  1. Slide 1: Aruma Resources: Focussed Exploration of WA's Eastern Goldfields

    For personal use only ARUMA RESOURCES Focussed Exploration of WA’s Eastern Goldfields Peter Schwann AMEC Convention 2011 Managing Director 29 June 2011 www.arumaresources.com.au ASX: AAJ

  2. Slide 2: Disclaimer / Competent Person's Statement

    Disclaimer /Competent Person’s Statement For personal use only The information in this presentation:  was prepared with due care and attention and is current at the date of the presentation;  is not an offer or recommendation to purchase or subscribe for securities in Aruma Resources Limited or to

  3. Slide 3: Board Snapshot

    Board Snapshot For personal use only  Mr Paul Boyatzis – Chairman Over 25 years experience in the investment and equity markets.  Mr Peter Schwann – Managing Director Geologist with 35 years experience in all facets of Gold exploration and exploitation.  Mr Danny Costick – Non Executive Director

  4. Slide 4: Capital Structure

    Capital Structure For personal use only Shares on Issue 65 M Market Capitalisation at 10c $6.5M Cash (31May 2011) $3.2M Shareholders 390 Top 10 76% Hemisphere Resources 61.3% www.arumaresources.com.au ASX: AAJ

  5. Slide 5: Project Locations

    Project Locations  Glandore Project For personal use only 40km east of Kalgoorlie-Boulder  Kurnalpi South Project 40 to 60 km east of Glandore  Gindalbie Project 60km north-east of Kalgoorlie-Boulder  Jundee South Project 20 km south of Jundee Mine  Laverton East Project 20km east of Laverton 

  6. Slide 6: Highly Prospective Landholding

    Highly Prospective Landholding For personal use only All Projects  100% Owned  Within a Major Gold Province  Showing strong Gold indicators  Close to Infrastructure Projects advanced post listing  Glandore landholding increased by 40%  Two phases of Glandore Drilling completed - 5920m  Total

  7. Slide 7: Glandore Gold Project

    Glandore Gold Project For personal use only  Leases 100% Aruma  Land Area >41km2  Leases underexplored  74 RC Holes Completed  5920m assayed (all)  8 holes >1.0 g/t Au  Intersections 11m @ 2.32g/t from surface  2m @ 4.77 g/t from 18m  55 of 74 Holes assayed >0.1g/t  Gravity and Fluid flow

  8. Slide 8: Previous Glandore Assays

    Previous Glandore Assays For personal use only Location Intersection From Axial Planar Fault 10m at 10.27 g/t Au 58m 4m at 18.8 g/t Au 103m Super Zone 8m at 10.4 g/t Au 18m (Previously Supergene ) 9m at 8.37 g/t Au 17m 9m at 3.43 g/t Au 15m 2m at 43 g/t Au 38m 5m at 4.99 g/t Au 36m Central Fault Zon

  9. Slide 9: Glandore Drilling Successful

    Glandore Drilling Successful For personal use only  55 of 74 holes intersect anomalous Au  8 holes intersect >1.0 g/t Au  Significant drilling hits 11m @ 2.32g/t from surface and 2m at 4.77g/t from 18m  Drilling identifies major corridor  Targets open along strike and at depth  Prospect re-eva

  10. Slide 10: Significant Intersections

    Significant Intersections For personal use only Hole Easting Northing From Intercept Au g/t AGR13 391404 6594996 37 1 1.04 AGR14 391483 6594998 22 1 1.08 AGR23 391647 6594358 77 1 1.07 AGR28 391664 6594194 0 11 2.32 AGR28 391664 6594194 13 2 1.01 AGR28 391664 6594194 20 1 1.27 AGR28 391664 6594194 3

  11. Slide 11: Glandore Project Underexplored

    Glandore Project Underexplored For personal use only  Undrilled area shaded pale pink  Areas drilled by Aruma were gold soil anomalies  Drilling confirms mineralised structure  Anomalous Gold zones open all directions ARUMA  Hemisphere drilling success DRILLING in yellow  Leaseholding extends

  12. Slide 12: Glandore Ready for Next Phase

    Glandore Ready for Next Phase For personal use only  Northern Lease Area in Red  Gravity Survey over shallow Lake cover in Yellow  Majestic Structure Extension in Blue  Compton Shears in Green  Intersections possible targets  Drilling identifies major corridor along N-S Structure  CSIRO Fluid

