    ASX Release PETRATHERM LIMITED ABN 17 106 806 884 For personal use only MD Presentation to Resources & Energy Sector Infrastructure Council Petratherm Managing Director, Mr Terry Kallis, will later this morning present on the Industry’s and Petratherm’s progress on matters relating to electricity tr

  2. Slide 2: For personal use only

    For personal use only

  3. Slide 3: Petratherm RESIC Presentation

    For personal use only Petratherm RESIC Presentation Presented by Managing Director Terry Kallis 21 October , 2009

  4. Slide 4: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Any forward-looking statements included in Petratherm makes no representation or Petratherm Limited (Petratherm). The this document involve subjective judgment warranty as to the accuracy, reliability or information contained in

  5. Slide 5: Presentation Overview

    Presentation Overview For personal use only › Industry background › Geothermal energy cost drivers › Industry reports from MMA › Industry summary and challenges › Renewable energy policies and geothermal › Network connection issues › Petratherm network solution › Industry network issues › MMA report

  6. Slide 6: Growth in geothermal energy projects

    Growth in geothermal energy projects For personal use only Industry Snapshot › Resource potential is huge 26,000 times the annual primary energy production of Australia › GELS/GELAS › Australia 383 › Expenditure more than $1,500 Million Geothermal well › 48 companies in total Exploration licence › 1

  7. Slide 7: Geothermal energy cost drivers

    Geothermal energy cost drivers For personal use only Cost Drivers › Temperature › Drilling Depth › Flow Rate › Network Connection › Generation Plant › High upfront costs – drilling, fracture stimulation, connection, plant › Project economics are geology and location specific

  8. Slide 8: Landmark independent industry reports

    Landmark independent industry reports For personal use only › Independent reports by McLennan Magasanik Associates – 2007 & 2008 › Geothermal energy is expected to be the lowest cost from renewable energy by 2030 and directly competitive with coal by 2050 › Geothermal energy is expected to build up

  9. Slide 9: Australian geothermal industry summary and challenges

    Australian geothermal industry summary and challenges For personal use only › Geothermal energy has the potential to provide large scale, base load and low- cost renewable energy - $120/MWh (50MW) and $80/MWh (>300 MW) › Australia has the key ingredients for developing successful engineered geotherm

  10. Slide 10: Renewable energy policy and geothermal

    Renewable energy policy and geothermal For personal use only Strong Federal and State Strong industry networks Government support › Geothermal energy industry › $50 million geothermal drilling development framework program with a maximum $7 million per project › Australian Geothermal Energy › $300 m

  11. Slide 11: Transmission Network Connection Issues

    Transmission Network Connection Issues For personal use only › Transmission Costs › Transmission Losses › Transmission Congestion – south east of SA › Marginal Loss Factors › System Security › Quality of Supply › Development approvals, licensing, easements and permits › Network Capacity at each conn

  12. Slide 12: Petratherm - Paralana transmission plan

    Petratherm - Paralana transmission plan For personal use only › Close to customer at the Beverley mine – only 10 kilometres away › Plans for mine expansions Four Mile deposit and new areas under exploration › Longer term plan to supply large-scale base load power through entry points at Port Augusta

  13. Slide 13: Industry transmission issues – northern SA

    Industry transmission issues – northern SA For personal use only › Many geothermal energy projects in the northern part of South Australia significant challenges to get to market › AGEA NEM Committee to address challenges – work plan › AGEA NEM Concept Paper developed › AEMC review of gas and electr

  14. Slide 14: MMA report and AEMC – industry network solution

    MMA report and AEMC – industry network solution For personal use only › 2009 independent report by McLennan Magasanik & Associates (MMA) shows savings in linking geothermal projects in the northern part of South Australia early to the National Electricity Market (NEM) › MMA estimates benefits of $86

  15. Slide 15: Where to from here?

    Where to from here? For personal use only › MCE consider AEMC‟s report and submit rules changes to AEMC by December 2009 › AEMC undertake rule change process and complete by September 2010 › AEMO required to undertake National Transmission Network Plan – including candidates for SENEs › AGEA updated