Slide 1: Mining Forum Americas 2026
SEPTEMBER 29, 2026 Mining Forum Americas 2026 Mark Hill | Sebastiaan Bock | Tim Cribb
Slide 2: Cautionary Statement on Forward-Looking Information
Cautionary Statement on Forward-Looking Information Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements, o
Slide 3: 2026 Priorities Remain Unchanged
2026 Priorities Remain Unchanged GROUP ATTRIBUTABLE GOLD 1 Safety Continue to improve safety performance PRODUCTION GUIDANCE 2 3.65 Moz 3.75 Moz 2 Operational Consistently deliver production and 3.40 Moz 3.25 Moz 3.30 Moz Delivery cost guidance 2.90 Moz 3 Growth Advance projects at Pueblo Viejo, Lum
Slide 4: Unparalleled Combination of Scale and Growth
NORTH AMERICA Unparalleled Combination of Scale and Growth Tim Cribb | COO, North America
Slide 5: North America Holds the Best Gold Assets
North America Holds the Best Gold Assets Premier jurisdiction with significant growth and exploration potential World’s largest gold Northeast Nevada, USA mining complex Four Tier One Gold Assets2 Open Pit Turquoise Ridge Underground in North America Open Pit & Underground NEVADA GOLD MINES NGM Mine
Slide 6: Growing NGM's Processing Capacity
Growing NGM’s Processing Capacity Additional infrastructure provides production growth, operational flexibility and cost efficiencies at NGM Northeast Nevada, USA Infrastructure Optionality Open Pit NGM has the potential to grow to a >3Mozpa Turquoise Ridge Underground complex (100% basis)2 post 203
Slide 7: Cortez Mining District
Cortez Mining District Increasing production in Cortez district, with Fourmile being integrated into broader district mine-planning Active Areas Cortez Opportunities Exploration Targets Cortez could grow to a sustained >1Mozpa complex (100% basis)2, benefiting from additional processing capacity. ‒
Slide 8: Carlin Mining District
Carlin Mining District Growth from Greater Leeville and optimization of processing capacity Active Areas Carlin Opportunities Exploration Targets Carlin has a proven history of resource conversion and is set to remain a >1Mozpa complex (100% basis)1 for more than a decade, as process capacity is unl
Slide 9: Low-Risk, Low-Capital-Intensity Brownfield Growth Pipeline with Significant Exploration Upside Potential
Low-Risk, Low-Capital-Intensity Brownfield Growth Pipeline with Significant Exploration Upside Potential Brownfield growth opportunities represent growth to drive NGM to a >3Mozpa complex (100% basis)2,3 NGM Growth Potential is Key Brownfield Growth Opportunities2 Material1, 2 (Moz Au; 100% basis) >
Slide 10: Quality Assets Proven Delivery Disciplined Growth
REST OF WORLD Quality Assets Proven Delivery Disciplined Growth Sebastiaan Bock | CEO, Rest of World
Slide 11: Barrick Rest of World: Significant Value Opportunity
Barrick Rest of World: Significant Value Opportunity A platform built on quality assets, proven execution, and a disciplined approach to growth 1 World-Class Assets Portfolio of long-life, high-quality gold and copper assets 2 Operational delivery Optimize the installed asset base, ramp-up Loulo-Gou
Slide 12: World-Class Assets
World-Class Assets GOLD COPPER High-quality long-life gold and copper assets South TOTAL South TOTAL Africa & Africa & America & Rest of America & Rest of Middle East Middle East Asia Pacific World Asia Pacific World KIBALI A premier, multi-decade asset combining underground automation and an indust
Slide 13: Operational Delivery
Operational Delivery Proven operators with strong-track record Loulo-Gounkoto Update Relationships restored – 10-year renewed mining license granted Priority is safe, stable production Mining and processing outperforming – steady ramp-up on schedule Continue consistent delivery of production to plan
Slide 14: Near-Term Copper Growth: Lumwana
Near-Term Copper Growth: Lumwana Construction progressing on schedule Good progress on mill expansion, mill installation expected to commence late 2026 Major long-lead equipment LUMWANA EXPANSION COPPER PRODUCTION procurement complete – deliveries on (Ktpa)1 schedule 240 100% Project remains on sche
Slide 15: Disciplined Approach to Future Growth
Disciplined Approach to Future Growth All projects to compete for capital under the disciplined capital allocation framework Growth opportunities supported by targeted exploration Strong cashflow generation expected from existing operations to support future development Early-stage Brownfield opport
Slide 16: Barrick
BARRICK
Slide 17: Appendix A: Outlook Assumptions/Sensitivity
Appendix A Outlook Assumptions/Sensitivity Production Outlook Assumptions We expect Cortez, Loulo-Gounkoto, Kibali, North Mara and Phoenix to deliver higher year-over-year performances in 2027 relative to 2026, together with stable delivery across the rest of the portfolio. In 2028, the increase in
Slide 18: Endnotes
Endnotes Technical Information The scientific and technical information contained in this presentation has been reviewed and approved by Richard Peattie, MPhil, FAusIMM, Chief Technical Officer; Sam Baldwin, Vice President Geology, MSc, MAIG; Joel Holliday, FAusIMM, Executive Vice President, Explora
Slide 19: Endnotes
Endnotes 2. Reserves and Resources (continued): • South America and Asia Pacific region: Proven mineral reserves of 270 million tonnes grading 0.73 g/t, representing 6.3 million ounces of gold and 360 million tonnes grading 0.30%, representing 1.1 million tonnes of copper. Probable mineral reserves