Aspire Mining Limited · ASX:AKM

Aspire Mining — Ignite Investment Summit 2026

22 slides from Aspire Mining's conference presentation, Oct 16, 2026

  1. Slide 1: Developing a World-Class Coking Coal Deposit

    rsonal use only Developing a World-Class Coking Coal Deposit Creating shared benefits for all stakeholders Ignite Investment Summit | Hong Kong | October 2026 aspirelimited.com ASX: AKM

  2. Slide 2: Disclaimer

    Disclaimer NATURE OF THIS DOCUMENT This presentation has been prepared by Aspire Mining Limited (Aspire or the Company). The information is based on publicly available information, internally developed data and other sources. By receiving this presentation, you acknowledge and represent to the Compa

  3. Slide 3: Near-Term Supply of World-Class Fat Coking Coal

    Near-Term Supply of World-Class Fat Coking Coal With construction underway and first coal planned for Q4 2027, Aspire will be China’s next supplier of fat coking coal rsonal use only World-Class Fat Construction Low-Capex Unique Coal That Community Coking Coal for Underway, Real Development Plan Mee

  4. Slide 4: A World-Class Fat Coking Coal Asset in Development

    A World-Class Fat Coking Coal Asset in Development Large resource supports a ~31-year operating life and phased growth to 5.0 Mtpa Overview Location Key rsonal use only Ovoot Coking Coal Project Proposed road (Ovoot–Murun) Holding 100% Existing road (Murun–Erdenet) Haul-route aimags Railway JORC Coa

  5. Slide 5: Site Development Is Progressing

    Site Development Is Progressing CHPP Camp Infrastructure • Detailed design progressed to • Land-use permits received for rsonal use only 85% Design Review after the mining area, workers' camp, quarter end wastewater treatment plant and • Geotechnical investigations electrical substation completed un

  6. Slide 6: A Low Capital Cost Funding Plan That Limits Dilution

    A Low Capital Cost Funding Plan That Limits Dilution Vendor finance and a registered OTC bond program to fund Ovoot; off-balance-sheet funding to fund the Murun-Uliastai Highway (as part of a PPP with the Mongolian Government) rsonal use only Ovoot Mine, CHPP, Equipment, Supporting Infrastructure EP

  7. Slide 7: Meeting the Fat Coking Coal Shortfall in Northern China

    Meeting the Fat Coking Coal Shortfall in Northern China Fenwei forecast an 18.1 Mt washed fat coal supply gap by 2029 across five key Target Market Regions rsonal use only aspirelimited.com 7

  8. Slide 8: Fat Coal Scarcity Supports Strong Prices

    Fat Coal Scarcity Supports Strong Prices Ovoot’s fat coal is highly sought after for its excellent blending properties with other coals; likely to secure a similar price to Australian HCC rsonal use only Historical Comparative Coal Prices (USD/t inc. VAT)1 Supply Shortfalls Drive Strong Demand2 700

  9. Slide 9: From Early Works to First Coal: Pathway to First Production

    From Early Works to First Coal: Pathway to First Production EPC executed, site established and funding underway, with first coal targeted Q4 2027 rsonal use only Progress to Date and Near-Term Catalysts Construction and Site Established PPP Advanced PPP Award Ramp-Up Land-use permits obtained; CHPP

  10. Slide 10: Social Licence Built on Local Benefit

    Social Licence Built on Local Benefit Environmentally sensitive development delivering shared prosperity for communities in Khuvsgul rsonal use only Public-use infrastructure The Murun–Uliastai Highway PPP¹ will deliver lasting regional benefits beyond the mine, supporting local residents with impro

  11. Slide 11: Corporate

    rsonal use only Corporate ASX: AKM

  12. Slide 12: Board and Management

    Board and Management Leadership with Deep Mongolian Coal and Capital Markets Experience ACHIT-ERDENE DARAMBAZAR Executive Chairman SAM BOWLES Chief Executive Officer rsonal use only • Chairman of Mongolia International Capital Corporation (MICC), • 25+ years’ coal mining experience, including 15+ ye

  13. Slide 13: Corporate Overview

    Corporate Overview Capital Structure Share Price Performance Share Price (A$) (RHS) Volume (m) (LHS) rsonal use only Unit ASX:AKM 1.2m 0.35 Share Price1 A$/sh. 0.235 1.0m 0.30 Shares on Issue #m 507.6 0.8m Performance Rights #m 6.5 0.6m 0.25 Market Capitalisation A$m 119.3 0.4m 0.20 Cash & Investmen

  14. Slide 14: Why Aspire, Why Now

    Why Aspire, Why Now Low-capital pathway, construction underway and near-term catalysts • Site establishment and early construction progressing, with further infrastructure development subject to rsonal use only Development Underway outstanding contractual arrangements, approvals and funding; contrac

  15. Slide 15: For more information please contact us

    rsonal use only For more information please contact us Dannika Warburton Investor Relations ir@aspirelimited.com ASX: AKM aspirelimited.com

  16. Slide 16: Appendix: Mining, Processing and Logistics Plan

    rsonal use only Appendix: Mining, Processing and Logistics Plan ASX: AKM

  17. Slide 17: Mining: Simple Open Pit with a Low Strip Ratio

    Mining: Simple Open Pit with a Low Strip Ratio Truck-and-excavator operation at 6.5 bcm/ROMt, with initial fleet rented to defer capital expenditure rsonal use only Mode Mode Raw Coking Coal Mined Best Practice Sustainable Mining • Low stripping ratio: thick, relatively shallow coal Raw Coking Coal

  18. Slide 18: Processing: Enclosed Plant Built for Yield and Low Impact

    Processing: Enclosed Plant Built for Yield and Low Impact 350 tph CHPP with no tailings dam required, designed ready for modular expansion rsonal use only Ovoot Coal Handling and Preparation Plant (CHPP) Modern, High-Efficiency Coal Processing • 350 tonne per hour modular plant: designed to maximise

  19. Slide 19: Transportation: 24-Hour Trucking Circuit

    Transportation: 24-Hour Trucking Circuit OCM to ERT | Two-driver relay keeps trucks moving around the clock rsonal use only View animation online here: Watch here aspirelimited.com 19

  20. Slide 20: Logistics: Road to Rail at Erdenet

    Logistics: Road to Rail at Erdenet Enclosed transloading onto the Erdenet–Salkhit line, linking Ovoot to the Chinese border rsonal use only Erdenet Rail Terminal (ERT) Transloading onto existing rail to reach markets • Efficient transloading: from road truck to rail wagon the process is fully mechan

  21. Slide 21: Appendix – JORC (2012) Coal Resource and Reserve

    Appendix – JORC (2012) Coal Resource and Reserve¹ rsonal use only RESOURCE RESERVE Tonnage Ash CSN Category Tonnage / (Mt) Category (Mt) (%) (#) Proved 76.8 Measured 99.5 18.4 8 Probable 53.3 Indicated 100.9 21.3 7 Total ROM Coal Reserve 130.1 Inferred 19.0 19.2 6 Marketable Coal Reserve 97.9 Total

  22. Slide 22: Ovoot Project Economics

    Ovoot Project Economics¹ Financial Summary Forecast Capital Expenditure rsonal use only Unit Value Unit Value NPV10 (post-tax) US$m 1,483.3 Phase 1 – Pre-production US$m 61.2 Real IRR (post-tax) % ~60 Phase 1 – Post-production US$m 88.0 Pre-Production Infrastructure Capital US$m 61.2 Phase 2 – Expan