Slide 1: ASX Release: Paralana Project technical presentation to PESA
ASX Release PETRATHERM LIMITED ABN 17 106 806 884 Paralana Project technical presentation to Petroleum Exploration Society of Australia Petratherm’s Exploration Manager, Peter Reid, will today present the latest technical update on the Company’s flagship Paralana Project at the South Australian Basi
Slide 2: The Paralana – Engineered Geothermal Energy Project
The Paralana – Engineered Geothermal Energy Project PESA SA Basins Symposium Presented by Exploration Manager Peter Reid Friday, March 26, 2010
Slide 3: Disclaimer
Disclaimer This presentation has been prepared by Any forward-looking statements included in Petratherm makes no representation or Petratherm Limited (Petratherm). The this document involve subjective judgment warranty as to the accuracy, reliability or information contained in this presentation is
Slide 4: Exploring for Heat – Paralana Project
Exploring for Heat – Paralana Project 62uWm-3 22uWm-3 Insulator Up to 20 times normal granite: average = 8 times Permian Mt Painter Basement Adelaidean Curnamona Mt Painter Basement Basement Normal basement Early modelling indicated 180oC - 200oC at approximately 4 km
Slide 5: Poontana Basin
Poontana Basin 109oC › Heat flow of 129 mWm-2 › Modeled 180oC-200oC at ~ 4 km (Seismic Line 84 SPG)
Slide 6: Development Model – Heat Exchanger Within Insulator
Development Model – Heat Exchanger Within Insulator › Higher Permeability › Chemically Stable › Lower Frac Challenge? › Adelaidean – bedding / joint surfaces = Cheaper Power!
Slide 7: Paralana Project – Commercial Overview
Paralana Project – Commercial Overview › Commercially viable at all stages. Small off grid market (5-30MWe) (Heathgate) followed by large on grid development (260 MWe+) › Expenditure well leveraged for proof of concept, then potentially fully funded to initial commercial demonstration scale 30MW pla
Slide 8: Passive Seismic Array
Passive Seismic Array MEQ - Array Managed by IESE
Slide 9: Recording Period April 08 – June 09
Recording Period April 08 – June 09
Slide 10: Pre-stimulation Seismic Events
Pre-stimulation Seismic Events Recording Period April 2008 – June 2009 Array detecting small events
Slide 11: Paralana 2 – Drilling
Paralana 2 – Drilling New Weatherford Owned 2000HP Le Tourneau Lightning Rig 57 metres high ~ 10 Stories Arrived at Port Pirie 11 May 09 85 Semi-Trailer Loads Spudded June 30, 2009
Slide 12: Paralana 2 - Operations
Paralana 2 - Operations › Petratherm/Beach – extensive stakeholder and community consultation – Adnyamathanha Community, Beverley Uranium Mine , Epic Pipe line, Arkaroola Village › Beach Petroleum – Manager of Drilling Operations › HSE - no lost time injuries › Only minor shake down issues › Hand-pi
Slide 13: Scenario Planning vs. Murphy’s Law
Scenario Planning vs. Murphy’s Law
Slide 14: Paralana 2 – Drilling
Paralana 2 – Drilling Very Hard Rock Formations – slow ROP 1-3 m/hr Tested several BHA arrangements to optimise ROP
Slide 15: Paralana 2 - Drilling Completed to 4012 M
Paralana 2 - Drilling Completed to 4012 M – 9 Nov 2009 First well designed following low-risk, standard operating methods Steady but slow drilling due to hard formations Conservatively drilled to ensure success to 4012m Wireline and LWD logging completed Well cased and cemented to 3725m Bottom hole
Slide 16: Paralana 2 – Reservoir Characteristics
Paralana 2 – Reservoir Characteristics Inflow zones from 3690m Zr dataing confirms old 1590Ma Reservoir Sequence Contains numerous fractures and faults High pressure geothermal brines intersected 2D Seismic suggests fractured reservoir sequence is regionally extensive
Slide 17: Current Planned Future Work Program
Current Planned Future Work Program 1st Qtr 2010: Fracture stimulation design 2nd Qtr 2010: Fracture stimulation – link into over pressured zone! 4th Qtr 2010/1st Qtr 2011: Drilling of the Paralana 3 deep producer well 2nd Qtr 2010: Circulation Test – Proof of Concept Late 2011: Commission first sta
Slide 18: www.petratherm.com.au
www.petratherm.com.au = @) petratherm