Anson Resources Limited · ASX:ASN

Anson Resources — Critical Minerals Conference 2026

16 slides from Anson Resources's conference presentation, Jun 16, 2026

  1. Slide 1: Amended Critical Minerals Conference Presentation – May 2026

    June 16, 2026 ASX Announcement Amended Critical Minerals Conference Presentation – May 2026 ASX: ASN Announcement Anson Resources Limited (ASX: ASN) (“Anson” or the “Company”) has amended the announcement dated 21 May 2026 to include further information in accordance with Listing rules 5.19.2 (strea

  2. Slide 2: Green River Lithium Project Critical Minerals Conference Presentation

    Anson Resources | A1 Lithium For personal use only Green River Lithium Project Green River, Utah Critical Minerals Conference Presentation Perth 20 – 21 May, 2026 A1 Lithium’s flagship project, The Green River Lithium Project is in the Paradox Basin, Utah, USA. The Paradox Basin is potentially the l

  3. Slide 3: Investment Overview | Lowest-Cost US Lithium Supply

    A1 Lithium Green River Lithium Project Investment Overview | Lowest-Cost US Lithium Supply For personal use only • Advanced Development Stage o De-risked, largely permitted lithium carbonate production project in Utah. o Near-term demonstration plant, leading to phase-1; 10,000tpa commercial facilit

  4. Slide 4: Disclaimer and Important Notice

    Disclaimer and Important Notice The information contained in this confidential document ("Presentation") has been prepared by Anson Resources Limited Competent Person’s Statement (the "Company"). It has not been fully verified and is subject to material updating, revision and further amendment. The

  5. Slide 5: Lithium Macro | Positive Fundamental Outlook

    Green River Lithium Project Lithium Macro | Positive Fundamental Outlook • Structural lithium demand growth driven by EV penetration and For personal use only stationary battery storage (BESS), with supply deficit emerging • 190 ktpa Deficit in Domestic Supply in 2030 Canaccord Forecasts Global Lith

  6. Slide 6: Resource Update

    Green River Resource Update Resource Expansion • JORC Resource estimate increased by 650%1 For personal use only o Indicated Resource – 183,000 t lithium carbonate, an 863% increase o Inferred Resource – 590,000 t lithium carbonate, a 602% increase • Higher Lithium Grades Confirmed o Lithium assays

  7. Slide 7: Low Capex | Private Land & Existing Infrastructure

    Green River Lithium Project Low Capex | Private Land & Existing Infrastructure For personal use only 6

  8. Slide 8: Resource Geology – Lower Cost

    Green River Resource Geology – Lower Cost Less Pumping Cost | Natural Pressure of 4,500 to 6,000 psi For personal use only UTAH MOUNTAINS North & W est For Illustration Purposes Only 7

  9. Slide 9: Brine Composition – Purity is Supreme

    Green River Brine Composition1 – Purity is Supreme Low Impurity Brine – Lower Processing Costs For personal use only *HGA, 2023. Southwest Arkansas Project Pre-Feasibility Study NI 43-101 Technical Report, prepared for Standard Lithium, Lewisville, Lafayette County, AR, August 8, 212p. **Dobson, P.

  10. Slide 10: Engineering Study – Lowest Cost US Project

    Green River Lithium Project Engineering Study1 – Lowest Cost US Project Key Project Metrics For personal use only % Production Total Revenue NPV pre-tax IRR 10,000 tpa $5.2B $1.4B 27% C1 OPEX/t LCE CAPEX Annual EBITDA Project Life $3,837 $569M $216M 20 years The information is extracted from the rep

  11. Slide 11: Low-Cost US Lithium Supply

    Green River Lithium Project Low-Cost US Lithium Supply For personal use only US Lithium Cost Curve 2035, Source: Benchmark Q1 2026 Forecast, See Appendix 1 for project stage 10

  12. Slide 12: Global Lithium Cost Curve 2035

    For personal use only - 2,000 8,000 4,000 6,000 10,000 12,000 14,000 16,000 18,000 - Salar de Atacama (NovAndino Litio) Salar de Atacama (Albemarle) Kt LCE US$/t LCE Olaroz 500 Mariana Qarhan (China Salt Lake) Hell's Kitchen Sal de Vida South West 1,000 Dahongliu Hombre Muerto West Kachi Greenbushes

  13. Slide 13: Strategic Cooperation with POSCO Holdings

    Strategic Cooperation with POSCO Holdings Demonstration Plant Advancing Toward Commercial Validation For personal use only Major Strategic Milestone Achieved 1 • Board approved terms, definitive agreement expected to be signed before end of Q2 2026 • Demonstrates strong technical validation of Green

  14. Slide 14: Major Milestones Accomplished

    Green River Lithium Project Major Milestones Accomplished For personal use only • Binding Demonstration Plant terms for Green River Utah. POSCO to fully fund, design, construct and operate a continuous Direct Lithium Extraction (“DLE”) Demonstration Plant • Definitive offtake agreement signed1 for 4

  15. Slide 15: Key Catalysts

    Green River Lithium Project Key Catalysts 2026 2027 2028+ For personal use only ENGINEERING AND DEMONSTRATION PLANT CONSTRUCTION FULL SCALE PRODUCTION PHASE 1 FULL SCALE PRODUCTION Phase 1 INITIATE PHASE 2 - MODULAR EXPANSION $30M $569M | 10,000 tpa Resource Resource • Upgraded JORC Resource 773,000

  16. Slide 16: Appendix 1: Project Stage for US Projects

    Appendix 1: Project Stage for US Projects For personal use only 15

Anson Resources — Critical Minerals Conference 2026 on 6ix