

  16. Slide 16: Ellendale Diamond Project Option

    Ellendale Diamond Project Option • In March 2021 GIB entered into a staged two year Option with Burgundy Diamond Mines (BDM) which gives BDM the right to purchase 100% of the Ellendale Diamond Project at BDM’s election • Total transaction is $6.7 million in cash, 16 million BDM shares, and a 1.5% gr

  17. Slide 17: Iroquois Zn-Pb Project, Earaheedy Basin, WA

    Iroquois Zn-Pb Project, Earaheedy Basin, WA STK 80%; GIB 20% Free-carry to BFS • The Iroquois Zn-Pb discovery is along strike from Rumble Resources Chinook Zinc-lead Project • Assays for STK hole IQRC001: 22m @ 2.2% Zn + Pb from 37m 23m @ 5.5% Zn + Pb from 108m • STK have announced their intention t

  18. Slide 18: Disclaimer

    This presentation is an overview of the Company prepared with good intention. It is not a prospectus and offers no securities for subscription or sale in any jurisdiction, nor a securities recommendation. All information necessary for investment decisions is not contained herein and investors are en

  19. Slide 19: For further information Contact: Jim Richards

    For further information Contact: Jim Richards Executive Chairman T +61 8 9422 9500 E info@gibbriverdiamonds.com 1/16 Ord Street, West Perth, WA 6005 gibbriverdiamonds.com ASX Code: GIB 19

Gibb River Diamonds — Shareholder Meeting (November 2022) on 6ix