  13. Slide 13: Glandore Structures in Magnetics

    Glandore Structures in Magnetics For personal use only  “Majestic Structure” in Red  NW Structures in Yellow  Fluid Flow Study Underway www.arumaresources.com.au ASX: AAJ

  14. Slide 14: Regional Projects

    Regional Projects Kurnalpi South For personal use only  PoWs submitted/approved  Gindalbie Granting imminent on 70 km2  Laverton East PoW Approved, Drilling May Lease applied for to the North  Jundee South  PoW submitted  Darlot East 20 km2 east of Darlot Mine  Patricia 74 km2 on Celia Lineam

  15. Slide 15: Additional Lease Areas Acquired

    Additional Lease Areas Acquired For personal use only New leases in a 60 km radius of Glandore www.arumaresources.com.au ASX: AAJ

  16. Slide 16: Gindalbie Project

    Gindalbie Project For personal use only 70km2 Prospect  45km north of Glandore  Mostly soil covered  Prospects on Structures on sediment-greenstone contact  Adjacent major Lineament  Lithological Terminations evident  Hyvista survey completed www.arumaresources.com.au ASX: AAJ

  17. Slide 17: Kurnalpi South Project

    Kurnalpi South Project For personal use only Christmas Well, Pineapple Dam, Pinnacles South, Mt Quin and Steeple Hill  100km east of Kalgoorlie - Boulder  Prospects on the Structures around granites  PoWs Approved  Heritage clearances in June  Large Projects north (Carosue) and south (Aldiss) i

  18. Slide 18: Laverton East Project

    Laverton East Project For personal use only  Leases under shallow cover  Rock chips samples define mineralisation trend  Hyvista maps goethite over Gold anomaly  Next figure in black square  New lease applied for along strike  PoW Approved  Drilling underway www.arumaresources.com.au ASX: AAJ

  19. Slide 19: Laverton East Project – Hyvista Target

    Laverton East Project – Hyvista Target For personal use only  Red anomaly is Goethite-Mica  Anomaly is 1km by 150m  Hyvista maps goethite over Gold anomaly  PoW amended for Aircore  Drilling program is 3000m of RC over Hyvista and Geochem area  1000m of RC over remainder of lease  Site Cleara

  20. Slide 20: Jundee South Project

    Jundee South Project For personal use only  Lease flown for Hyvista mapping  Lies between Jundee (3 M oz) and Gourdis (1 M oz) mines in covered country  Gourdis - Vause Gold structure is extended to the west Alluvial Workings  Structural Disruption sites Identified  Gold Mineralisation evident

  21. Slide 21: Aruma's progress to date

    Aruma’s progress to date For personal use only  New leases negotiated and applied for at Glandore (15 km2)  74 RC holes Completed at Glandore - 55 anomalous  Eight holes >1g/t Au intersections  New ELs at Laverton East, Darlot, Patricia, Kurnalpi South and Gindalbie  All Granted Projects now ma

  22. Slide 22: Aruma's Work Timeline

    Aruma’s Work Timeline 2010 For personal use only July 23 – AAJ listed on ASX – Glandore PoW approved August – Joining Leases negotiated at Glandore September – Northern Leases negotiated at Glandore – Hyvista Remote Sensing completed October – First Phase drilling completed at Glandore November – Dr

  23. Slide 23: Aruma's Next Steps

    Aruma’s Next Steps For personal use only  GLANDORE • Follow up drilling in the extended north Supergene-Axial lease area • Follow up drilling in the Central Fault Zone • Gravity Survey for Fluid Flow Study to target the Majestic Structure • Initial drilling on the extension of the Majestic Structur

  24. Slide 24: Company Summary

    Company Summary For personal use only  Large prospective landholding in the proven Eastern Goldfields  Strategically located adjacent to established gold producers  Treasury at 31 May $3.2M– current program fully funded  Rapid progress:  Drilling at Glandore hits thick Gold mineralisation from

  25. Slide 25: Thank you

    For personal use only ARUMA RESOURCES Thank you. www.arumaresources.com.au ASX: AAJ