  1. Slide 1: Anson's Approach to Environment, Social Governance (ESG) - Paradox Basin Project

    For personal use only Fastmarkets Lithium Supply & Markets Conference 2021, Las Vegas  Anson’s Approach to Environment, Social Governance (ESG) Paradox Basin Project

  2. Slide 2: Disclaimer

    DISCLAIMER The information contained in this confidential document ("Presentation") has been prepared by Anson Resources Limited (the "Company"). It has not been fully verified and is subject to For personal use only material updating, revision and further amendment. The Information many not be dist

  3. Slide 3: Corporate Summary

    CORPORATE SUMMARY Overview ▪ Proven track record of 13 years in exploration, For personal use only ASX codeBoard ASN Bruce Richardson, mining and production in public and private companies. Issued capital 980m B.A (Hons) – ▪ >30 years of international business Executive Options on issue: experience,

  4. Slide 4: Investment Opportunity Highlights - Advanced Development Project

    INVESTMENT OPPORTUNITY HIGHLIGHTS – ADVANCED DEVELOPMENT PROJECT For personal use only ▪ Focused on developing the Paradox Brine Project - brine containing Li, Br, I & B ✓ 15ktpa NaBr & 2.7ktpa LCE NPV of $468m after tax IRR 31%1 ✓ Dual product project – Sodium Bromide (NaBr) and lithium carbonate o

  5. Slide 5: Stage PEA: 15ktpa NaBr & 2,674t Li2CO3

    STAGE 1 PEA15KTPA NABR & 2,674MT LI2CO3 For personal use only 20 years After-tax NPV7 Unlevered After- Annual Revenue Annual EBITDA CAPEX US$203m US$5,280/t NaBr US$468m tax IRR 31% US$129m US$97m US$15,000/t LCE Resource Category Clastic Zone Brine Contained (‘000t) Tonnes Li2CO3 BR2 NaBr (Mt) Indi

  6. Slide 6: Paradox Brine Project: Exploration

    PARADOX BRINE PROJECT: EXPLORATION ▪ Review of historical drilling data confirms a massive, supersaturated brine aquifer in the Mississippian Leadville For personal use only Limestone within the Paradox Project claims at approx. 8,000 ft. Leadville Limestone Porosit Density Brine Li Grade Li Li2CO3

  7. Slide 7: Environment, Social & Governance

    Environment, Social & Governance ESG For personal use only

  8. Slide 8: How to build an ESG sustainable mining project?

    Issue : How to build a ESG sustainable mining project ? For personal use only  Objectives:  Adopt new “sustainable” technologies – extraction & processing  Produce a “ESG” product that will gain acceptance in the market  Minimal disturbance to the physical environment, recreational environment a

  9. Slide 9: Unconventional Li Resource Provides Advantage

    UNCONVENTIONAL LI RESOURCE PROVIDES ADVANTAGE For personal use only ▪ Located in Utah, USA in the Paradox Basin ▪ Brine to be extracted from 6,500 feet not in a salar or salt lake ▪ Not from and oil and gas horizon, but from a salt clastic level ▪ Brine flows to the surface under its own pressure an

  10. Slide 10: Roberts Rupture is the source of the brine and of energy

    Roberts Rupture is not only the source of the brine but a source of energy ! For personal use only 10 ASX: ASN

  11. Slide 11: "Sustainable" Extraction

    “Sustainable” Extraction For personal use only ▪ Natural over-pressuring (4,500psi) used to bring the brine to the surface without pumping minimising emissions ▪ Technology and engineering applied to maximise flow rate while retaining sufficient pressure to transport brine to processing plant

  12. Slide 12: "Sustainable" Extraction

    “Sustainable” Extraction ▪ At surface For personal use only ▪ a well-head and connected to a large diameter pipe that will transport the brine to processing ▪ A solar panel to power a valve should the flow need to be stopped ▪ No pumping, no generators, no fuel storage

  13. Slide 13: "Sustainable" Transport of Brine

    “SUSTAINABLE” TRANSPORT OF BRINE For personal use only ▪ By taking advantage of the high-pressure engineers have been able to reduce the number of extraction wells ▪ Extraction from existing wells would have resulted in new ground disturbance 13 ASX: ASN

  14. Slide 14: "Sustainable" Transport of Brine

    “SUSTAINABLE” TRANSPORT OF BRINE For personal use only ▪ Social impact of the project have also been taken into consideration ▪ Area around the well sites is used by people for camping, hiking, bicycling etc ▪ By taking advantage of the high-pressure engineers have been able to reduce the number of

  15. Slide 15: "Sustainable" Processing

    “Sustainable” Processing ▪ Traditional Method Solar For personal use only Evaporation ▪ Up to 12-18 months to evaporate ▪ Test work conducted on site resulted in waste that needed to be trucked away for disposal ▪ Pumping required added to the emissions calculations as well as costs

  16. Slide 16: "Sustainable" Processing - Direct Lithium Extraction

    “Sustainable” Processing ▪ Technology Solution – Direct Lithium For personal use only Extraction (DLE) ▪ Lithium only selected by resin (Absorption) - 6 hours ▪ Pure water is used to wash lithium from resin (Desorption) -3 hours ▪ Production water sourced from the brine ▪ No pre-treatment chemicals

  17. Slide 17: "Sustainable" Infrastructure in Place

    “SUSTAINABLE” INFRASTRUCTURE IN PLACE For personal use only ▪ Existing 30 mile pipeline corridor from wells to production site to be used to transport brine to the processing plant ▪ No additional surface disturbance 17 ASX: ASN

  18. Slide 18: "Sustainable" Infrastructure in Place

    “SUSTAINABLE” INFRASTRUCTURE IN PLACE ▪ Production site near to road, For personal use only rail, gas and electrical infrastructure ▪ Minimal additional ground disturbance 18 ASX: ASN

  19. Slide 19: Governance - USA Well Regulated

    GOVERNANCE – USA WELL REGULATED ▪ Total combined Federal & State ground 95 For personal use only square kilometers ▪ 1,084 Bureau of Land Management (BLM) federal government unpatented placer claims ▪ 2 State of Utah mineral lease, 3 SITLA sections & 80 acres partial section. ▪ 3 State of Utah Indus

  20. Slide 20: Paradox Brine Project: ESG Next Step

    PARADOX BRINE PROJECT: ESG NEXT STEP For personal use only • Significant potential exist to further improve the ESG of the project including energy usage, water usage which are part of the engineering studies that are underway • As part of its continual improvement agenda Anson will examine differen

  21. Slide 21: Thank You - Contact Anson

    Thank You - Contact Anson For personal use only Telephone: +61 478 491 355 Email: info@ansonresources.com Website: www.ansonresources.com Level 1, 35 Outram Street West Perth WA 6005 Australia

  22. Slide 22: Competent Persons' Statements

    COMPETENT PERSONS’ STATEMENTS Competent Person’s Statement 1: The information in this presentation that relates to exploration results and geology is based on information compiled and/or reviewed by Mr Greg Knox, a member in good standing of the Australasian Institute of Mining and Metallurgy. Mr Kn