Slide 1: Ovoot Coking Coal Project Update
Aspire Mining Limited Ovoot Coking Coal Project Update 1 June 2012

Slide 2: Important notices
Important notices Nature of this document: This document has been prepared by Aspire Mining Limited (“Aspire”, “AKM”, or the “Company”) and contains summary information about the Company and its subsidiaries as at 1 June 2012. The information in this document does not summarise all information that

Slide 3: Company Snapshot – Corporate Structure
Company Snapshot – Corporate Structure Capital Structure (ASX:AKM) Multiples Undiluted Diluted Share Price (22 May 12) $ 0.13 0.13 Shares Outstanding m 620.5 929.12 Market Capitalisation $m 80.6 120.8 Options on Issue m 247.1 0.5 Net Cash $m 28.61 49.52 Enterprise Value $m 52.0 71.3 0.4 1 As of 31 M

Slide 4: Projects
Projects Project Locations Project Interests Ovoot Coking Coal Project (100%) Jilchigbulag Coal Project (100%) Nuramt Coal Project (100%) Zavkhan Iron Ore Project (Earning 70%) 4

Slide 5: Ovoot Coking Coal Project Overview
Ovoot Coking Coal Project Overview Acquired Project 100% in Feb 2010 : 500 sq Km Maiden JORC Resource established in 2010 - Based on 44 Holes, 8,364m of drilling Indicative Quality Specifications indicate a high quality coking coal product Progressed access to Rail Infrastructure for Ovoot t

Slide 6: Met Coal Pricing Going Up
Met Coal Pricing Going Up Met Coal in Opposite Direction to Iron Ore Source: Platts 6

Slide 7: Ovoot PFS at a Glance
Ovoot PFS at a Glance Large single open pit operation Reserves Probable (Mt) Total (Mt) Marketable (Mt) JORC Reserves of 178Mt Ovoot Open 178 1781 1472 High Yield of 82% Pit 15yr Life of Mine producing 153Mt in total Resource Above 300 m Below 300 m Total (Mt) and up to 12 Mtpa of saleable c

Slide 8: Key Met Producers 2011
Key Met Producers 2011 Top 10 Export Metallurgical Coal Producers MT % Share BHP Billiton Ltd 28 11.0% Mitsubishi Corporation 21 8.0% Teck Resources Ltd 20 8.0% Anglo American plc 15 6.0% Xstrata plc 14 5.0% Rio Tinto Group 12 5.0% Walter Energy Inc 11 4.0% Aspire Peabody Energy Corp 8 3.0% Mechel O

Slide 9: Ovoot - Third Largest Coking Coal Project in Mongolia
Ovoot - Third Largest Coking Coal Project in Mongolia Mt 9

Slide 10: Exceptional Deposit – Highest Washing Yields and % Coking
Exceptional Deposit – Highest Washing Yields and % Coking = Highest In-Situ Value 10

Slide 11: Ovoot Indicative Product Quality & Fluidity Properties
Ovoot Indicative Product Quality & Fluidity Properties Yield % Ash % Volatiles CSN Sulphur % % Indicative Washed Coal 82% 9.5% 25 - 28% 8-9 1% Quality • Air dried basis • Above table based on R.D. 1.4 cut for all 7 sample batches from the 2010 Exploration Programme • ISO Coal Classification: Medium

Slide 12: Ideal Rank for Blending
Ideal Rank for Blending Ovoot Coal Rank (Ro Max %) 1.2 • Target average for many blends • Highest available vitrinite coal on market. Vitrinite: A maceral group that is rich in oxygen and composed of humic material associated with peat formation and has a shiny appearance resembling glass. 12

Slide 13: Ovoot – Room to Grow to Tier 1 Resource
Ovoot – Room to Grow to Tier 1 Resource Project Tenement and Geology +500sqkm project area. 25,000m drilling programme for 2011/2012. Comprehensive airborne magnetics programme clearly defines extensive basin. 5 exploration target areas. 13

Slide 14: Infill Drill Holes & Ovoot Open Pit Outline
Infill Drill Holes & Ovoot Open Pit Outline 14

Slide 15: Large New Coking Coal Deposits Need to be Developed
Large New Coking Coal Deposits Need to be Developed Source: BHP Billiton, Developments in the coking coal market Presentation 17 April 2012 15

