Barrick Mining Corporation · TSX:ABX

Barrick Mining — Barrick Gold — Natural Resource Summit of the Americas 2007

15 slides from Barrick Mining's conference presentation, Apr 2, 2007

  1. Slide 1: Cautionary Statement on Forward-Looking Information

    Natural Resource Summit of the Americas April 2-3, 2007 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this Investor Day presentation and related material, including any information as to our future financial or operating performance

  2. Slide 2: Barrick Now

    Natural Resource Summit of the Americas April 2-3, 2007 Barrick Now ƒ High quality portfolio of operating mines ƒ Largest reserve and resource base ƒ Suite of gold and non-gold projects to advance ƒ Industry’s strongest balance sheet ƒ Exploration ground on the most prolific trends ƒ Top quality emp

  3. Slide 3: Barrick Now: Opportunities and Creating Leverage

    Natural Resource Summit of the Americas April 2-3, 2007 Barrick Now Barrick’s Opportunities ƒ Maximize leverage to rising gold prices ƒ Stabilize cost structure to expand gold margins ƒ Expansion in multiples from current historic lows ƒ Surface latent project value ƒ Capitalize on high base metal p

  4. Slide 4: Barrick Metals Portfolio

    Natural Resource Summit of the Americas April 2-3, 2007 Barrick Metals Portfolio P&P Reserves and M&I Resources (at December 31, 2006) (1) Gold Copper Contained Silver (2) millions of ounces billions of pounds millions of ounces 123 6.6 964 6 35 48 P&P M&I P&P M&I Gold Gold Reserves Resources Other

  5. Slide 5: Regional Distribution

    Natural Resource Summit of the Americas April 2-3, 2007 Barrick Now Russia Canada United States Pakistan Dominican Republic Papua New Guinea Peru Tanzania Australia Chile Argentina South Africa Regional Distribution 2006 P&P Reserves (1) 2007E Production North America North America 37% 38% Other 1%

  6. Slide 6: North America Pueblo Viejo Overview

    Natural Resource Summit of the Americas April 2-3, 2007 North America Donlin Creek ƒ 2007E production: 3,150-3,250 (000’s oz) ƒ P&P reserves: 45 Moz(1) Eskay Creek CANADA Hemlo Goldstrike Golden Sunlight Turquoise Ridge Marigold Bald Mountain UNITED STATES Cortez Cortez Hills Round Mountain Ruby Hil

  7. Slide 7: Pueblo Viejo 2006 Exploration

    Natural Resource Summit of the Americas April 2-3, 2007 Pueblo Viejo 2006 Exploration(1) (1) Refer to final slide point #4. Pueblo Viejo Project Statistics (100% basis) Capital* US$m 2,100 – 2,300 Pre production LOM Production mozs Au 12.6 produced mozs Ag 63 produced m lb Cu 228 produced m lb Zn 1,

  8. Slide 8: South America Lagunas Norte Now

    Natural Resource Summit of the Americas April 2-3, 2007 South America ƒ 2007E production: 1,850-1,925 (000s oz) ƒ P&P reserves: 38 Moz(1) Lagunas Norte Pierina PERU Zaldivar Pascua-Lama Veladero CHILE ARGENTINA Mines Projects (1) Refer to final slide point #2. Lagunas Norte Now 8

  9. Slide 9: Lagunas Norte Operations

    Natural Resource Summit of the Americas April 2-3, 2007 Lagunas Norte Operations ƒ 8.8 million ounces of proven & probable reserves(1) ƒ 2007: 820,000-850,000 ounces at $140-$155/oz(2) ƒ Large, low cost, long life producer ƒ Provides strong anchor in South America ƒ Exceeded expectations - 1.1 milli

  10. Slide 10: Veladero Operations

    Natural Resource Summit of the Americas April 2-3, 2007 Veladero Operations ƒ 11.4 million ounces of proven & probable reserves(1) ƒ 2007: 550,000-575,000 ounces at $350-$365/oz(2) ƒ Good performance in first full year of operation (2006 - ~510,000 ounces at $168/oz) ƒ Mining has transitioned into h

  11. Slide 11: Zaldivar Operations

    Natural Resource Summit of the Americas April 2-3, 2007 Zaldivar Operations ƒ 5.7 billion pounds of P&P copper reserves(1) ƒ 0.7 billion pounds of M&I copper resources(1) ƒ 2007: ~315 million pounds at ~$0.80/lb(2) ƒ Long life asset: 15+ years ƒ Potential sulphide resources at depth ƒ Opportunity fo

  12. Slide 12: Pascua-Lama Project Statistics

    Natural Resource Summit of the Americas April 2-3, 2007 Pascua-Lama Project Statistics Capital* US$ M 2,300-2,400 Pre-production Phase 2 US$ M 280 -300 LOM Production mozs Au 14.4 produced mozs Ag 550 produced Gold Production kozs/yr 750-775 (first 5yrs) 600 (LOM Average) Silver Production mozs/yr 3

  13. Slide 13: Exploration 2007 Budget

    Natural Resource Summit of the Americas April 2-3, 2007 Exploration 2007 Budget ƒ Distribution of $170 million North America $69M Africa $23M South America Australia $29M Pacific $49M Cortez Hills Lower Zone Long Section – 2006 Lower Zone Highlights (Looking East) Pediment Deposit Cortez Hills Depos

  14. Slide 14: Pascua-Lama Brownfields

    Natural Resource Summit of the Americas April 2-3, 2007 Pascua-Lama Brownfields(1) Targeting: Opportunities Close to Pit Target Areas BRECHA OESTE 3D TARGETS MORRO AMARILLO SURFACE GEOCHEM AU_PPB PASCUA LAMA -99 - 100 101 - 250 251 - 5480 PENÉLOPE EL TORO VELADERO (1) Refer to final slide point #4.

  15. Slide 15: The Case for Barrick

    Natural Resource Summit of the Americas April 2-3, 2007 The Case for Barrick ƒ Largest gold reserves & resources ƒ Strong gold production ƒ Industry’s largest suite of projects ƒ Leverage to gold prices ƒ Inventory includes copper, silver, nickel, PGMs, zinc ƒ Valuation is an opportunity Footnotes 1