Talisman Mining Limited · ASX:TLM

Talisman Mining — RRS Summer Series December 2025

15 slides from Talisman Mining's conference presentation, Dec 2, 2025

  1. Slide 1: A well-funded explorer with a diversified portfolio in NSW and South Australia

    For personal use only A well-funded explorer with a diversified portfolio in NSW and South Australia Breakthrough mineral discoveries on Australia’s Eastern Seaboard Investor Presentation- RRS December 2025 talismanmining.com.au ASX: TLM

  2. Slide 2: The Talisman Investment Proposition

    The Talisman Investment Proposition Well-funded, strong exploration DNA, highly leveraged to exploration success For personal use only NSW - Lachlan and Macquarie Arc • Three projects covering ~6,600km2 • World-class metal province Wonmunna • New phase of drilling underway • Significant zones of hig

  3. Slide 3: Corporate Overview

    ASX: TLM Corporate Overview Capital Structure Shareholder Ownership For personal use only Board & Management 188.3M 11.6M HNW Investors Harmanis Holdings Shares on issue Unlisted options (Exercise Prices: 20.1c – 26.4c) Retail Experience Board & Management Kerry Harmanis Andrew Munckton A$18.8M A$4.

  4. Slide 4: Wonmunna

    Wonmunna MinRes recently released for Pilbara Hub Ore Reserve – 51Mt at 57.5% Fe – 5 years at 10Mtpa Mineral Resource - 161Mt at 57.0% Fe Wonmunna plays a roles as blending material to lower P% and For personal use only Al2O3% to meet customer specifications Talisman royalty payments • To date - A$3

  5. Slide 5: Lachlan Base Metals and Copper-Gold Project

    Lachlan Base Metals and Copper-Gold Project Extensive, high-quality portfolio in a world-class mineral districts For personal use only • Lachlan North Project • 8 EL’s, 2215km2 (33% of the Lachlan Project) • Cobar Basin Epithermal-style lead-zinc-silver-copper-gold • $4.1M by TLM over 6 years • Pros

  6. Slide 6: Lachlan Project NSW - Durnings Prospect

    Lachlan Project NSW Durnings Prospect Deeper Drill Test • Initial 24 RC / DD holes drilled in 2 phases For personal use only • Two new zones Discovered • Southern Durnings DRRCD0006 and DRRCD0019 Results3 • High grade, Base Metals dominant mineralization • 6m at 10.3% Pb, 3.5% Zn, 126g/t Ag, 0.4% Cu

  7. Slide 7: Durnings Prospect Interpreted Cross Sections

    Lachlan Project NSW Durnings North Interpreted Cross Section Durnings South Interpreted Cross Section Durnings Prospect For personal use only Note 3. ASX:TLM - 27 March & 29 April 2024. Note 4. ASX:TLM - 7 June 2024 DRRCD0019 - Massive Pb-Zn Sulphides 1.7m at 26.5% Pb, 7.8% Zn, 558g/t Ag, 0.7% Cu an

  8. Slide 8: Walkers Hill Prospect Initial Drill Test

    Lachlan Project NSW Walkers Hill Prospect Initial Drill Test • Sheepyard4 For personal use only • Initial 5 RC Holes • Large Coherent gold and arsenic-in-soil anomaly 1km x 1km associated with significant geological contact • Shallow RC results • 40m at 0.46g/t Au from 3m - PMV005 • 42m at 0.44g/t A

  9. Slide 9: Walkers Hill Prospect Initial Drill Test

    Lachlan Project NSW Walkers Hill Prospect Initial Drill Test • Sheepyard4 For personal use only • Initial 5 RC Holes • Large Coherent gold and arsenic-in-soil anomaly 1km x 1km associated with significant geological contact • Shallow RC results • 40m at 0.46g/t Au from 3m - PMV005 • 42m at 0.44g/t A

  10. Slide 10: Macquarie Arc Project NSW

    Macquarie Arc Project NSW Exposure to Tier-1 Cu-Au deposit discovery potential For personal use only Two Project Areas • Junee Narromine Belt • Grassroots to advanced Exploration • 4 significant blocks of ground – 766km2 • Tenure spans Ordovician age Volcanics containing complex deep-seated intrusio

  11. Slide 11: Macquarie Arc Project - Yarindury Cu-Au Project

    Macquarie Arc Project NSW Exposure to Tier-1 Cu-Au deposit discovery potential For personal use only Yarindury Cu-Au Project7 • Exploration Licence (EL9679) • Tenure spans Ordovician age Volcanics containing complex deep-seated intrusions • Previously explored by Newcrest 2017 and Golden Cross 2010

  12. Slide 12: Macquarie Arc Project - Yarindury Cu-Au Project

    Macquarie Arc Project NSW Exposure to Tier-1 Cu-Au deposit discovery potential Yarindury Cu-Au Project7 For personal use only • Exploration Licence (EL9679) • 100km north of Cadia (Newmont) • 20km N of Boda-Kaiser (Alkane) • Both Cadia and Boda Kaiser show substantial chargeability anomalies associa

  13. Slide 13: Key investment takeaways

    Key investment takeaways Highly leveraged to discovery success For personal use only All the right ingredients  Highly prospective tenure across multiple projects in a Tier-1 jurisdiction  Multiple commodity exposure  Focused and experienced team  Systematic and methodical exploration approach 

  14. Slide 14: Contact Mr Andrew Munckton

    For personal use only Contact Mr Andrew Munckton Managing Director +61 8 9380 4230 info@talismanmining.com.au talismanmining.com.au

  15. Slide 15: Appendix 1: Competent Persons' Statements

    Appendix 1: Competent Persons’ Statements Exploration Results and Exploration Targets Information in this presentation that relates to Exploration Results an Exploration Targets is based on and fairly For personal use only represents information and supporting documentation complied by Mr Andrew Mun

Talisman Mining — RRS Summer Series December 2025 on 6ix