Slide 16: Mongolian Coking Coal now the Dominant Source
Mongolian Coking Coal now the Dominant Source 9,000 Chinese Coking Coal Imports 8,000 7,000 Quantity 000' Tonnes 6,000 5,000 4,000 3,000 2,000 1,000 0 Mar Qtr June Qtr Sept Qtr Dec Qtr Mar Qtr June Qtr Sept Qtr Dec Qtr Mar Qtr Jun Qtr Sept Qtr Dec Qtr 2009 2009 2009 2009 2010 2010 2010 2010 2011 201

Slide 17: High Quality Met Coal Required to Sustain Future Demand
High Quality Met Coal Required to Sustain Future Demand Increasing demand = Mongolia is well positioned stronger prices to trigger geographically to supply new mine development these markets Source: Peabody, Presentation Bank of America, Merrill Lynch Global Metals & Mining Conference Presentation d

Slide 18: Rail Infrastructure – Key to Unlocking Northern Mongolia
Rail Infrastructure – Key to Unlocking Northern Mongolia Commentary Potential Rail Route Ovoot Coking Coal Project is 550kms from Trans-Mongolian rail terminus Opens up major transport corridor in Northern Mongolia Rail construction from Erdenet to Moron critical path for development Multipl

Slide 19: Northern Railways Multi-User Rail Line
Northern Railways Multi-User Rail Line Coking Coal Other Bulk Commodities } + 20 Mtpa 2 Mtpa { Passenger and Freight } 2 Mtpa 19

Slide 20: Northern Railways LLC
Northern Railways LLC • Focused on Erdenet to Moron rail line • Stand alone Special Purpose Vehicle to: - Apply for BOOT (Build Own Operate Transfer) rail concession - Manage EPC contractors - Raise required funds through issuing debt and equity securities • 51% ownership to be vested in the Mongoli

Slide 21: Potential Routes to Coal Markets – Rail Access
Potential Routes to Coal Markets – Rail Access Asian Importers of Metallurgical Coal: Japan 68.6Mt1 Korea 25.9Mt1 Taiwan 5.7Mt1 100.4Mt Russian total Metallurgical Coal Exports to Asian markets (incl. China): 1. Source: TEX Report, 2011 data. 3.8Mt1 21

Slide 22: Mongolian Foreign Investment Law
Mongolian Foreign Investment Law New Foreign Investment Law – May 2012 • Requires Parliamentary approval for SOE Investment • Requires Government of Mongolia approval above 33% and; • Requires Mongolian Parliamentary approval if more than 49% • The Foreign Investment Law: • Does not cap foreign inve

Slide 23: Next Steps 2012
Next Steps 2012 Next Steps Further Exploration drilling (only 20% of the Ovoot Basin has been explored to date) Additional studies/drilling to add to Coal Reserves Mining Licence Complete Environmental Impact Assessment on Rail Alignment between Erdenet and Moron Rail Concession Progress

Slide 24: Summary
Summary Ovoot … Is independent and 100% owned coking coal deposit located in Northern Mongolia. The third largest coking coal reserve in Mongolia with maiden 178 MT Probable Coal Reserve and strong potential for further growth. Large scale open pit delivering up to 15 Mtpa ROM, and 12 Mtpa of

Slide 25: Competent Person Statement
Competent Person Statement Competent Persons Statement In accordance with the Australian Securities Exchange requirements, the technical information contained in this announcement in relation to the JORC Compliant Coal Reserves and JORC Compliant Coal Resource for the Ovoot Coking Coal Project in Mo

Slide 26: Contact details
Contact details Aspire Mining Limited ABN: 46 122 417 243 ASX Code: AKM Web: www.aspiremininglimited.com AUSTRALIA Level 2, Suite 20, 22 Railway Road Subiaco, Western Australia, 6008 MONGOLIA Sukhbaatar District, 1st Khoroo, Chinggis Ave-8 Social Insurance Department Building Altai Tower, 3rd Floor,
Source: Internet Archive copy of aspiremininglimited.com
More decks from Aspire Mining Limited
Ignite Investment Summit 202622 slides · Oct 16, 2026
Shareholder Meeting (May 2025)12 slides · May 29, 2025
Investor Presentation (March 2025)27 slides · March 2025
Investor Presentation (October 2024)17 slides · October 2024
Shareholder Meeting (May 2024)17 slides · May 2024
Investor Presentation (November 2023)17 slides · November 2023