Ebusco Holding N.v. · EURONEXT:EBUS

Ebusco — Busworld 2025

14 slides from Ebusco's conference presentation, Oct 4, 2025

  1. Slide 1: Ebusco – Made to Move People

    ‘VF +i OL ESuU Oo MADE TO MOVE PEOPLE www.ebusco.com

  2. Slide 2: We Welcome You At

    WE WELCOME YOU AT

  3. Slide 3: Strategic Shift: From OEM to OED

    STRATEGIC SHIFT From OEM to OED Working with contract manufacturers and two owned locations: Deurne – Netherlands Cléon - France Legend Countries active Other countries Ebusco facility Contract manufacturer

  4. Slide 4: Results of This Shift

    RESULTS OF THIS SHIFT From OEM to OED Improvement of bus deliveries 24 buses in 1,5 month – and continuing trend Recover and reset organization Transformed to be ready for the future Focus on what we do best Engineering and development excellence

  5. Slide 5: Proven Gamechangers

    PROVEN GAMECHANGERS WITH MORE THAN 900 ON THE ROAD 5

  6. Slide 6: Ebusco 2.2

    EBUSCO 2.2 Proven concept Proven legacy with over Throughout the years 750 buses on the road Optimization With a single charge Long lasting UP TO 600 KM Performance

  7. Slide 7: Ebusco 3.0

    EBUSCO 3.0 Build with focus on engineering With a single charge Fully flat floor UP TO 700 KM BATTERIES IN THE FLOOR Considerable reduction of The industries lowest ENERGY CONSUMPTION TOTAL COST OF OWNERSHIP

  8. Slide 8: Groundbreaking

    GROUNDBREAKING NERGY CONSUMPTION

  9. Slide 9: LCA: Ebusco 3.0

    LCA: EBUSCO 3.0 Life cycle assessment COLLABORATED WITH TNO 0.006 EoL burden A third-party research institute Use phase 0.005 TOTAL: 0.0050 Assembly RESULTS TOTAL: 0.0046 Processing 0.004 CO2 emissions per kilometer Material EoL credit INCLUDED OUTCOME: EPD Kg CO2 eq/p.km 0.003 Full LCA – Ebusco 3.0

  10. Slide 10: Benefits for Operators

    BENEFITS FOR OPERATORS Where you will make the profits Reduced operational costs By reducing energy consumption Fewer charging Simplified operational planning Reduce strain on energy grid Prevent overloading Charging flexibility Based costs and availability

  11. Slide 11: Latest Developments

    LATEST DEVELOPMENTS Continuing to improve Integration of ADAS system Improving safety and driver performance R155 Cybersecurity & R156 Software update certification Future ready R66 Roll over certification for Ebusco 2.2 18-meter Preparation for class I and II certification

  12. Slide 12: Energy Storage, Fast Charging, Remote Mobility

    ENERGY STORAGE Battery capacity 184 kWh FAST CHARGING High power charging 60 kW REMOTE MOBILITY Movement speed up to 4 km/h PERFORMANCE INSIGHTS Smart monitoring system

  13. Slide 13: Q&A Please Raise Hands

    Q&A PLEASE RAISE HANDS b ‘e | ©

  14. Slide 14: Thank You

    THANK YOU Enjoy a drink and some snacks!

Ebusco Holding — Busworld 2025 on 6ix