  1. Slide 1: Investor Call, November 2, 2016

    Investor Call November 2, 2016 EVERSSURCE ENERGY

  2. Slide 2: Safe Harbor

    Safe Harbor All per share amounts in this presentation are reported on a diluted basis. The only common equity securities that are publicly traded are common shares of Eversource Energy. The earnings and EPS of each business do not represent a direct legal interest in the assets and abilities alloca

  3. Slide 3: Agenda

    Investor Call Agenda Phil Lembo = Q3 and YTD 2016 Results EVP, CFO & Treasurer \ = Transmission Projects Update = Regulatory and Legislative Update Lee Olivier EVP Enterprise Strategy & = Northern Pass Business Development = Access Northeast EVERS: URCE

  4. Slide 4: Phil Lembo

    Phil Lembo Executive Vice President, Chief Financial Officer and Treasurer EVERSSURC ENERGY

  5. Slide 5: Third Quarter and Nine Months Results

    Investor Call Third Quarter and Nine Months Results Nine Months Nine Months 2016 bois nage Q3 2016 Q32015 Change Electric Transmission $0.28 $0.24 $0.04 $0.84 $0.70 $0.14 Electric Distribution $0.53 $0.53 $0.00 $1.20 $1.32 ($0.12) Natural Gas Distribution ($0.02) ($0.01) —($0.01) $0.16 $0.18 ($0.02)

  6. Slide 6: Progress on Major Transmission Reliability Projects

    Progress on Major Transmission Reliability Projects Greater Hartford Central Connecticut Greater Boston Reliability Solutions (GHCC) + 27 projects including seven new transmission ETS SC ISG eC no WI SECE lines, new substations and substation expansion cts + Eight projects under construction, eight

  7. Slide 7: Key Elements of New Massachusetts Energy Legislation — H 8

    Key Elements of New Massachusetts Energy Legislation — H 4568 — An Act to Promote Energy Diversity * Signed by Governor Baker on 8/8/16 + Authorizes long-term contracting for 1,600 MW of off-shore wind + First solicitation for at least 400 MW commencing on or before 6/30/17 with full obligation comp

  8. Slide 8: Recent State Regulatory Developments

    Investor Call Recent State Regulatory Developments ey S. Ons Massachusetts Solar Filing New Hampshire Generation Divestiture = 62 MW proposal filed with DPU 5/30/16 = Settlement approved by NHPUC on 7/1/16 = 35 MW for NSTAR Electric = J.P. Morgan hired by NHPUC as auction adviser + 27 MW for WMECO *

  9. Slide 9: Multiple Complaints Pending at FERC Regarding New England Transmission ROE

    Investor Call Multiple Complaints Pending at FERC Regarding New England Transmission ROE FERC ROE COMPLAINTS " First complaint decided in 2014; resulted in base ROE of 10.57% and project cap of 11.74% = Appeal pending in DC Circuit Court—Oral arguments 12/6/16 = ALJ’s recommended decision issued in

  10. Slide 10: Lee Olivier

    Lee Olivier EVP Enterprise Energy Strategy & Business Development EVERSSURC ENERGY

  11. Slide 11: Transmission — Northern Pass Update

    Investor Call Transmission — Northern Pass Update 1,090 MW of clean energy $1.6 billion HVDC line, terminal and AC facilities Approximately 192 miles of new transmission using HVDC technology with AC/DC converters in Quebec and NH DOE draft Environmental Impact Statement issued 7/21/15 Revised route

  12. Slide 12: Northern Pass Timeline

    July 21, 2015 Department of Energy (DOE) issued Draft Environmental Impact Statement (Els) Northern Pass Timeline { september 30, 2017 NHSEC-approved deadline for issuing decision December 18, 2015 Northern Pass NHSEC accepted filed application application with New a Hampshire Site Evaluation ommitt

  13. Slide 13: Access Northeast - Designed to Provide a Long-Term Solution to Challenge of New England Natural Gas Supply

    Investor Call Access Northeast - Designed to Provide a Long-Term Solution to Challenge of New England Natural Gas Supply my Ps g Maritimes & \; . Northeast }. Project Scope: * Joint development with Eversource (40%), be AGT and M&N systems directly 7 Spectra Energy (40%) and National Grid = « ‘conne

  14. Slide 14: Most New England States Addressing Natural Gas Capacity Issues

    Investor Call Most New England States Addressing Natural Gas Capacity Issues CT MA Electric Distribution Co. (EDC) Purchase of Natural Gas Pipeline Capacity Order of 10/2/15 found the DPU had authority to approve EDC natural gas supply contracts. DPU ruling vacated by Massachusetts Supreme Judicial

  15. Slide 15: New England's Natural Gas Transmission Capacity Dilemma Today

    Investor Call New England’s Natural Gas Transmission Capacity Dilemma Today + NewEngland natural gas (and power) market prices are highest in the country + Marcellus area prices low as low cost production looks for outlets but pipeline projects lack funding or are delayed, trapping gas just west of

  16. Slide 16: That Dilemma Intensifies as 2,000-3,000 MW of Non-Gas Generation Retire by Mid-2019

    That Dilemma Intensifies as 2,000-3,000 MW of Non-Gas Generation Retire by Mid-2019 and is Replaced Primarily by Gas Generation New England Gas-Fired Power Plant Capacity lm Gas Primary (Dual Fuel) Gas Only 20,000 15,000 10,000 5,000 - A Existing Winter Capacity (MW) Winter Capacity - Including Capa

  17. Slide 17: ISO-NE's Tale of Two Seasons

    Investor Call ISO-NE’s Tale of Two Seasons = @ Midcontinent iso continent ISO $28.78/MWh $29.31/MWh $280/MMBtu $374/MMBtu (at Chicago City Gate) (at Chicago City Gate) @ 180 Now England @ !SONew England $26.86/MWh_ $76.64/MWh Ss2/MMBtu s1070/MBtu (at Algonquin City Gate) (at Aigonguin City Gate) ‘So