Talisman Mining Limited · ASX:TLM

Talisman Mining — RIU Explorers' Conference February 2015

22 slides from Talisman Mining's conference presentation, Feb 25, 2015

  1. Slide 1: RIU Explorers' Conference: Growth and Opportunity in Nickel and Copper

    For personal use only RIU Explorers’ Conference February 2015 Growth and Opportunity in Nickel and Copper Dan Madden, Chief Financial Officer

  2. Slide 2: Disclaimer and Competent Person's Statements

    Disclaimer and Competent Person’s Statements Disclaimer For personal use only This presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necessary for

  3. Slide 3: Overview – Platform for Growth

    Overview – Platform for Growth • Exceptional record of capital management For personal use only • Last capital raising was in February 2010 – 5 years ago • Four significant enabling transactions completed in past four years: • Successful divestment of Wonmunna iron ore project for $34M cash in 2011,

  4. Slide 4: Corporate Summary

    Corporate Summary Capital Structure For personal use only Shares on Issue 131.5M Unlisted Options 6.25M Market Cap (at 15c) ~$19M Cash (post Sinclair completion) ~$6M Other Assets Ochre Group Holdings Limited 5.9% Wonmunna Iron Ore Project Royalty 1.0% Board Alan Senior (Chairman) – ex Jubilee Mines

  5. Slide 5: Sinclair Nickel Project

    For personal use only Sinclair Nickel Project A counter-cyclical opportunity in nickel 5

  6. Slide 6: Sinclair Nickel Project – A Transformational Acquisition

    Sinclair Nickel Project – A Transformational Acquisition For personal use only • Sinclair Nickel Project: • An advanced WA nickel sulphide project • Secured via Sale & Purchase Agreement with Glencore in October 2014 • $8M cash consideration, funded from Talisman cash reserves, plus $2M contingent p

  7. Slide 7: Sinclair Nickel Project – Overview

    Sinclair Nickel Project – Overview Highly prospective tenement package extending For personal use only • over 300km² • Sinclair acquisition includes: • Sinclair Nickel Mine (on care & maintenance) • Extensive near-new infrastructure (including 300ktpa Concentrator) • Existing deposit with drill-defi

  8. Slide 8: Sinclair Nickel Project – Background

    Sinclair Nickel Project – Background Project History For personal use only • Discovered by Jubilee Mines NL in October 2005 • Developed in 2008 / 2009 by Xstrata • Historical Sinclair mine production: • 1.58 Mt @ 2.44% Ni for 38,500t of contained Ni • Placed on care and maintenance by Glencore in Au

  9. Slide 9: Sinclair Nickel Project – Deposit and Mine Development

    Sinclair Nickel Project – Deposit and Mine Development For personal use only ~445m • Sinclair deposit comprises an elongated body of massive to disseminated sulphide mineralisation with a shallow plunge of around 20 degrees which was mined to ~445m below surface 9

  10. Slide 10: Sinclair Nickel Deposit Extension

    Sinclair Nickel Deposit Extension For personal use only 200m 200m • Wide-spaced drilling of the Sinclair Deposit for 1km beyond current mine development has returned significant intersections* Refer Talisman ASX Release 20th October 2014 • Modelling and evaluation work of Sinclair Deposit extension

  11. Slide 11: Near-Mine Exploration Opportunity – Skye & Stirling

    Near-Mine Exploration Opportunity – Skye & Stirling For personal use only • Skye and Stirling – two parallel, mineralised ultra-mafic channels (similar to Sinclair) with greater ultra-mafic volumes • Numerous significant mineralised intercepts from relatively broad spaced historical drilling • Late-

  12. Slide 12: Skye & Stirling – Exploration Targeting Underway

    Skye & Stirling – Exploration Targeting Underway For personal use only • Talisman, in association with SRK, have built 3D geological models of Skye and Stirling • Newexco have re-processed and reviewed historical EM data • Integration of these datasets is underway to identify optimal exploration tar

  13. Slide 13: Sinclair Trend – A Pipeline of Exploration Opportunities

    Sinclair Trend – A Pipeline of Exploration Opportunities For personal use only 8Km 8Km • Sinclair Trend offers along strike discovery opportunity for at least 8km • Limited historical drilling outside of immediate near-mine area • Priority Sinclair Trend exploration prospects are: • Delphi (North &

  14. Slide 14: Summary – Fast-Track Development Potential

    Summary – Fast-Track Development Potential • Sinclair has extensive infrastructure: For personal use only • Open pit, decline and underground mine • 300ktpa concentrate plant • 200-person accommodation village • Administration buildings and stores • Exploration office and core yard • Mining contract

  15. Slide 15: Sinclair – The Next Steps

    Sinclair – The Next Steps • Finalise matters relating to transfer of Project For personal use only ownership: • Stamp duty assessment • Tenement transfers • Key steps to enable commencement of initial drilling program: • Complete data compilation and assessment (underway) • Define initial drill targ

  16. Slide 16: Doolgunna Copper-Gold Projects

    For personal use only Doolgunna Copper-Gold Projects Exposure to Potential New Copper-Gold Discoveries in a World-Class VMS Province 16

  17. Slide 17: Talisman Doolgunna Project Locations

    Talisman Doolgunna Project Locations For personal use only 17

  18. Slide 18: Doolgunna Projects Overview

    Doolgunna Projects Overview • Projects located in an emerging copper province hosting For personal use only the world-class, high-grade DeGrussa Copper-Gold Mine • $15 million farm-in joint venture agreed with Sandfire in late December 2013 • Sandfire to spend a minimum of $5m in first 2 years • Fir

  19. Slide 19: Doolgunna JV – Exploration Drilling

    Doolgunna JV – Exploration Drilling For personal use only • Sandfire continue to conduct extensive geochemical aircore drilling programmes across the prospective sequence at Springfield • Drilling at Springfield in 2014 by Sandfire: • 285 aircore holes for 20,099 metres; and • 1 diamond hole (1,099

  20. Slide 20: Doolgunna JV – Exploration Geophysics

    Doolgunna JV – Exploration Geophysics • In 2014, Sandfire: For personal use only • Undertook 24 1km x 1km high-powered FLEM surveys over part of the prospective sequence; and • Re-surveyed 20 historical Talisman drill holes • Extensive geophysical programmes continue in 2015: • 25 1km x 1km high pow

  21. Slide 21: Talisman – A Clear Strategy to Grow Shareholder Value

    Talisman – A Clear Strategy to Grow Shareholder Value • Considered growth strategy has now delivered real opportunity for For personal use only value creation on two fronts: 1. Nickel Sulphides • Sinclair Nickel Project acquisition provides transformational opportunity • Significant “walk-up” explor

  22. Slide 22: RIU Explorers' Conference: Growth and Opportunity in Nickel and Copper

    For personal use only RIU Explorers’ Conference February 2015 Growth and Opportunity in Nickel and Copper Dan Madden, Chief Financial Officer

Talisman Mining — RIU Explorers' Conference February 2015 on 6ix